Drawing to BOQpipeline control sheet
← Mindmapwhat the drawings said

Wall Leveling Pad

1 page · 2 crops · substructure

⚠ No class in the bridge ontology fits this itemAdd a class

The ontology would need a wall leveling pad component class.

How the sheets named it

wall leveling pads

Notes on the sheets that carry it

  • p2FILL SETTLEMENT - PROTECT PILES DRIVEN AT BENTS 1 AND 4 FROM NEGATIVE SKIN FRICTION WHEN USED IN CONJUNCTION WITH MECHANICALLY STABILIZED EARTH WALLS, SEE SECTION 551 OF THE GEORGIA DOT SPECIFICATIONS. DRIVE PILES AT END BENTS BEFORE WALL LEVELING PADS ARE CONSTRUCTED.

Every crop it was read in — the drawing beside what the model took off it

Page 2

crop

p02_r09

page 2 · fill_settlement_and_pile_driving_note_for_end_bents_p02_r09
Original
p02_r09
{
  "view": "Notes",
  "objects": [
    {
      "name": "piles",
      "tag": "",
      "shape": "",
      "material": "",
      "count": null,
      "note": "Piles driven at Bents 1 and 4; also referenced at end bents."
    },
    {
      "name": "bents",
      "tag": "BENTS 1 AND 4",
      "shape": "",
      "material": "",
      "count": 2,
      "note": "Referenced in fill-settlement note."
    },
    {
      "name": "mechanically stabilized earth walls",
      "tag": "",
      "shape": "",
      "material": "",
      "count": null,
      "note": "Referenced in conjunction with pile protection requirements."
    },
    {
      "name": "wall leveling pads",
      "tag": "",
      "shape": "",
      "material": "",
      "count": null,
      "note": "To be constructed after piles at end bents are driven."
    }
  ],
  "measurements": [],
  "notes": [
    "FILL SETTLEMENT - PROTECT PILES DRIVEN AT BENTS 1 AND 4 FROM NEGATIVE SKIN FRICTION WHEN USED IN CONJUNCTION WITH MECHANICALLY STABILIZED EARTH WALLS, SEE SECTION 551 OF THE GEORGIA DOT SPECIFICATIONS. DRIVE PILES AT END BENTS BEFORE WALL LEVELING PADS ARE CONSTRUCTED."
  ],
  "labels": [],
  "description": "This crop is a structural note concerning fill settlement and negative skin friction on piles at Bents 1 and 4. It directs pile-driving sequencing at end bents relative to construction of wall leveling pads and references Georgia DOT Specifications Section 551."
}

p02_r09Notes

  • wall leveling padsTo be constructed after piles at end bents are driven.
crop

p02_r09 notes

page 2 · gdot_plan_ab5a9057847f41e3bb9d0ead3c6f2c22_p02_r09_notes
Original
p02_r09 notes
{
  "view": "Notes",
  "objects": [
    {
      "name": "piles",
      "tag": "",
      "shape": "",
      "material": "",
      "count": null,
      "note": "Piles driven at Bents 1 and 4 and at end bents are referenced."
    },
    {
      "name": "bents",
      "tag": "BENTS 1 AND 4",
      "shape": "",
      "material": "",
      "count": 2,
      "note": "Referenced in fill-settlement note."
    },
    {
      "name": "mechanically stabilized earth walls",
      "tag": "",
      "shape": "",
      "material": "",
      "count": null,
      "note": "Referenced in conjunction with negative skin friction protection."
    },
    {
      "name": "wall leveling pads",
      "tag": "",
      "shape": "",
      "material": "",
      "count": null,
      "note": "To be constructed after piles at end bents are driven."
    }
  ],
  "measurements": [],
  "notes": [
    "FILL SETTLEMENT - PROTECT PILES DRIVEN AT BENTS 1 AND 4 FROM NEGATIVE SKIN FRICTION WHEN USED IN CONJUNCTION WITH MECHANICALLY STABILIZED EARTH WALLS, SEE SECTION 551 OF THE GEORGIA DOT SPECIFICATIONS. DRIVE PILES AT END BENTS BEFORE WALL LEVELING PADS ARE CONSTRUCTED."
  ],
  "labels": [
    "SECTION 551 OF THE GEORGIA DOT SPECIFICATIONS"
  ],
  "description": "This crop contains a fill-settlement construction note. It directs protection of piles at Bents 1 and 4 from negative skin friction where mechanically stabilized earth walls are used, and gives pile-driving sequencing at end bents."
}

p02_r09 notesNotes

  • wall leveling padsTo be constructed after piles at end bents are driven.