Drawing to BOQ
pipeline control sheet
Crop
Mindmap
Normalization
Final BOQ
Projects
Back
Back to projects
GDOT 22
Bridge · USA
Status
processed
PDF files
1
Pages
3
Objects
24
Processing
100%
main viewer
Selected page objects
9 objects visible
Max tier — full AI analysis. Every image carries an AI explanation of what it shows.
Title Block
title block with project, bridge, and firm identification
90%+
Bent Elevations
table listing bent station and PGL elevation values
90%+
Construction Clearance Envelope Relative To Track
clearance envelope diagram showing 22'-0" height and 13'-0" offsets from track centerline
90%+
Project Identification
GDOT logo with project P.I. number block
90%+
Vertical Curve Data Of Roadway Profile Grade Line
vertical curve diagram showing PVI station, elevation, and grades for SR 21 westbound PGL
90%+
Endfill Slope Control At Future Track
typical section showing rail endfill slope control dimensions
90%+
Bridge Notes
general notes on bent alignment, stationing, and vertical clearances
90%+
Bridge
plan of skewed bridge over railroad with bent lines and clearances
90%+
Bridge Over Railway
partial plan and elevation of bridge bents over railway
90%+