Drawing to BOQpipeline control sheet
← Mindmapwhat the drawings said

Endfill Control Point

1 page · 2 crops · ×2 · earthwork

⚠ No class in the bridge ontology fits this itemAdd a class

The ontology would need an earthwork grading control-point class.

How the sheets named it

*

Notes on the sheets that carry it

  • p1TOP OF HIGH RAIL, TYP.
  • p1ENDFILL CONTROL POINT, TYP.
  • p1* NORMAL TO RR ℄
  • p1NO SCALE

Every crop it was read in — the drawing beside what the model took off it

Page 1

crop

p01_r03 endfill control diagram

page 1 · gdot_plan_1_050106c481ea4f86900e478c2e4a98a6_p01_r03_endfill_control_diagram
Original
p01_r03 endfill control diagram
{
  "view": "Detail",
  "objects": [
    {
      "name": "endfill",
      "tag": "",
      "shape": "sloping profile",
      "material": "",
      "count": 1,
      "note": "Shown with a 1/2 side slope."
    },
    {
      "name": "endfill control point",
      "tag": "",
      "shape": "point",
      "material": "",
      "count": 1,
      "note": "Called out as typical."
    },
    {
      "name": "high rail",
      "tag": "",
      "shape": "linear",
      "material": "",
      "count": 1,
      "note": "Top of high rail is called out as typical."
    }
  ],
  "measurements": [
    {
      "label": "horizontal dimension",
      "value": "15'-0\"",
      "unit": "",
      "appliesTo": "From ℄ FUTURE TRACK to first vertical control line"
    },
    {
      "label": "horizontal dimension",
      "value": "4'-0\"",
      "unit": "",
      "appliesTo": "Between vertical control lines"
    },
    {
      "label": "horizontal dimension",
      "value": "2'-0\"",
      "unit": "",
      "appliesTo": "Between vertical control lines"
    },
    {
      "label": "vertical dimension",
      "value": "4'-9\"",
      "unit": "",
      "appliesTo": "TOP OF HIGH RAIL, TYP."
    },
    {
      "label": "slope",
      "value": "1/2",
      "unit": "",
      "appliesTo": "endfill"
    }
  ],
  "notes": [
    "TOP OF HIGH RAIL, TYP.",
    "ENDFILL CONTROL POINT, TYP.",
    "* NORMAL TO RR ℄"
  ],
  "labels": [
    "℄ FUTURE TRACK",
    "ENDFILL CONTROL DIAGRAM",
    "NO SCALE"
  ],
  "description": "This crop shows an endfill control diagram, identified as no scale. It depicts the endfill profile and typical control point relative to the future track centerline and top of high rail."
}

p01_r03 endfill control diagramDetail

  • endfill control point×1pointCalled out as typical.

15'-0" horizontal dimension4'-0" horizontal dimension2'-0" horizontal dimension4'-9" vertical dimension1/2 slope

crop

p01_r03

page 1 · track_endfill_grading_p01_r03
Original
p01_r03
{
  "view": "Detail",
  "objects": [
    {
      "name": "Future track",
      "tag": "",
      "shape": "linear track profile",
      "material": "",
      "count": 1,
      "note": "Shown at left with a dashed centerline marked by a centerline symbol."
    },
    {
      "name": "Endfill grading profile",
      "tag": "",
      "shape": "sloping and stepped earthwork profile",
      "material": "",
      "count": 1,
      "note": "Profile rises to the endfill control point at the right."
    },
    {
      "name": "Endfill control point",
      "tag": "*",
      "shape": "point",
      "material": "",
      "count": 1,
      "note": "Called out as typical."
    }
  ],
  "measurements": [
    {
      "label": "horizontal distance from future track centerline to first control line",
      "value": "15'-0\"",
      "unit": "",
      "appliesTo": "Future track / endfill control diagram"
    },
    {
      "label": "horizontal spacing",
      "value": "4'-0\"",
      "unit": "",
      "appliesTo": "Endfill control diagram"
    },
    {
      "label": "horizontal spacing",
      "value": "2'-0\"",
      "unit": "",
      "appliesTo": "Endfill control diagram"
    },
    {
      "label": "vertical distance, typical",
      "value": "4'-9\"",
      "unit": "",
      "appliesTo": "Endfill control diagram"
    },
    {
      "label": "slope horizontal component",
      "value": "2",
      "unit": "",
      "appliesTo": "Endfill grading profile"
    },
    {
      "label": "slope vertical component",
      "value": "1",
      "unit": "",
      "appliesTo": "Endfill grading profile"
    }
  ],
  "notes": [
    "TOP OF HIGH RAIL, TYP.",
    "ENDFILL CONTROL POINT, TYP.",
    "* NORMAL TO RR ℄",
    "NO SCALE"
  ],
  "labels": [
    "FUTURE TRACK",
    "ENDFILL CONTROL DIAGRAM"
  ],
  "description": "This crop is an endfill control diagram for a future railroad track, shown with the top of high rail and a graded endfill profile. It documents horizontal offsets, a typical 4'-9\" vertical dimension, and a 2-to-1 indicated slope to the typical endfill control point."
}

p01_r03Detail

  • Endfill control point*×1pointCalled out as typical.

15'-0" horizontal distance from future track centerline to first control line4'-0" horizontal spacing2'-0" horizontal spacing4'-9" vertical distance, typical2 slope horizontal component1 slope vertical component