Matched toBored Cast-in-situ Pilebridge.foundation_system.deep_foundation.pile.bored_cast_in_situon “Bored Cast-In-Situ Pile”
| The class asks for | Value | How | From |
|---|---|---|---|
| DiameterDwants m/mm | 1200 mmPile diameter is stated as "1200 DIA BORED CAST-IN-SITU PILES."The stated diameter applies directly to the bored cast-in-situ pile item. | read | p2 · p02_r05p2 · pier_p1 |
| LengthLwants m/mm | 24.950 mA1 pile length: PCBL 506.855 m − PILE TIP LVL. 481.905 m = 24.950 m. A2 pile length: PCBL 509.591 m − PILE TIP LVL. 484.641 m = 24.950 m. P1 pile length: PCBL 501.516 m − PILE TIP LVL. 476.566 m = 24.950 m.Pile length is taken from the bottom of pile cap level (PCBL) to pile tip level. The same derived length results at A1, A2, and P1. | derived | p3 · p03_r01p3 · p03_r02 |
| Instance CountNwants count | 104 countAbutment piles: 4 abutment pile groups (A1 L/S, A1 R/S, A2 L/S, A2 R/S) × 4 piles longitudinally per group × 5 piles transversely per group = 80 piles. Pier piles: 24 piles at P1 (two pile caps shown, with 24 pile outlines in total) = 24 piles. Total = 80 + 24 = 104 piles.Section A-A shows four bored pile positions below an abutment pile cap, while the abutment transverse section shows five piles below each pile cap; the listed marks establish four abutment pile groups. The P1 transverse section directly identifies 24 piles. | derived | p2 · p02_r05 section a ap3 · p03_r01 cross section of deck and pile group at abutments a1 a2p3 · p03_r02 cross section of deck and pile group at pier p1 |
| Concrete Gradefck | M35Concrete grade for "PILE FOUNDATION" is stated as M35.The bored cast-in-situ piles are the pile foundation; therefore the pile-foundation concrete grade applies. | read | p2 · p02_r03 |
Worked out by openai/gpt-5.6-terra-pro from the readings below, which are the source. A derived value shows its arithmetic — check it against the drawing before it is priced.
How the sheets named it
Every dimension read for it87
- 80000Right-of-way widthnot attributedp1 · p01_r02
- 40000Right-of-way widthnot attributedp1 · p01_r02
- 2900Median widthnot attributedp1 · p01_r02
- 1275Median-side offsetnot attributedp1 · p01_r02
- 0.6mPile diameterp1 · p01_r01 key plan scale 1 2000
- 80000right-of-waynot attributedp1 · p01_r02 half plan showing deck level half plan showing foundation level
- 40000right-of-waynot attributedp1 · p01_r02 half plan showing deck level half plan showing foundation level
- 40000right-of-waynot attributedp1 · p01_r02 half plan showing deck level half plan showing foundation level
- 37761(SQ) 43603(SK)overall intermediate lengthnot attributedp1 · p01_r02 half plan showing deck level half plan showing foundation level
- 3750foundation pile spacingp1 · p01_r02 half plan showing deck level half plan showing foundation level
- 750pile spacing/end offsetp2 · p02_r05
- 3600pile spacingp2 · p02_r05
- 3600pile spacingp2 · p02_r05
- 3600pile spacingp2 · p02_r05
- 750pile spacing/end offsetp2 · p02_r05
- 1200 DIApile diameterp2 · p02_r05
- 40000(SQ) 46188(SK) mmHorizontal dimensionnot attributedp2 · p02_r01
- 46000(SK) 46188(SK) mmHorizontal dimensionnot attributedp2 · p02_r01
- 37761(SQ) 43602(SK) mmHorizontal dimensionnot attributedp2 · p02_r01
- 37761(SQ) 43602(SK) mmHorizontal dimensionnot attributedp2 · p02_r01
- 1170(SQ) 1350(SK) mmDistance at pierp2 · p02_r01
- 1170(SQ) 1350(SK) mmDistance at pierp2 · p02_r01
- 1200 (min.) mmMinimum vertical distance to HFLnot attributedp2 · p02_r01
- 506.000m mLWLnot attributedp2 · p02_r01
- 750 mmPier pile-cap end projectionp2 · p02_r01
- 3600 mmPier pile spacingp2 · p02_r01
- 5100 mmPier pile-cap overall widthp2 · p02_r01
- 1200φ mmCast in situ pile diameterp2 · p02_r01
- 64+406.385 km.Chainage LHSp2 · p02_r01
- 64+417.675 km.Chainage RHSp2 · p02_r01
- 519.033 mFRL LHSp2 · p02_r01
- 519.217 mFRL RHSp2 · p02_r01
- 503.816 mGround level LHSp2 · p02_r01
- 503.883 mGround level RHSp2 · p02_r01
- M35Concrete grade, PILE FOUNDATIONp2 · p02_r03
- 300 TMaximum vertical working pile loadp2 · p02_r03
- 50 TLateral working pile loadp2 · p02_r03
- 1170(SQ)horizontal dimension from C OF BRG.not attributedp2 · pier_p1
- 1350(SK)horizontal dimension from C OF BRG.not attributedp2 · pier_p1
- 1170(SQ)horizontal dimension from C OF BRG.not attributedp2 · pier_p1
- 1350(SK)horizontal dimension from C OF BRG.not attributedp2 · pier_p1
- 3600pile spacing dimensionp2 · pier_p1
- 1200 DIAbored pile diameterp2 · pier_p1
- 40000(SQ) 46188(SK)span dimensionnot attributedp2 · p02_r01 elevation of bridge superstructure
- 46000(SK) 46188(SK)span dimensionnot attributedp2 · p02_r01 elevation of bridge superstructure
- 37761(SQ) 43602(SK)bridge dimensionnot attributedp2 · p02_r01 elevation of bridge superstructure
- 37761(SQ) 43602(SK)bridge dimensionnot attributedp2 · p02_r01 elevation of bridge superstructure
- 1170(SQ) 1350(SK)dimensionp2 · p02_r01 elevation of bridge superstructure
- 1170(SQ) 1350(SK)dimensionp2 · p02_r01 elevation of bridge superstructure
- 1200 mmHFLnot attributedp2 · p02_r01 elevation of bridge superstructure
- 506.000 mLWLnot attributedp2 · p02_r01 elevation of bridge superstructure
- 1200øpile diameterp2 · p02_r01 elevation of bridge superstructure
- 750pile cap end dimensionp2 · p02_r01 elevation of bridge superstructure
- 3600pile spacingp2 · p02_r01 elevation of bridge superstructure
- 5100pile cap overall dimensionp2 · p02_r01 elevation of bridge superstructure
- 750pile cap end dimensionp2 · p02_r01 elevation of bridge superstructure
- 64+406.385chainagep2 · p02_r01 elevation of bridge superstructure
- 64+417.675chainagep2 · p02_r01 elevation of bridge superstructure
- 519.033 mFRL main carriagewayp2 · p02_r01 elevation of bridge superstructure
- 519.217 mFRL main carriagewayp2 · p02_r01 elevation of bridge superstructure
- 503.816 mground level main carriagewayp2 · p02_r01 elevation of bridge superstructure
- 503.883 mground level main carriagewayp2 · p02_r01 elevation of bridge superstructure
- M35PILE FOUNDATION concrete gradep2 · p02_r03 notes of general notes
- 300 TMaximum vertical pile loadp2 · p02_r03 notes of general notes
- 50 TLateral pile loadp2 · p02_r03 notes of general notes
- 1170(SQ)Offset from C OF BRG.p2 · p02_r04 section b b
- 1350(SK)Offset from C OF BRG.p2 · p02_r04 section b b
- 1170(SQ)Offset from C OF BRG.p2 · p02_r04 section b b
- 1350(SK)Offset from C OF BRG.p2 · p02_r04 section b b
- 1500Pier-cap vertical dimensionp2 · p02_r04 section b b
- 750Pier-cap vertical dimensionp2 · p02_r04 section b b
- 750Pier-cap vertical dimensionp2 · p02_r04 section b b
- 3640(SQ)Pier-cap widthp2 · p02_r04 section b b
- 4203(SK)Pier-cap widthp2 · p02_r04 section b b
- 1500Column pier widthp2 · p02_r04 section b b
- 1800Pilecap depthp2 · p02_r04 section b b
- 750Pile spacing/end offsetp2 · p02_r04 section b b
- 3600Pile spacingp2 · p02_r04 section b b
- 750Pile spacing/end offsetp2 · p02_r04 section b b
- 5100Pilecap widthp2 · p02_r04 section b b
- 1200Bored pile diameterp2 · p02_r04 section b b
- 750end spacingp2 · p02_r05 section a a
- 3600pile spacingp2 · p02_r05 section a a
- 3600pile spacingp2 · p02_r05 section a a
- 3600pile spacingp2 · p02_r05 section a a
- 750end spacingp2 · p02_r05 section a a
- 1200 DIAbored cast-in-situ pile diameterp2 · p02_r05 section a a
Notes on the sheets that carry it
- p2POT-PTFE BEARING (TYP.)
- p2RCC SEISMIC STOPPER
- p2STONE PITCHING
- p2INDEPENDENT RETAINING WALL
- p2600 THK. FILTER MEDIA
- p21200 DIA BORED CAST-IN-SITU PILES
- p2300 THK. APPROACH SLAB
- p2150 THK. PCC LEVELING COURSE
- p2RCC CRASH BARRIER
- p2LAUNCHING APRON
- p2RCC COLUMN PIER (TYP.)
- p2DECK CONTINUITY
- p2PRECAST PSC GIRDER (TYP.)
- p2WALL TYPE ABUTMENT
- p21200φ RCC CAST IN SITU PILE (TYP.)
- p21. ALL DIMENSIONS ARE IN MILL... OTHERWISE SPECIFIED.
- p22. DIMENSIONS ARE NOT TO BE ... FOLLOWED.
- p23. THIS DRAWING SHALL BE RE... ALIGNMENT DRAWINGS.
- p24. THE BRIDGE HAS BEEN DES... CLASS 70R + TWO LANE OF 70R OR SV LOADING WHICH...
- p25. GRADE OF CONCRETE FOR VA... FOLLOWS:-
- p2• PSC PRECAST GIRDER -
- p2• R.C.C. CAST IN SITU DEC...
- p2• R.C.C. END CROSS GIRDER -
- p2• R.C.C. INTERMEDIATE CROS...
- p2• BEARING PEDESTAL -
- p21. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS ARE IN METERS UNLESS OTHERWISE SPECIFIED.
- p22. DIMENSIONS ARE NOT TO BE SCALED. ONLY WRITTEN DIMENSIONS SHALL BE FOLLOWED.
- p23. THIS DRAWING SHALL BE READ IN CONJUNCTION WITH RESPECTIVE HIGHWAY ALIGNMENT DRAWINGS.
- p24. THE BRIDGE HAS BEEN DESIGNED FOR FOUR LANE OF CLASS A, ONE LANE CLASS 70R + TWO LANE OF CLASS A, ONE LANE OF 70R + ONE LANE OF 70R OR SV LOADING WHICHEVER GOVERNS, IS CONSIDERED AS LIVE LOAD.
- p25. GRADE OF CONCRETE FOR VARIOUS STRUCTURAL COMPONENTS SHALL BE AS FOLLOWS:-
- p2PSC PRECAST GIRDER -----------M50
- p2R.C.C. CAST IN SITU DECK SLAB ----M45
- p2R.C.C. END CROSS GIRDER ----- --M45
- p2R.C.C. INTERMEDIATE CROSS GIRDER --M45
- p2BEARING PEDESTAL --------------M50
- p2CRASH BARRIER ----------------M40
- p2APPROACH SLAB ----------------M30
- p2LEVELLING COURSE -------------M15
- p2DIRT WALL & SLAB -------------M35
- p2ABUTMENT & PIER --------------M45
Every crop it was read in — the drawing beside what the model took off it
Page 1
p01_r02Plan
- Pile×208circularCircular pile symbols are shown in the foundation-level half plan; the right side of this view is cropped.
80000 Right-of-way width40000 Right-of-way width16550 Bridge width13500 Carriageway width1500 Footpath100 Footpath offset450 Edge dimension2900 Median width+21 more
p01_r01 key plan scale 1 2000Plan
- PilecircularPile callout is shown at pier station 64+500; pile layout is not visible in this crop.
64+412 Proposed chainage2x40m Proposed span30° Skew64+400 Station64+500 Station0.6m Pile diameter1:2000 Scale
p01_r02 half plan showing deck level half plan showing foundation levelPlan
- foundation piles×32circularCircular pile symbols are visible in the partial foundation-level half plan at right; arranged as two visible 4 by 4 groups.
80000 right-of-way40000 right-of-way40000 right-of-way16550 bridge width13500 carriageway width500 footpath width450 edge dimensions100 edge dimensions+26 more
Page 2
p02_r05Section
- Bored cast-in-situ pile×4circularPile positions are shown below the pile cap.
1070 (SQ.) offset to C OF BRG.1236 (SK.) offset to C OF BRG.80(SQ.) EXP.GAP92(SK) EXP.GAP230 deck/slab vertical dimension2650 vertical dimension1500 horizontal dimension2850 horizontal dimension+12 more
p02_r01Elevation
- RCC cast in situ pile×8circular pilereinforced concreteMarked “(TYP.)”; three visible below each abutment cap and two below pier cap.
80(SQ.) 92(SK) mm Expansion gap80(SQ.) 92(SK) mm Expansion gap40000(SQ) 46188(SK) mm Horizontal dimension46000(SK) 46188(SK) mm Horizontal dimension37761(SQ) 43602(SK) mm Horizontal dimension37761(SQ) 43602(SK) mm Horizontal dimension1070(SQ) 1236(SK) mm Distance from C OF BRG.1070(SQ) 1236(SK) mm Distance from C OF BRG.+33 more
p02_r03Notes
- pile foundationconcreteConcrete grade specified as M35.
- working pileTentative working load is subject to change as per detailed design.
M50 Concrete grade, PSC PRECAST GIRDERM45 Concrete grade, R.C.C. CAST IN SITU DECK SLABM45 Concrete grade, R.C.C. END CROSS GIRDERM45 Concrete grade, R.C.C. INTERMEDIATE CROSS GIRDERM50 Concrete grade, BEARING PEDESTALM40 Concrete grade, CRASH BARRIERM30 Concrete grade, APPROACH SLABM15 Concrete grade, LEVELLING COURSE+17 more
pier_p1Section
- bored cast-in-situ pile×2circularShown below pilecap; callout states 1200 DIA.
1170(SQ) horizontal dimension from C OF BRG.1350(SK) horizontal dimension from C OF BRG.1170(SQ) horizontal dimension from C OF BRG.1350(SK) horizontal dimension from C OF BRG.230 vertical dimension at crash barrier/deck230 vertical dimension at crash barrier/deck2650 vertical girder depth dimension2650 vertical girder depth dimension+18 more
p02_r01 elevation of bridge superstructureElevation
- RCC cast in situ pile×10circularreinforced concreteMarked 1200ø RCC CAST IN SITU PILE (TYP.).
40000(SQ) 46188(SK) span dimension46000(SK) 46188(SK) span dimension37761(SQ) 43602(SK) bridge dimension37761(SQ) 43602(SK) bridge dimension80(SQ.) 92(SK) EXP.GAP80(SQ.) 92(SK) EXP.GAP1070(SQ) 1236(SK) dimension1170(SQ) 1350(SK) dimension+43 more
p02_r03 notes of general notesNotes
- Pile foundationConcrete grade noted as M35; tentative working pile loads are tabulated.
M50 PSC PRECAST GIRDER concrete gradeM45 R.C.C. CAST IN SITU DECK SLAB concrete gradeM45 R.C.C. END CROSS GIRDER concrete gradeM45 R.C.C. INTERMEDIATE CROSS GIRDER concrete gradeM50 BEARING PEDESTAL concrete gradeM40 CRASH BARRIER concrete gradeM30 APPROACH SLAB concrete gradeM15 LEVELLING COURSE concrete grade+19 more
p02_r04 section b bSection
- pier capP1×1rectangularreinforced concrete
- column pierP1×1rectangularreinforced concrete
- pilecapP1×1rectangularreinforced concrete
- bored cast-in-situ pileP1×2circularcast-in-situ concretePile shafts are shown below the pilecap.
1170(SQ) Offset from C OF BRG.1350(SK) Offset from C OF BRG.1170(SQ) Offset from C OF BRG.1350(SK) Offset from C OF BRG.230 Crash barrier/deck vertical dimension230 Crash barrier/deck vertical dimension2650 Girder depth vertical dimension2650 Girder depth vertical dimension+14 more
p02_r05 section a aSection
- bored cast-in-situ piles×4circularPile locations are shown beneath the pile cap.
1070 dimension (SQ.)1236 dimension (SK.)80 EXP.GAP (SQ.)92 EXP.GAP (SK)3500 dimension (SQ)230 vertical dimension2650 vertical dimension1500 horizontal dimension+11 more
Page 3
p03_r01Section
- pilecircular pile outlines in sectionMultiple piles are shown below each pile cap; the individual pile quantity is not unambiguously countable from this crop.
80000 ROW40000 dimension40000 dimension16550 carriageway overall width16550 carriageway overall width2900 median width13500 carriageway width13500 carriageway width+26 more
p03_r02Cross Section
- PileP1dashed vertical pile symbolPile symbols are shown below both pile caps; individual pile count is unclear in this crop.
16550 overall carriageway width2900 proposed-road centreline spacing13500 carriageway width450 edge width1500 footpath width100 edge dimension50 mm wearing-course thickness2.5% deck slope+17 more
p03_r01 cross section of deck and pile group at abutments a1 a2Cross Section
- pile capA1 L/S, A2 L/S, A1 R/S, A2 R/S×2rectangularDashed pile caps are shown beneath the abutment walls.
- pileA1 L/S, A2 L/S, A1 R/S, A2 R/S×10vertical with enlarged base detailFive piles are visible beneath each pile cap.
80000 ROW40000 ROW half width40000 ROW half width2900 median width16550 deck / carriageway overall width13500 carriageway width16550 deck / carriageway overall width13500 carriageway width+66 more
p03_r02 cross section of deck and pile group at pier p1Cross Section
- pier capP1×2stepped, variable-depth rectangular capSeparate caps are shown below the left-side and right-side carriageways.
- pier columnP1×6rectangularThree columns are visible below each pier cap.
- pile capP1×2rectangularDashed pile caps are shown below ground level.
- pileP1×24circularDashed pile outlines are shown in paired groups below each pile cap.
16550 overall width2900 centre separation16550 overall width450 edge width1500 footpath width100 offset13500 carriageway width450 edge width+38 more