Drawing to BOQpipeline control sheet
← Mindmapwhat the drawings said

Superstructure reinforcing steel, Bridge No. 1 right

1 page · 1 crop

Matched toReinforcing Barbridge.ancillary_system.reinforcement_system.rebaron “reinforcing steel”

5 not established
The class asks forValueHowFrom
Reinforcement Diameterbar_Dwants mmnot establishedThe Summary of Quantities identifies the item as Superstructure reinforcing steel, Bridge No. 1 right, pay item 511-3000, but gives only a lump-sum quantity. No bar diameter is stated.not found
Bar LengthL_barwants m/mmnot establishedThe item is listed as LUMP, LS. No individual reinforcing-bar length or dimensions from which a bar length can be derived are provided.not found
Reinforcement CountN_barwants countnot establishedThe item quantity is stated as LUMP, LS, not as a number of bars. No bar schedule or reinforcement marks/counts are provided.not found
Steel Gradefynot establishedThe table identifies reinforcing steel but does not state a steel grade or yield strength for pay item 511-3000.not found
MassMwants kg/tnot establishedSuperstructure reinforcing steel, Bridge No. 1 right (511-3000), is listed as LUMP, LS. The 35,397 LB quantity shown in the table applies to the separate pay item Bar reinforcing steel, 511-1000, and cannot be assigned to this item.not found

Worked out by openai/gpt-5.6-terra-pro from the readings below, which are the source. A derived value shows its arithmetic — check it against the drawing before it is priced.

How the sheets named it

511-3000

Every crop it was read in — the drawing beside what the model took off it

Page 2

No image

p02_r08

The merge put this crop under the item, but its reading names it differently — open the crop to see what it said.