Matched toExcavation Shoringbridge.construction_system.shoringon “Temporary Shoring”
| The class asks for | Value | How | From |
|---|---|---|---|
| LengthLwants m/mm | not establishedThe temporary-shoring notes state only that shoring is to be included as necessary for bridge construction; no shoring length is dimensioned or computable. | not found | |
| HeightHwants m/mm | not establishedNo temporary-shoring height is stated. The reference to minimum vertical clearance applies to protective platforms, not temporary shoring. | not found | |
| Surface AreaA_surfacewants m2 | not establishedNo temporary-shoring surface area is stated, and neither a shoring length nor height is available for area derivation. | not found | |
| Material TypeMAT | not establishedThe temporary-shoring note specifies only that its cost is to be included as necessary; it does not identify a shoring material. | not found |
Worked out by openai/gpt-5.6-terra-pro from the readings below, which are the source. A derived value shows its arithmetic — check it against the drawing before it is priced.
Every dimension read for it4
- 2021 EDITIONGeorgia Standard Specifications editionnot attributedp2 · p02_r11 left column list of specification and construction notes
- 2024Supplemental specifications yearnot attributedp2 · p02_r11 left column list of specification and construction notes
- 2021Georgia Standard Specifications editionnot attributedp2 · p02_r11
- 2024Supplemental specifications yearnot attributedp2 · p02_r11
Notes on the sheets that carry it
- p2SPECIFICATIONS - GEORGIA STANDARD SPECIFICATIONS, 2021 EDITION, AND 2024 SUPPLEMENTAL SPECIFICATIONS AS MODIFIED BY CONTRACT DOCUMENTS.
- p2REINFORCING STEEL - PLACE AND TIE ALL REINFORCING STEEL IN ACCORDANCE WITH THE GEORGIA DOT SPECIFICATIONS. DO NOT WELD REINFORCING STEEL. MAINTAIN 2 INCH MINIMUM CLEARANCE ON ALL REINFORCEMENT UNLESS OTHERWISE NOTED.
- p2CHAMFER - CHAMFER ALL EXPOSED CONCRETE EDGES 3/4" UNLESS OTHERWISE NOTED.
- p2RAILROAD SIDE DITCHES - PRIOR TO THE BEGINNING OF CONSTRUCTION, CLEAN THE RAILROAD SIDE DITCHES IN THE CONSTRUCTION AREA IN SUCH A MANNER AS TO PROVIDE POSITIVE DRAINAGE. MAINTAIN THE RAILROAD SIDE DITCHES FREE OF SILT AND DEBRIS UNTIL FINAL ACCEPTANCE. SEE ROADWAY PLANS FOR EROSION CONTROL AND PAYMENT.
- p2PROTECTIVE PLATFORMS - PROVIDE PROTECTIVE PLATFORMS AT THIS SITE, SEE SECTION 510 OF THE GEORGIA DOT SPECIFICATIONS. MAINTAIN A MINIMUM VERTICAL CLEARANCE AS DEFINED IN THE CONSTRUCTION CLEARANCE DIAGRAM.
- p2TEMPORARY SHORING - INCLUDE THE COST OF TEMPORARY SHORING AS NECESSARY FOR BRIDGE CONSTRUCTION IN THE OVERALL BID SUBMITTED.
- p2WAITING PERIOD - NONE REQUIRED.
- p2FOUNDATION BACKFILL MATERIAL - PLACE 1'-0" OF TYPE II FOUNDATION BACKFILL MATERIAL UNDER EACH FOOTING AT BENTS 2, AND. THE QUANTITY IS BASED ON THE PLAN FOOTING DIMENSIONS PLUS 2'-0" . USE OF THIS MATERIAL MAY BE ELIMINATED BY THE ENGINEER IF THE FOOTING AREA IS DRY.
- p2PLAN DRIVING OBJECTIVE - SEE SUBSTRUCTURE DETAILS.
- p2DRIVING RESISTANCE - DETERMINE DRIVING RESISTANCE FOR PILES USING DYNAMIC PILE TESTING IN ACCORDANCE WITH SUB-SECTION 520.3.05.D.2 OF THE GEORGIA DOT SPECIFICATIONS. DYNAMIC PILE TESTING SHALL BE REQUIRED AT BRIDGE LEFT BENT 1 RIGHT, BRIDGE LEFT BENT 3 LEFT, BRIDGE RIGHT BENT 2 RIGHT AND BRIDGE RIGHT BENT 4 RIGHT.
- p2DYNAMIC PILE TESTING - PERFORM PILE TESTING USING THE PILE DRIVING ANALYZER (PDA) IN ACCORDANCE WITH SPECIAL PROVISION SECTION 523. NOTIFY THE GEOTECHNICAL BUREAU OF THE GEORGIA DOT OFFICE OF MATERIALS AND TESTING AT GEOTECHNICAL_SUBMITTALS@DOT.GA.GOV TWO WEEKS PRIOR TO DRIVING PILES. SUBMIT ALL FILES REQUIRED BY SPECIAL PROVISION TO THE EMAIL ABOVE FOR REVIEW AND APPROVAL.
- p2WAVE EQUATION - PERFORM WAVE EQUATION ANALYSIS (WEAP) IN ACCORDANCE WITH SUB-SECTION 520.3.05.D.2 OF THE GEORGIA DOT SPECIFICATION. PROVIDE RESULTS OF THE WEAP TO THE GEOTECHNICAL BUREAU OF THE GEORGIA DOT OFFICE OF MATERIALS AND TESTING AT GEOTECHNICAL_SUBMITTALS@DOT.GA.GOV FOR REVIEW AND APPROVAL TWO WEEKS PRIOR TO DRIVING PILES.
- p2FOUNDATION BACKFILL MATERIAL - PLACE 1’-0” OF TYPE II FOUNDATION BACKFILL MATERIAL UNDER EACH FOOTING AT BENTS 2, AND 3. THE QUANTITY IS BASED ON THE PLAN FOOTING DIMENSIONS PLUS 2’-0”. USE OF THIS MATERIAL MAY BE ELIMINATED BY THE ENGINEER IF THE FOOTING AREA IS DRY.
Every crop it was read in — the drawing beside what the model took off it
Page 2
p02_r11 left column list of specification and construction notesNotes
- temporary shoringInclude cost as necessary for bridge construction in the overall bid.
2021 EDITION Georgia Standard Specifications edition2024 Supplemental specifications year2 INCH Minimum reinforcement clearance3/4" Chamfer size1'-0" Foundation backfill thickness2'-0" Foundation footing plan-dimension additionTWO WEEKS Notification/submittal period before driving piles
p02_r20 general notesNotes
- temporary shoringAs necessary for bridge construction.
1'-0" Foundation backfill thickness2'-0" Plan footing dimensions allowance
p02_r11Notes
- temporary shoringInclude cost as necessary for bridge construction in the overall bid.
2021 Georgia Standard Specifications edition2024 Supplemental specifications year2 INCH minimum reinforcement clearance3/4” concrete edge chamfer1’-0” foundation backfill thickness2’-0” foundation backfill plan footing dimension addition510 Georgia DOT Specifications section520.3.05.D.2 Georgia DOT Specifications sub-section+4 more
p02_r20Notes
- Temporary shoringAs necessary for bridge construction.
1'-0" Foundation backfill depth2'-0" Additional plan footing dimension allowance