Matched toStructural Backfillbridge.approach_earthwork_system.structural_backfillon “back filling material”
| The class asks for | Value | How | From |
|---|---|---|---|
| VolumeVwants m3 | not establishedThe notes require back filling material behind the abutment to be well compacted, but provide no backfill dimensions, extents, section geometry, or quantity from which volume can be calculated. | not found | |
| Material TypeMAT | not establishedThe item-specific note identifies back filling material behind the abutment and requires compaction in accordance with Appendix 6 of IRC 78:2014 and MORTH specification, but does not state a material type. The separate selected earth fill specification applies to backfilling behind the RE wall, not explicitly to the abutment backfill item. | not found |
Worked out by openai/gpt-5.6-terra-pro from the readings below, which are the source. A derived value shows its arithmetic — check it against the drawing before it is priced.
How the sheets named it
Notes on the sheets that carry it
- p21. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS ARE IN METERS UNLESS OTHERWISE SPECIFIED.
- p22. DIMENSIONS ARE NOT TO BE SCALED. ONLY WRITTEN DIMENSIONS SHALL BE FOLLOWED.
- p23. THIS DRAWING SHALL BE READ IN CONJUNCTION WITH RESPECTIVE HIGHWAY ALIGNMENT DRAWINGS.
- p24. THE BRIDGE HAS BEEN DESIGNED FOR FOUR LANE OF CLASS A, ONE LANE CLASS 70R + TWO LANE OF CLASS A, ONE LANE OF 70R + ONE LANE OF 70R OR SV LOADING WHICHEVER GOVERNS, IS CONSIDERED AS LIVE LOAD.
- p25. GRADE OF CONCRETE FOR VARIOUS STRUCTURAL COMPONENTS SHALL BE AS FOLLOWS:-
- p26. CLEAR COVER TO ANY REINFORCEMENTS SHALL BE AS FOLLOWS:
- p27. ALL REINFORCING STEEL SHOULD BE HIGH YIELD STRENGTH DEFORMED (TMT) BARS OF GRADE-Fe 550D, CONFORMING TO IS: 1786.
- p28. STRIP SEAL TYE OF EXPANSION JOINT SHALL BE PROVIDED AS PER M O R T H SPECIFICATION.
- p29. BITUMINOUS CONCRETE 50MM THICK LAID IN SINGLE LAYER.
- p210. FRL, CAMBER / SUPER ELEVATION & LAYOUT SHALL BE FOLLOWED AS PER LATEST PLAN & PROFILE DRAWING.
- p211. DRAINAGE SPOUT SHALL BE PROVIDED IN DECK SLAB AS PER M O R T H SPECIFICATION.
- p212. BACK FILLING MATERIAL BEHIND ABUTMENT SHALL BE WELL COMPACTED AS PER APPENDIX 6 OF IRC 78:2014 & M O R T H SPECIFICATION BEFORE RESTING THE SUPERSTRUCTURE.
- p213. THE STRUCTURE IS LOCATED IN SEISMIC ZONE III AND WIND ZONE IV & ’SEVERE’ EXPOSURE CONDITION.
- p214. DIMENSION OF STRUCTURES ARE TENTATIVE AND WILL BE FINALIZED AFTER DETAIL DESIGN.
- p215. THE SELECTED EARTH FILL USED FOR BACKFILLING BEHIND RE WALL SHALL HAVE THE FOLLOWING PROPERTIES. C=0, ø>32°,γ=2T/m³
- p216. THE PIERCAP TOP LEVEL HAS BEEN FIXED CONSIDERING 400mm DEPTH OF BRG. & PEDESTAL. IN CASE THE BEARING HEIGHT IS LESS THAN THAT OF 200mm THEN THE HEIGHT OF THE BEARING SHALL BE ADJUSTED IN 200mm PEDESTAL.
- p217. FOR DIMENSION & REINFORCEMENT DETAILS OF APPROACH SLAB, GAP SLAB, CRASH BARRIER & DRAINAGE SPOUTS REFER MISCELLANEOUS DRG.
- p218. TENTATIVE WORKING PILE LOAD AND SUBJECTED TO CHANGE AS PER DETAILED DESIGN:–
Every crop it was read in — the drawing beside what the model took off it
Page 2
p02_r03 notesNotes
- back filling materialBehind abutment; to be well compacted.
M50 PSC PRECAST GIRDER concrete gradeM45 R.C.C. CAST IN SITU DECK SLAB concrete gradeM45 R.C.C. END CROSS GIRDER concrete gradeM45 R.C.C. INTERMEDIATE CROSS GIRDER concrete gradeM50 BEARING PEDESTAL concrete gradeM40 CRASH BARRIER concrete gradeM30 APPROACH SLAB concrete gradeM15 LEVELLING COURSE concrete grade+17 more