Matched toBlinding Concretebridge.foundation_system.blinding_concreteon “Levelling course”
| The class asks for | Value | How | From |
|---|---|---|---|
| LengthLwants m/mm | not establishedThe elevation identifies two PCC levelling courses below the approach slabs, but no longitudinal dimension is stated as belonging to the PCC levelling course. | not found | |
| WidthWwants m/mm | not establishedThe available elevation and notes identify the PCC levelling course but provide no transverse width dimension for it. | not found | |
| ThicknessTwants m/mm | 150 mmPCC levelling course thickness stated as 150 mm.The measurement explicitly states “PCC levelling course thickness” = 150 mm, applicable at A1 and A2. | read | p2 · p02_r01 |
| Instance CountNwants count | 2 countPCC levelling course count stated as 2.The elevation object listing identifies PCC levelling course below the approach slabs with count 2. | read | p2 · p02_r01 |
| Concrete Gradefck | M15 -Concrete grade for LEVELLING COURSE stated as M15.The general concrete-grade notes explicitly specify LEVELLING COURSE as M15. | read | p2 · p02_r03 |
Worked out by openai/gpt-5.6-terra-pro from the readings below, which are the source. A derived value shows its arithmetic — check it against the drawing before it is priced.
How the sheets named it
Every dimension read for it15
- 40000(SQ) 46188(SK) mmHorizontal dimensionnot attributedp2 · p02_r01
- 46000(SK) 46188(SK) mmHorizontal dimensionnot attributedp2 · p02_r01
- 37761(SQ) 43602(SK) mmHorizontal dimensionnot attributedp2 · p02_r01
- 37761(SQ) 43602(SK) mmHorizontal dimensionnot attributedp2 · p02_r01
- 1200 (min.) mmMinimum vertical distance to HFLnot attributedp2 · p02_r01
- 506.000m mLWLnot attributedp2 · p02_r01
- M15Concrete grade, LEVELLING COURSEp2 · p02_r03
- 40000(SQ) 46188(SK)span dimensionnot attributedp2 · p02_r01 elevation of bridge superstructure
- 46000(SK) 46188(SK)span dimensionnot attributedp2 · p02_r01 elevation of bridge superstructure
- 37761(SQ) 43602(SK)bridge dimensionnot attributedp2 · p02_r01 elevation of bridge superstructure
- 37761(SQ) 43602(SK)bridge dimensionnot attributedp2 · p02_r01 elevation of bridge superstructure
- 150 THK.PCC levelling course thicknessp2 · p02_r01 elevation of bridge superstructure
- 1200 mmHFLnot attributedp2 · p02_r01 elevation of bridge superstructure
- 506.000 mLWLnot attributedp2 · p02_r01 elevation of bridge superstructure
- M15LEVELLING COURSE concrete gradep2 · p02_r03 notes of general notes
Notes on the sheets that carry it
- p2300 THK. APPROACH SLAB
- p2150 THK. PCC LEVELING COURSE
- p2RCC CRASH BARRIER
- p2POT-PTFE BEARING (TYP.)
- p2LAUNCHING APRON
- p2STONE PITCHING
- p2INDEPENDENT RETAINING WALL
- p2600 THK. FILTER MEDIA
- p2RCC COLUMN PIER (TYP.)
- p2DECK CONTINUITY
- p2PRECAST PSC GIRDER (TYP.)
- p2WALL TYPE ABUTMENT
- p21200φ RCC CAST IN SITU PILE (TYP.)
- p21. ALL DIMENSIONS ARE IN MILL... OTHERWISE SPECIFIED.
- p22. DIMENSIONS ARE NOT TO BE ... FOLLOWED.
- p23. THIS DRAWING SHALL BE RE... ALIGNMENT DRAWINGS.
- p24. THE BRIDGE HAS BEEN DES... CLASS 70R + TWO LANE OF 70R OR SV LOADING WHICH...
- p25. GRADE OF CONCRETE FOR VA... FOLLOWS:-
- p2• PSC PRECAST GIRDER -
- p2• R.C.C. CAST IN SITU DEC...
- p2• R.C.C. END CROSS GIRDER -
- p2• R.C.C. INTERMEDIATE CROS...
- p2• BEARING PEDESTAL -
- p21. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS ARE IN METERS UNLESS OTHERWISE SPECIFIED.
- p22. DIMENSIONS ARE NOT TO BE SCALED. ONLY WRITTEN DIMENSIONS SHALL BE FOLLOWED.
- p23. THIS DRAWING SHALL BE READ IN CONJUNCTION WITH RESPECTIVE HIGHWAY ALIGNMENT DRAWINGS.
- p24. THE BRIDGE HAS BEEN DESIGNED FOR FOUR LANE OF CLASS A, ONE LANE CLASS 70R + TWO LANE OF CLASS A, ONE LANE OF 70R + ONE LANE OF 70R OR SV LOADING WHICHEVER GOVERNS, IS CONSIDERED AS LIVE LOAD.
- p25. GRADE OF CONCRETE FOR VARIOUS STRUCTURAL COMPONENTS SHALL BE AS FOLLOWS:-
- p2PSC PRECAST GIRDER -----------M50
- p2R.C.C. CAST IN SITU DECK SLAB ----M45
- p2R.C.C. END CROSS GIRDER ----- --M45
- p2R.C.C. INTERMEDIATE CROSS GIRDER --M45
- p2BEARING PEDESTAL --------------M50
- p2CRASH BARRIER ----------------M40
- p2APPROACH SLAB ----------------M30
- p2LEVELLING COURSE -------------M15
- p2DIRT WALL & SLAB -------------M35
- p2ABUTMENT & PIER --------------M45
- p2PILE FOUNDATION --------------M35
- p26. CLEAR COVER TO ANY REINFORCEMENTS SHALL BE AS FOLLOWS:
Every crop it was read in — the drawing beside what the model took off it
Page 2
p02_r01Elevation
- PCC levelling course×2horizontal layerPCCBelow approach slabs.
80(SQ.) 92(SK) mm Expansion gap80(SQ.) 92(SK) mm Expansion gap40000(SQ) 46188(SK) mm Horizontal dimension46000(SK) 46188(SK) mm Horizontal dimension37761(SQ) 43602(SK) mm Horizontal dimension37761(SQ) 43602(SK) mm Horizontal dimension1070(SQ) 1236(SK) mm Distance from C OF BRG.1070(SQ) 1236(SK) mm Distance from C OF BRG.+33 more
p02_r03Notes
- levelling courseconcreteConcrete grade specified as M15.
M50 Concrete grade, PSC PRECAST GIRDERM45 Concrete grade, R.C.C. CAST IN SITU DECK SLABM45 Concrete grade, R.C.C. END CROSS GIRDERM45 Concrete grade, R.C.C. INTERMEDIATE CROSS GIRDERM50 Concrete grade, BEARING PEDESTALM40 Concrete grade, CRASH BARRIERM30 Concrete grade, APPROACH SLABM15 Concrete grade, LEVELLING COURSE+17 more
p02_r01 elevation of bridge superstructureElevation
- PCC levelling course×2horizontal layerplain cement concreteMarked 150 THK. PCC LEVELLING COURSE.
40000(SQ) 46188(SK) span dimension46000(SK) 46188(SK) span dimension37761(SQ) 43602(SK) bridge dimension37761(SQ) 43602(SK) bridge dimension80(SQ.) 92(SK) EXP.GAP80(SQ.) 92(SK) EXP.GAP1070(SQ) 1236(SK) dimension1170(SQ) 1350(SK) dimension+43 more
p02_r03 notes of general notesNotes
- Levelling courseConcrete grade noted as M15.
M50 PSC PRECAST GIRDER concrete gradeM45 R.C.C. CAST IN SITU DECK SLAB concrete gradeM45 R.C.C. END CROSS GIRDER concrete gradeM45 R.C.C. INTERMEDIATE CROSS GIRDER concrete gradeM50 BEARING PEDESTAL concrete gradeM40 CRASH BARRIER concrete gradeM30 APPROACH SLAB concrete gradeM15 LEVELLING COURSE concrete grade+19 more