Matched toSteel H Pilebridge.foundation_system.deep_foundation.pile.steel_hcheckon “steel H”
| The class asks for | Value | How | From |
|---|---|---|---|
| LengthLwants m/mm | 1603.248 m2720 LF + 2540 LF = 5260 LF; 5260 LF × 0.3048 m/LF = 1603.248 m.The Summary of Quantities gives installed steel H-pile quantities of 2720 LF for the Left Bridge and 2540 LF for the Right Bridge under pay item 520-1125. These are added to establish the total installation length. | derived | p2 · p02_r08 |
| Cross-sectional AreaAwants m2/mm2 | not establishedThe drawings identify the pile designation as HP 12 X 53, but do not state a cross-sectional area. No area can be honestly calculated from the listed installed lengths and designation alone without an external section-property table. | not found | |
| Instance CountNwants count | not establishedThe table provides total installed pile lengths only, 2720 LF and 2540 LF. It does not give individual pile lengths or a pile count, so the number of piles cannot be derived. | not found | |
| Steel Gradefy | not establishedThe item is identified as steel H-piling, HP 12 X 53, but no steel grade or yield strength is stated. | not found | |
| MassMwants kg/t | 126452.481 kg2720 LF + 2540 LF = 5260 LF; HP 12 X 53 designation denotes 53 LB/LF; 5260 LF × 53 LB/LF = 278780 LB; 278780 LB × 0.45359237 kg/LB = 126452.481 kg.The installed length is derived from the left and right bridge quantities for pay item 520-1125. The visible HP 12 X 53 designation conventionally identifies a 53 LB/LF H-pile; this is applied to the total installed length. The designation does not explicitly print the LB/LF unit in the crop. | derivedcheck | p2 · p02_r08 |
Worked out by openai/gpt-5.6-terra-pro from the readings below, which are the source. A derived value shows its arithmetic — check it against the drawing before it is priced.
How the sheets named it
Every dimension read for it3
- 2720 LFLeft bridge quantity, piling in placep2 · p02_r08 pay item quantity table for left right bridges
- 2540 LFRight bridge quantity, piling in placep2 · p02_r08 pay item quantity table for left right bridges
- 12 X 53Steel H pile designationp2 · p02_r08 pay item quantity table for left right bridges
Every crop it was read in — the drawing beside what the model took off it
Page 2
p02_r08
The merge put this crop under the item, but its reading names it differently — open the crop to see what it said.
p02_r08 pay item quantity table for left right bridgesTable
- Piling in place, steel H520-1125H-sectionsteelDescription is partially obscured after “HP”; a visible callout reads “12 X 53.”
35 CY Left bridge quantity, foundation backfill material35 CY Right bridge quantity, foundation backfill material295 CY Left bridge quantity, bridge excavation295 CY Right bridge quantity, bridge excavation811 SY Left bridge quantity, grooved concrete811 SY Right bridge quantity, grooved concreteLUMP LS Left bridge quantity, superstructure concreteLUMP LS Right bridge quantity, superstructure concrete+24 more