Matched toLevelling Coursebuilding.substructure.blindingon “P.C.C. layer”
This class asks for no measurements, so there is no take-off to do against it.
How the sheets named it
Every dimension read for it34
- 600brick wall/foundation vertical dimensionnot attributedp1 · p01_r10
- 450wall/pedestal widthnot attributedp1 · p01_r10
- 250pedestal widthnot attributedp1 · p01_r10
- 100 THK.P.C.C. thicknessnot attributedp1 · p01_r10
- 75 THK.B.F.S thicknessnot attributedp1 · p01_r10
- (1:4:8)P.C.C. mixp1 · p01_r10
- 1500section vertical dimensionnot attributedp1 · p01_r10
- 1000section vertical dimensionnot attributedp1 · p01_r10
- 800section vertical dimensionnot attributedp1 · p01_r10
- 600P.L. to G.L. vertical dimensionnot attributedp1 · p01_r09
- 1600vertical dimensionnot attributedp1 · p01_r09
- 250wall/pile width dimensionnot attributedp1 · p01_r09
- 450vertical dimension at wall foundationnot attributedp1 · p01_r09
- 100 THK.P.C.C. thicknessp1 · p01_r09
- EL (±) 0.000 ME.G.L. elevationnot attributedp1 · p01_r09
- 100 THK.Section XX P.C.C. thicknessp1 · p01_r09
- 500Section XX vertical dimensionnot attributedp1 · p01_r09
- 100 THK.P.C.C. thicknessp1 · p01_r09 foundation of lift
- 600P.L. to G.L. vertical dimensionnot attributedp1 · p01_r10 foundation section of lift shaft with pile cap
- 1600brick wall/foundation vertical dimensionnot attributedp1 · p01_r10 foundation section of lift shaft with pile cap
- 450vertical dimension at pile top areanot attributedp1 · p01_r10 foundation section of lift shaft with pile cap
- 250horizontal dimensionnot attributedp1 · p01_r10 foundation section of lift shaft with pile cap
- 1000foundation vertical dimensionnot attributedp1 · p01_r10 foundation section of lift shaft with pile cap
- 100 THK.P.C.C thicknessp1 · p01_r10 foundation section of lift shaft with pile cap
- 1500lower section vertical dimensionnot attributedp1 · p01_r10 foundation section of lift shaft with pile cap
- 800partial right-side vertical dimensionnot attributedp1 · p01_r10 foundation section of lift shaft with pile cap
- 100P.C.C. thicknessp1 · p01_r19 foundation of lift
- 100Vertical dimensionnot attributedp1 · p01_r19
- 1500Vertical dimensionnot attributedp1 · p01_r19
- 75Vertical dimensionnot attributedp1 · p01_r19
- 100Vertical dimensionnot attributedp1 · p01_r19
- 100Vertical dimensionnot attributedp1 · p01_r19
- 75Vertical dimensionnot attributedp1 · p01_r19
- 300Typical dimensionnot attributedp1 · p01_r19
Notes on the sheets that carry it
- p1CHAIR PROVIDED
- p1BINDING STEEL AROUND PILE BAR
- p1SHEAR REINF.
- p1TOP OF TIE BEAM AT (±)0.000M E.G.L.
- p1100 THK. P.C.C (1:4:8)
- p175 THK. B.F.S
- p1NOMINAL STEEL Y12@150 C/C BOTHWAY AT TOP & BOT.
- p1Y16@1500 C/C STIFFENER
- p1(NOT TO SCALE)
- p1Y12@150 C/C SIDE REINF.
- p1TOP OF PILE CAP EL (-) 0.600 M
- p1100 THK. P.C.C
- p16L - Y10 @ 130 C/C SHEAR REINF.
- p15-Y12
- p1Y12 @150C/C
- p1TIE BEAM
- p1Y12@150 C/C
- p15-Y16 AT BOT.
Every crop it was read in — the drawing beside what the model took off it
Page 1
p01_r10Section
- plain cement concrete blindingrectangular layerP.C.C. (1:4:8)Shown below foundation/pile-cap concrete.
400 FB4 section depth250 FB4 section width2-Y16(ALTh.) FB4 longitudinal reinforcementY8@150 C/C FB4 link reinforcement450 FB5 section depth300 FB5 section width4-Y16(ALTh.) FB5 longitudinal reinforcementY8@150 C/C FB5 link reinforcement+30 more
p01_r09Section
- plain cement concrete levelling courserectangular layerP.C.C. (1:4:8)Shown below pile-cap and foundation work.
250 FB4 section width400 FB4 section depth2-Y16(ALTH.) FB4 longitudinal reinforcementY8@150 C/C FB4 stirrup reinforcement300 FB5 section width450 FB5 section depth4-Y16(ALTH.) FB5 longitudinal reinforcementY8@150 C/C FB5 stirrup reinforcement+39 more
p01_r09 foundation of liftSection
- plain cement concrete layerP.C.C.rectangular layerP.C.C. (1:4:8)Shown below/adjacent to foundation components.
400 FB4 section size250 FB4 section size2-Y16(ALTh.) FB4 reinforcementY8@150 C/C FB4 links450 FB5 section size300 FB5 section size4-Y16(ALTh.) FB5 reinforcementY8@150 C/C FB5 links+41 more
p01_r10 foundation section of lift shaft with pile capElevation
- plain cement concrete layerP.C.Chorizontal layerplain cement concrete (1:4:8)Shown below the foundation and pile-cap work.
400 FB4 vertical dimension250 FB4 horizontal dimension2-Y16 FB4 longitudinal reinforcementY8@150 C/C FB4 tie reinforcement450 FB5 vertical dimension300 FB5 horizontal dimension4-Y16 FB5 longitudinal reinforcementY8@150 C/C FB5 tie reinforcement+27 more
p01_r19 foundation of liftSection
- P.C.C. layer×2rectangular layerP.C.C.One 100 THK. P.C.C. callout occurs near the tie beam and one occurs below the pile cap.
(-) 0.600 M Top of pile cap elevation100 Dimension1500 Dimension75 Dimension1000 Dimension500 Dimension300 Typical spacing100 Dimension+11 more
p01_r19Section
- P.C.C. layer×3rectangular layerP.C.C.P.C.C. layers are called out at the upper and lower portions of the section.
(-) 0.600 M Top of pile cap elevation100 P.C.C. thickness100 P.C.C. thickness75 B.F.S. thickness100 P.C.C. thickness75 B.F.S. thickness100 Vertical dimension1500 Vertical dimension+14 more