⚠ No class in the bridge ontology fits this itemAdd a class
The ontology would need a deck continuity detail or continuous-deck connection class.
Notes on the sheets that carry it
- p21. ALL DIMENSIONS AR… OTHERWISE SPECIFIED.
- p22. DIMENSIONS ARE IN… FOLLOWED.
- p23. THIS DRAWING SHAL… ALIGNMENT DRAWIN…
- p24. THE BRIDGE HAS B… CLASS 70R + TWO… 70R OR SV LOADING
- p25. GRADE OF CONCRE… FOLLOWS:
- p2• PSC PRECAST GIR…
- p2• R.C.C. CAST IN S…
- p2• R.C.C. ENDORSE…
- p2RCC CRASH BARRIER
- p2FRL
- p2DECK CONTINUITY
- p2PRECAST PSC GIRDER (TYP.)
- p2RCC SEISMIC STOPPER
- p2POT-PTFE BEARING (TYP.)
- p2RCC COLUMN PIER
- p2RCC PILECAP
- p21200 DIA BORED CAST-IN-SITU PILES
Every crop it was read in — the drawing beside what the model took off it
Page 2
p02_r01 notesElevation
- deck continuity×1continuous deckAt pier P1.
40000(SQ) 46188(SK) span dimension46000(SK) 46188(SK) span dimension37761(SQ) 43602(SK) bridge length dimension37761(SQ) 43602(SK) bridge length dimension80(SQ) 92(SK) expansion gap80(SQ) 92(SK) expansion gap1070(SQ) 1236(SK) end offset1170(SQ) 1350(SK) pier-side offset+34 more
p02_r04 section b bSection
- deck continuity×1joint/continuity detail
1170(SQ) bearing centreline offset, SQ1350(SK) bearing centreline offset, SK230 deck depth230 deck depth2650 girder depth2650 girder depth1500(SK) horizontal dimension1500 vertical dimension+11 more