Pier Cap
donepier_cap_p02_r12Substructure
Section1 object · 5 measurements · 12 notes · 8 labels
This crop shows a partial section titled “SECTION AT PIER LOCATION,” with a dimensioned lower portion of an unidentified structural member. It also includes cropped general notes numbered 8 through 18, a partial tentative working pile load table, and part of the drawing title block.
Objects · 1
| Object | No. | Shape | Note |
|---|---|---|---|
| unidentified sectioned structural member | 1 | rectangular with chamfered lower corners | Only the lower portion of the member is visible. |
Measurements · 5
| Measurement | Value | Applies to |
|---|---|---|
| horizontal dimension | 1500 | unidentified sectioned structural member |
| vertical dimension | 100 | unidentified sectioned structural member |
| scale | 1:25 | SECTION AT PIER LOCATION |
| MAX. VERTICAL LOAD | 300 | tentative working pile [partial] |
| LATERAL LOAD | 50 | tentative working pile [partial] |
Labels
SECTION AT PIER LOCATION(SCALE 1:25)MAX. VERTICAL LOADLATERAL LOADDRAWING TITLE:GENERAL ARRANGEMENT DRAWING FO [partial]BRIDGE AT CH. 64+412AUTHORITY OF INDIA [partial]
Notes
- [partial] BARS OF GRADE-Fe 55 [partial]
- 8. STRIP SEAL TYE OF EX [partial] SPECIFICATION.
- 9. BITUMINOUS CONCRETE [partial]
- 10. FRL, CAMBER / SUPER [partial] LATEST PLAN & PROFIL [partial]
- 11. DRAINAGE SPOUT SHALL [partial] SPECIFICATION.
- 12. BACK FILLING MATERIAL [partial] APPENDIX 6 OF IRC 78 [partial] THE SUPERSTRUCTURE.
- 13. THE STRUCTURE IS LOC [partial] ’SEVERE’ EXPOSURE CO [partial]
- 14. DIMENSION OF STRUCTURES [partial]
- 15. THE SELECTED EARTH [partial] SHALL HAVE THE FOLLO [partial]
- 16. THE PIERCAP TOP LEVE [partial] & PEDESTAL. IN CASE [partial] THE HEIGHT OF THE B [partial]
- 17. FOR DIMENSION & REI [partial] CRASH BARRIER & DRA [partial]
- 18. TENTATIVE WORKING PIL [partial]
openai/gpt-5.6-terra-pro · 20475 tokens · 29.4s