Matched toPier Systembridge.substructure.pier_systemon “Pier”
This class asks for no measurements, so there is no take-off to do against it.
How the sheets named it
Every dimension read for it71
- 40000(SQ) 46188(SK) mmHorizontal dimensionnot attributedp2 · p02_r01
- 46000(SK) 46188(SK) mmHorizontal dimensionnot attributedp2 · p02_r01
- 37761(SQ) 43602(SK) mmHorizontal dimensionnot attributedp2 · p02_r01
- 37761(SQ) 43602(SK) mmHorizontal dimensionnot attributedp2 · p02_r01
- 1170(SQ) 1350(SK) mmDistance at pierp2 · p02_r01
- 1170(SQ) 1350(SK) mmDistance at pierp2 · p02_r01
- 1200 (min.) mmMinimum vertical distance to HFLnot attributedp2 · p02_r01
- 506.000m mLWLnot attributedp2 · p02_r01
- 750 mmPier pile-cap end projectionp2 · p02_r01
- 3600 mmPier pile spacingp2 · p02_r01
- 5100 mmPier pile-cap overall widthp2 · p02_r01
- 64+406.385 km.Chainage LHSp2 · p02_r01
- 64+417.675 km.Chainage RHSp2 · p02_r01
- 519.033 mFRL LHSp2 · p02_r01
- 519.217 mFRL RHSp2 · p02_r01
- 503.816 mGround level LHSp2 · p02_r01
- 503.883 mGround level RHSp2 · p02_r01
- 1170(SQ)horizontal dimension from C OF BRG.not attributedp2 · pier_p1
- 1350(SK)horizontal dimension from C OF BRG.not attributedp2 · pier_p1
- 1170(SQ)horizontal dimension from C OF BRG.not attributedp2 · pier_p1
- 1350(SK)horizontal dimension from C OF BRG.not attributedp2 · pier_p1
- 1500pier head vertical dimensionp2 · pier_p1
- 750pier head subdivision dimensionp2 · pier_p1
- 750pier head subdivision dimensionp2 · pier_p1
- 3640(SQ)pier head width dimensionp2 · pier_p1
- 4203(SK)pier head width dimensionp2 · pier_p1
- 1500column widthp2 · pier_p1
- 1500section-at-pier rectangle horizontal dimensionp2 · pier_p1
- 1000section-at-pier rectangle vertical dimensionp2 · pier_p1
- 25chamfer dimensionp2 · pier_p1
- 25chamfer dimensionp2 · pier_p1
- 25X25chamfer sizep2 · pier_p1
- 40000(SQ) 46188(SK)span dimensionnot attributedp2 · p02_r01 elevation of bridge superstructure
- 46000(SK) 46188(SK)span dimensionnot attributedp2 · p02_r01 elevation of bridge superstructure
- 37761(SQ) 43602(SK)bridge dimensionnot attributedp2 · p02_r01 elevation of bridge superstructure
- 37761(SQ) 43602(SK)bridge dimensionnot attributedp2 · p02_r01 elevation of bridge superstructure
- 1170(SQ) 1350(SK)dimensionp2 · p02_r01 elevation of bridge superstructure
- 1170(SQ) 1350(SK)dimensionp2 · p02_r01 elevation of bridge superstructure
- 1200 mmHFLnot attributedp2 · p02_r01 elevation of bridge superstructure
- 506.000 mLWLnot attributedp2 · p02_r01 elevation of bridge superstructure
- 750pile cap end dimensionp2 · p02_r01 elevation of bridge superstructure
- 3600pile spacingp2 · p02_r01 elevation of bridge superstructure
- 5100pile cap overall dimensionp2 · p02_r01 elevation of bridge superstructure
- 750pile cap end dimensionp2 · p02_r01 elevation of bridge superstructure
- 64+406.385chainagep2 · p02_r01 elevation of bridge superstructure
- 64+417.675chainagep2 · p02_r01 elevation of bridge superstructure
- 519.033 mFRL main carriagewayp2 · p02_r01 elevation of bridge superstructure
- 519.217 mFRL main carriagewayp2 · p02_r01 elevation of bridge superstructure
- 503.816 mground level main carriagewayp2 · p02_r01 elevation of bridge superstructure
- 503.883 mground level main carriagewayp2 · p02_r01 elevation of bridge superstructure
- 1170(SQ)Offset from C OF BRG.p2 · p02_r04 section b b
- 1350(SK)Offset from C OF BRG.p2 · p02_r04 section b b
- 1170(SQ)Offset from C OF BRG.p2 · p02_r04 section b b
- 1350(SK)Offset from C OF BRG.p2 · p02_r04 section b b
- 1500Pier-cap vertical dimensionp2 · p02_r04 section b b
- 750Pier-cap vertical dimensionp2 · p02_r04 section b b
- 750Pier-cap vertical dimensionp2 · p02_r04 section b b
- 3640(SQ)Pier-cap widthp2 · p02_r04 section b b
- 4203(SK)Pier-cap widthp2 · p02_r04 section b b
- 1500Column pier widthp2 · p02_r04 section b b
- 1800Pilecap depthp2 · p02_r04 section b b
- 750Pile spacing/end offsetp2 · p02_r04 section b b
- 3600Pile spacingp2 · p02_r04 section b b
- 750Pile spacing/end offsetp2 · p02_r04 section b b
- 5100Pilecap widthp2 · p02_r04 section b b
- 1200Bored pile diameterp2 · p02_r04 section b b
- 25Chamfer horizontal dimensionp2 · p02_r06 section at pier location
- 25Chamfer vertical dimensionp2 · p02_r06 section at pier location
- 1500Overall widthp2 · p02_r06 section at pier location
- 1000Overall heightp2 · p02_r06 section at pier location
- 1:25Scalenot attributedp2 · p02_r06 section at pier location
Notes on the sheets that carry it
- p2300 THK. APPROACH SLAB
- p2150 THK. PCC LEVELING COURSE
- p2RCC CRASH BARRIER
- p2POT-PTFE BEARING (TYP.)
- p2LAUNCHING APRON
- p2STONE PITCHING
- p2INDEPENDENT RETAINING WALL
- p2600 THK. FILTER MEDIA
- p2RCC COLUMN PIER (TYP.)
- p2DECK CONTINUITY
- p2PRECAST PSC GIRDER (TYP.)
- p2WALL TYPE ABUTMENT
- p21200φ RCC CAST IN SITU PILE (TYP.)
- p21. ALL DIMENSIONS ARE IN MILL... OTHERWISE SPECIFIED.
- p22. DIMENSIONS ARE NOT TO BE ... FOLLOWED.
- p23. THIS DRAWING SHALL BE RE... ALIGNMENT DRAWINGS.
- p24. THE BRIDGE HAS BEEN DES... CLASS 70R + TWO LANE OF 70R OR SV LOADING WHICH...
- p25. GRADE OF CONCRETE FOR VA... FOLLOWS:-
- p2• PSC PRECAST GIRDER -
- p2• R.C.C. CAST IN SITU DEC...
- p2• R.C.C. END CROSS GIRDER -
- p2• R.C.C. INTERMEDIATE CROS...
- p2• BEARING PEDESTAL -
- p2RCC CRASH BARRIER FRL
- p2RCC SEISMIC STOPPER
- p2RCC COLUMN PIER
- p2RCC PILECAP
- p21200 DIA BORED CAST-IN-SITU PILES
- p2CHAMFER 25X25
- p21. ALL DIMENSIONS ARE IN M
- p2OTHERWISE SPECIFIED.
- p23. THIS DRAWING SHALL BE RE
- p2ALIGNMENT DRAWINGS.
- p24. THE BRIDGE HAS BEEN DES
- p2CLASS 70R + TWO LANE O
- p270R OR SV LOADING WHICH
- p25. GRADE OF CONCRETE FOR
- p2FOLLOWS:-
- p2• R.C.C. CAST IN SITU DE
- p2• R.C.C. INTERMEDIATE C
Every crop it was read in — the drawing beside what the model took off it
Page 2
p02_r01Elevation
- RCC column pierP1×1rectangular columnreinforced concreteMarked “(TYP.)”.
80(SQ.) 92(SK) mm Expansion gap80(SQ.) 92(SK) mm Expansion gap40000(SQ) 46188(SK) mm Horizontal dimension46000(SK) 46188(SK) mm Horizontal dimension37761(SQ) 43602(SK) mm Horizontal dimension37761(SQ) 43602(SK) mm Horizontal dimension1070(SQ) 1236(SK) mm Distance from C OF BRG.1070(SQ) 1236(SK) mm Distance from C OF BRG.+33 more
pier_p1Section
- RCC column pierP1×1rectangularreinforced concrete
1170(SQ) horizontal dimension from C OF BRG.1350(SK) horizontal dimension from C OF BRG.1170(SQ) horizontal dimension from C OF BRG.1350(SK) horizontal dimension from C OF BRG.230 vertical dimension at crash barrier/deck230 vertical dimension at crash barrier/deck2650 vertical girder depth dimension2650 vertical girder depth dimension+18 more
p02_r01 elevation of bridge superstructureElevation
- RCC column pierP1×1rectangular columnreinforced concreteMarked RCC COLUMN PIER (TYP.).
40000(SQ) 46188(SK) span dimension46000(SK) 46188(SK) span dimension37761(SQ) 43602(SK) bridge dimension37761(SQ) 43602(SK) bridge dimension80(SQ.) 92(SK) EXP.GAP80(SQ.) 92(SK) EXP.GAP1070(SQ) 1236(SK) dimension1170(SQ) 1350(SK) dimension+43 more
p02_r03 notes of general notesNotes
- PierConcrete grade noted as M45.
M50 PSC PRECAST GIRDER concrete gradeM45 R.C.C. CAST IN SITU DECK SLAB concrete gradeM45 R.C.C. END CROSS GIRDER concrete gradeM45 R.C.C. INTERMEDIATE CROSS GIRDER concrete gradeM50 BEARING PEDESTAL concrete gradeM40 CRASH BARRIER concrete gradeM30 APPROACH SLAB concrete gradeM15 LEVELLING COURSE concrete grade+19 more
p02_r04 section b bSection
- pier capP1×1rectangularreinforced concrete
- column pierP1×1rectangularreinforced concrete
- pilecapP1×1rectangularreinforced concrete
- bored cast-in-situ pileP1×2circularcast-in-situ concretePile shafts are shown below the pilecap.
1170(SQ) Offset from C OF BRG.1350(SK) Offset from C OF BRG.1170(SQ) Offset from C OF BRG.1350(SK) Offset from C OF BRG.230 Crash barrier/deck vertical dimension230 Crash barrier/deck vertical dimension2650 Girder depth vertical dimension2650 Girder depth vertical dimension+14 more
p02_r06 section at pier locationCross Section
- Pier section×1rectangular with chamfered cornersSection shown at pier location.
25 Chamfer horizontal dimension25 Chamfer vertical dimension1500 Overall width1000 Overall height1:25 Scale
Page 3
p03_r02Cross Section
- Pier column×6rectangularThree vertical columns are shown below each pier cap.
16550 overall carriageway width2900 proposed-road centreline spacing13500 carriageway width450 edge width1500 footpath width100 edge dimension50 mm wearing-course thickness2.5% deck slope+17 more
p03_r02 cross section of deck and pile group at pier p1Cross Section
- pier capP1×2stepped, variable-depth rectangular capSeparate caps are shown below the left-side and right-side carriageways.
- pier columnP1×6rectangularThree columns are visible below each pier cap.
- pile capP1×2rectangularDashed pile caps are shown below ground level.
- pileP1×24circularDashed pile outlines are shown in paired groups below each pile cap.
16550 overall width2900 centre separation16550 overall width450 edge width1500 footpath width100 offset13500 carriageway width450 edge width+38 more