Matched toExcavation Shoringbridge.construction_system.shoringon “Temporary Shoring”
4 not established
| The class asks for | Value | How | From |
|---|---|---|---|
| LengthLwants m/mm | not establishedThe note "TEMPORARY SHORING AS NECESSARY, TYP." identifies temporary shoring, but this plan crop does not show its extent or assign any dimension to the shoring. Nearby dimensions apply to bridge, track, alignment, or clearance geometry rather than the shoring. | not found | |
| HeightHwants m/mm | not establishedNo temporary-shoring height is stated. This is a plan view, and the listed clearance dimensions are not identified as shoring height. | not found | |
| Surface AreaA_surfacewants m2 | not establishedTemporary shoring extent, length, height, and area are not shown; therefore no surface area can be derived. | not found | |
| Material TypeMAT | not establishedThe temporary-shoring note gives no material or shoring system type. | not found |
Worked out by openai/gpt-5.6-terra-pro from the readings below, which are the source. A derived value shows its arithmetic — check it against the drawing before it is priced.
Notes on the sheets that carry it
- p1POINT OF MIN. VERT. CLEARANCE
- p1FUTURE POINT OF MIN. VERT. CLEARANCE
- p1TO BE REMOVED
- p1TEMPORARY SHORING AS NECESSARY, TYP.
- p1MIN. HORIZ. CL. CALCULATED TO FACE OF COLUMN
Every crop it was read in — the drawing beside what the model took off it
Page 1
crop
p01_r01 plan of bridge bents walls and rail crossingPlan
- temporary shoringCalled out at the end-bridge area; extent and type are not shown in this crop.
12'-1" MIN. minimum dimension74'-7 5/16" dimensionN 2°-23'-16.7" E bearing75'-10 15/16" dimension1'-9 1/2" dimension6'-0" spacing6'-0" spacing40'-0" width+25 more