Matched toRiprap Protectionbridge.drainage_protection_system.riprapcheckon “apron”
| The class asks for | Value | How | From |
|---|---|---|---|
| LengthLwants m/mm | not establishedThe launching apron appears in the 1:300 longitudinal elevation only as a leader-line callout 'LAUNCHING APRON' at the embankment toe on both approaches. No dimension line, no plan view and no schedule in these crops gives an apron length; all dimensioned values on the elevation belong to spans, bearings, pile caps, piles, approach slab, PCC course or filter media. Nothing can be honestly derived. | not found | |
| WidthWwants m/mm | not establishedNo width dimension is annotated to the apron in either reading of the elevation. The only 'width' figures present (12300, 5100) are explicitly labelled as pile cap widths for A1, A2 and P1 and must not be transferred to the apron. | not found | |
| Layer ThicknessT_layerwants m/mm | not establishedNo thickness is stated for the launching apron. The thickness values on this sheet are owned by other items: 300 THK. approach slab, 150 THK. PCC levelling course and 600 THK. filter media behind the retaining walls; none of these is the apron's layer thickness. | not found | |
| VolumeVwants m3 | not establishedNo quantities table or BOQ line for the launching apron appears in these crops, and the geometric inputs are all missing, so the volume cannot be read or derived. | not found | |
| Material TypeMAT | stone / concrete blocks (apron material not printed on drawing) -Crop bridge_deck_piers_and_abutments_p02_r02 records the launching apron object with material 'stone/concrete blocks'; the second reading of the same elevation records the material field as blank.The only printed text against this item is the bare callout 'LAUNCHING APRON'; the material is an attribution in one reading of the elevation and is left empty in the other, and the notes block (concrete grades) is cut off at the crop edge. Adjacent slope protection is called STONE PITCHING, which is consistent with a stone/block apron, but the drawing does not state the apron material outright, so confidence is low and the value should be confirmed against the protection-works detail or specification. | readcheck | p2 · p02_r02p2 · p02_r02 elevation of bridge deck piers and abutments bridge at ch 64 412 |
Worked out by anthropic/claude-opus-5 from the readings below, which are the source. A derived value shows its arithmetic — check it against the drawing before it is priced.
Notes on the sheets that carry it
- p2NOTES:
- p21. ALL DIMENSIONS ARE IN M... OTHERWISE SPECIFIED. (text cut off at right edge)
- p22. DIMENSIONS ARE NOT TO ... FOLLOWED. (partial)
- p23. THIS DRAWING SHALL BE ... ALIGNMENT DRAWINGS. (partial)
- p24. THE BRIDGE HAS BEEN DE... CLASS 70R + TWO LANE ... 70R OR SV LOADING WHIC... (partial)
- p25. GRADE OF CONCRETE FOR ... FOLLOWS:—
- p2• PSC PRECAST GIRDER ——... (partial)
- p2• R.C.C. CAST IN SITU D... (partial)
- p2• R.C.C. END CROSS GIRDE... (partial)
- p2• R.C.C. INTERMEDIATE CROS... (partial)
- p2• BEARING PEDESTAL ——... (partial)
- p2300 THK. APPROACH SLAB
- p2150 THK. PCC LEVELING COURSE
- p2RCC CRASH BARRIER
- p2DECK CONTINUITY
- p2POT-PTFE BEARING (TYP.)
- p2RCC COLUMN PIER (TYP.)
- p21200# RCC CAST IN SITU PILE (TYP.)
- p2PRECAST PSC GIRDER (TYP.)
- p2WALL TYPE ABUTMENT
- p2INDEPENDENT RETAINING WALL
- p2STONE PITCHING
- p2600 THK. FILTER MEDIA
- p2LAUNCHING APRON
- p21. ALL DIMENSIONS ARE IN [text cut off] OTHERWISE SPECIFIED.
- p22. DIMENSIONS ARE NOT TO [text cut off] FOLLOWED.
- p23. THIS DRAWING SHALL BE [text cut off] ALIGNMENT DRAWINGS.
- p24. THE BRIDGE HAS BEEN [text cut off] CLASS 70R + TWO LANE[S] [cut off] 70R OR SV LOADING WH[text cut off]
- p25. GRADE OF CONCRETE FO[R] [cut off] FOLLOWS:-
- p2• PSC PRECAST GIRDER - [value cut off]
- p2• R.C.C. CAST IN SITU [text cut off]
- p2• R.C.C. END CROSS GIRD[ER] [cut off]
- p2• R.C.C. INTERMEDIATE CR[OSS ...] [cut off]
- p2• BEARING PEDESTAL [partially cut off at bottom edge]
Every crop it was read in — the drawing beside what the model took off it
Page 2
p02_r02Elevation
- Launching apron×1rectangular apronstone/concrete blocksCallout on left (Dewas) side; similar element drawn on right side
40000(SQ) 46188(SK) Span (C/L exp. joint to C/L brg. at pier), left span46000(SK) 46188(SK) Span, right span37761(SQ) 43602(SK) C/C bearing span, left37761(SQ) 43602(SK) C/C bearing span, right80(SQ.) 92(SK) Expansion gap80(SQ.) 92(SK) Expansion gap1070(SQ) 1236(SK) C/L exp. joint to C/L of bearing1070(SQ) 1236(SK) C/L exp. joint to C/L of bearing+42 more
p02_r02 elevation of bridge deck piers and abutments bridge at ch 64 412Elevation
- Launching apron×2flat apron with toeLabelled at left; similar element drawn at right
Span length (C/L exp. joint to C/L pier), left span = 40000(SQ) 46188(SK) — on Span A1-P1 Span length (C/L exp. joint to C/L exp. joint), left spanSpan length (C/L pier to C/L exp. joint), right span = 46000(SK) 46188(SK) — on Span P1-A2 Span length, right span80(SQ.) 92(SK) Expansion gap80(SQ.) 92(SK) Expansion gap37761(SQ) 43602(SK) C/L of brg. to C/L of brg. (left span)37761(SQ) 43602(SK) C/L of brg. to C/L of brg. (right span)1070(SQ) 1236(SK) C/L exp. joint to C/L of bearing1070(SQ) 1236(SK) C/L exp. joint to C/L of bearing+39 more