⚠ No class in the bridge ontology fits this itemAdd a class
Existing road shown on key plan is not permanent bridge works and is not identified as the crossed feature; ontology would need an existing road class.
How the sheets named it
Notes on the sheets that carry it
- p1C/L OF EXP. JOINT
- p1MEDIAN WALL PCC M15
- p1INDEPENDENT RETAINING WALL
- p1RET./ TOE WALL
- p130° SKEW
- p15000 (TYP.)
- p1New Construction
- p1PROPOSED CH.: 64+412
- p1STRUCTURE TYPE: MJBR
- p1PROPOSED SPAN: 2X40m
- p1SKEW: 30°
- p1PROPOSAL: New Construction
Every crop it was read in — the drawing beside what the model took off it
Page 1
p01_r01Plan
- Existing road / carriageway with embankment side slopes (key plan)×1linear corridorShown with hatched slope symbols either side
40000(SQ) 46189(SK) Span length (square) and along skew30° Skew angle1275 Edge offset dimension3500 Transverse spacing (typical, deck level upper plan)16550 Overall transverse width (deck level upper plan)1275 Edge offset dimensions (deck level lower plan)3500 Transverse spacing (deck level lower plan)16550 Overall transverse width (deck level lower plan)+14 more
p01_r01 key planPlan
- Existing road / carriageway with median (key plan)×1linear divided carriagewayShown with chainage markers and ROW lines.
40000(SQ) 46189(SK) Span length (square) / (skew)30° Skew angle1275 Edge/offset dimension3500 Beam/bearing spacing (typical string)16550 Overall width1275 Offset dimension1275 Offset dimension3500 Beam/bearing spacing+18 more