Matched toDiaphragmbridge.superstructure.secondary_member_system.diaphragmon “Diaphragm”
| The class asks for | Value | How | From |
|---|---|---|---|
| LengthLwants m/mm | not establishedNo dimension in the readings is identified as the longitudinal length of the Deck Continuity. The 1170(SQ)/1350(SK) dimensions apply to offsets from C OF BRG. at P1, not explicitly to the Deck Continuity. | not found | |
| Cross-sectional AreaAwants m2/mm2 | not establishedThe section identifies DECK CONTINUITY but provides no unambiguous dimensions for its thickness and width. The 230 dimension is labelled for the RCC crash barrier/deck vertical dimension and applies to the RCC crash barrier, so it cannot be used as the Deck Continuity cross-sectional dimension. | not found | |
| Instance CountNwants count | 1 countThe elevation readings each list Deck continuity/deck continuity with count 1 at pier P1; Section B-B also identifies one deck slab / deck continuity. | read | p2 · p02_r01p2 · p02_r01 elevation of bridge superstructurep2 · p02_r04 section b b |
| Material TypeMAT | R.C.C. cast in situ deck -The elevation notes list “R.C.C. CAST IN SITU DEC...” under the concrete-grade notes. This is read as the cast-in-situ RCC deck material, applicable to the item because Deck Continuity is identified as a deck connection; the note is cropped and does not explicitly state “Deck Continuity.” | readcheck | p2 · p02_r01p2 · p02_r01 elevation of bridge superstructure |
| MassMwants kg/t | not establishedNo mass, volume, density, or complete geometry for the Deck Continuity is provided from which mass could be derived. | not found |
Worked out by openai/gpt-5.6-terra-pro from the readings below, which are the source. A derived value shows its arithmetic — check it against the drawing before it is priced.
How the sheets named it
Every dimension read for it12
- 40000(SQ) 46188(SK) mmHorizontal dimensionnot attributedp2 · p02_r01
- 46000(SK) 46188(SK) mmHorizontal dimensionnot attributedp2 · p02_r01
- 37761(SQ) 43602(SK) mmHorizontal dimensionnot attributedp2 · p02_r01
- 37761(SQ) 43602(SK) mmHorizontal dimensionnot attributedp2 · p02_r01
- 1200 (min.) mmMinimum vertical distance to HFLnot attributedp2 · p02_r01
- 506.000m mLWLnot attributedp2 · p02_r01
- 40000(SQ) 46188(SK)span dimensionnot attributedp2 · p02_r01 elevation of bridge superstructure
- 46000(SK) 46188(SK)span dimensionnot attributedp2 · p02_r01 elevation of bridge superstructure
- 37761(SQ) 43602(SK)bridge dimensionnot attributedp2 · p02_r01 elevation of bridge superstructure
- 37761(SQ) 43602(SK)bridge dimensionnot attributedp2 · p02_r01 elevation of bridge superstructure
- 1200 mmHFLnot attributedp2 · p02_r01 elevation of bridge superstructure
- 506.000 mLWLnot attributedp2 · p02_r01 elevation of bridge superstructure
Notes on the sheets that carry it
- p2300 THK. APPROACH SLAB
- p2150 THK. PCC LEVELING COURSE
- p2RCC CRASH BARRIER
- p2POT-PTFE BEARING (TYP.)
- p2LAUNCHING APRON
- p2STONE PITCHING
- p2INDEPENDENT RETAINING WALL
- p2600 THK. FILTER MEDIA
- p2RCC COLUMN PIER (TYP.)
- p2DECK CONTINUITY
- p2PRECAST PSC GIRDER (TYP.)
- p2WALL TYPE ABUTMENT
- p21200φ RCC CAST IN SITU PILE (TYP.)
- p21. ALL DIMENSIONS ARE IN MILL... OTHERWISE SPECIFIED.
- p22. DIMENSIONS ARE NOT TO BE ... FOLLOWED.
- p23. THIS DRAWING SHALL BE RE... ALIGNMENT DRAWINGS.
- p24. THE BRIDGE HAS BEEN DES... CLASS 70R + TWO LANE OF 70R OR SV LOADING WHICH...
- p25. GRADE OF CONCRETE FOR VA... FOLLOWS:-
- p2• PSC PRECAST GIRDER -
- p2• R.C.C. CAST IN SITU DEC...
- p2• R.C.C. END CROSS GIRDER -
- p2• R.C.C. INTERMEDIATE CROS...
- p2• BEARING PEDESTAL -
- p21. ALL DIMENSIONS ARE IN M
- p2OTHERWISE SPECIFIED.
- p23. THIS DRAWING SHALL BE RE
- p2ALIGNMENT DRAWINGS.
- p24. THE BRIDGE HAS BEEN DES
- p2CLASS 70R + TWO LANE O
- p270R OR SV LOADING WHICH
- p25. GRADE OF CONCRETE FOR
- p2FOLLOWS:-
- p2• R.C.C. CAST IN SITU DE
- p2• R.C.C. INTERMEDIATE C
- p2• REINFORCEMENT
- p2FRL
- p2RCC SEISMIC STOPPER
- p2RCC COLUMN PIER
- p2RCC PILECAP
- p21200 DIA BORED CAST-IN-SITU PILES
Every crop it was read in — the drawing beside what the model took off it
Page 2
p02_r01Elevation
- Deck continuity×1rectangular joint/diaphragmShown over pier P1.
80(SQ.) 92(SK) mm Expansion gap80(SQ.) 92(SK) mm Expansion gap40000(SQ) 46188(SK) mm Horizontal dimension46000(SK) 46188(SK) mm Horizontal dimension37761(SQ) 43602(SK) mm Horizontal dimension37761(SQ) 43602(SK) mm Horizontal dimension1070(SQ) 1236(SK) mm Distance from C OF BRG.1070(SQ) 1236(SK) mm Distance from C OF BRG.+33 more
p02_r01 elevation of bridge superstructureElevation
- deck continuity×1linear deck connection
40000(SQ) 46188(SK) span dimension46000(SK) 46188(SK) span dimension37761(SQ) 43602(SK) bridge dimension37761(SQ) 43602(SK) bridge dimension80(SQ.) 92(SK) EXP.GAP80(SQ.) 92(SK) EXP.GAP1070(SQ) 1236(SK) dimension1170(SQ) 1350(SK) dimension+43 more
p02_r04 section b bSection
- deck slab / deck continuity×1rectangularCallout identifies DECK CONTINUITY at the pier.
1170(SQ) Offset from C OF BRG.1350(SK) Offset from C OF BRG.1170(SQ) Offset from C OF BRG.1350(SK) Offset from C OF BRG.230 Crash barrier/deck vertical dimension230 Crash barrier/deck vertical dimension2650 Girder depth vertical dimension2650 Girder depth vertical dimension+14 more