Drawing to BOQpipeline control sheet
← Mindmapwhat the drawings said

Steel H-pile Installation

1 page · 2 crops · foundation

Matched toSteel H Pilebridge.foundation_system.deep_foundation.pile.steel_hcheckon “steel H”

2 derived · 3 not established
The class asks forValueHowFrom
LengthLwants m/mm1603.248 m2720 LF + 2540 LF = 5260 LF; 5260 LF × 0.3048 m/LF = 1603.248 m.The Summary of Quantities gives installed steel H-pile quantities of 2720 LF for the Left Bridge and 2540 LF for the Right Bridge under pay item 520-1125. These are added to establish the total installation length.derivedp2 · p02_r08
Cross-sectional AreaAwants m2/mm2not establishedThe drawings identify the pile designation as HP 12 X 53, but do not state a cross-sectional area. No area can be honestly calculated from the listed installed lengths and designation alone without an external section-property table.not found
Instance CountNwants countnot establishedThe table provides total installed pile lengths only, 2720 LF and 2540 LF. It does not give individual pile lengths or a pile count, so the number of piles cannot be derived.not found
Steel Gradefynot establishedThe item is identified as steel H-piling, HP 12 X 53, but no steel grade or yield strength is stated.not found
MassMwants kg/t126452.481 kg2720 LF + 2540 LF = 5260 LF; HP 12 X 53 designation denotes 53 LB/LF; 5260 LF × 53 LB/LF = 278780 LB; 278780 LB × 0.45359237 kg/LB = 126452.481 kg.The installed length is derived from the left and right bridge quantities for pay item 520-1125. The visible HP 12 X 53 designation conventionally identifies a 53 LB/LF H-pile; this is applied to the total installed length. The designation does not explicitly print the LB/LF unit in the crop.derivedcheckp2 · p02_r08

Worked out by openai/gpt-5.6-terra-pro from the readings below, which are the source. A derived value shows its arithmetic — check it against the drawing before it is priced.

How the sheets named it

Piling in place, steel H, HPPiling in place, steel H520-1125

Every dimension read for it3

  • 2720 LFLeft bridge quantity, piling in placep2 · p02_r08 pay item quantity table for left right bridges
  • 2540 LFRight bridge quantity, piling in placep2 · p02_r08 pay item quantity table for left right bridges
  • 12 X 53Steel H pile designationp2 · p02_r08 pay item quantity table for left right bridges

Every crop it was read in — the drawing beside what the model took off it

Page 2

No image

p02_r08

The merge put this crop under the item, but its reading names it differently — open the crop to see what it said.

crop

p02_r08 pay item quantity table for left right bridges

page 2 · gdot_plan_ab5a9057847f41e3bb9d0ead3c6f2c22_p02_r08_pay_item_quantity_table_for_left_right_bridges
Original
p02_r08 pay item quantity table for left right bridges
{
  "view": "Table",
  "objects": [
    {
      "name": "Foundation backfill material",
      "tag": "207-0203",
      "shape": "",
      "material": "",
      "count": null,
      "note": "Listed for left and right bridge."
    },
    {
      "name": "Bridge excavation, grade separation",
      "tag": "211-0200",
      "shape": "",
      "material": "",
      "count": null,
      "note": "Listed for left and right bridge."
    },
    {
      "name": "Grooved concrete",
      "tag": "500-0100",
      "shape": "",
      "material": "concrete",
      "count": null,
      "note": "Listed for left and right bridge."
    },
    {
      "name": "Superstructure concrete",
      "tag": "500-1011",
      "shape": "",
      "material": "concrete",
      "count": null,
      "note": "CL D; separately listed as BR NO - I LT (249) and BR NO - I RT (249)."
    },
    {
      "name": "Concrete barrier",
      "tag": "500-2100",
      "shape": "",
      "material": "concrete",
      "count": null,
      "note": "Listed for left and right bridge."
    },
    {
      "name": "Class AA concrete",
      "tag": "500-3002",
      "shape": "",
      "material": "concrete",
      "count": null,
      "note": "Listed for left and right bridge."
    },
    {
      "name": "PSC beams, AASHTO Type II",
      "tag": "507-9002",
      "shape": "",
      "material": "precast concrete",
      "count": null,
      "note": "BR NO - I."
    },
    {
      "name": "PSC beams, AASHTO Type III",
      "tag": "507-9003",
      "shape": "",
      "material": "precast concrete",
      "count": null,
      "note": "BR NO - I."
    },
    {
      "name": "Bar reinforcement steel",
      "tag": "511-1000",
      "shape": "bar",
      "material": "steel",
      "count": null,
      "note": "Listed for left and right bridge."
    },
    {
      "name": "Superstructure reinforcement steel",
      "tag": "511-3000",
      "shape": "bar",
      "material": "steel",
      "count": null,
      "note": "Separately listed as BR NO - I LT (69762) and BR NO - I RT (69762)."
    },
    {
      "name": "Piling in place, steel H",
      "tag": "520-1125",
      "shape": "H-section",
      "material": "steel",
      "count": null,
      "note": "Description is partially obscured after “HP”; a visible callout reads “12 X 53.”"
    },
    {
      "name": "Load test, steel H",
      "tag": "520-4125",
      "shape": "H-section",
      "material": "steel",
      "count": null,
      "note": "HP 12 X 53 (IF REQD)."
    },
    {
      "name": "Dynamic pile test",
      "tag": "523-1100",
      "shape": "",
      "material": "",
      "count": null,
      "note": ""
    },
    {
      "name": "Chain link fence",
      "tag": "643-1152",
      "shape": "",
      "material": "",
      "count": null,
      "note": "ZC COAT, 6 FT, 9 GA."
    }
  ],
  "measurements": [
    {
      "label": "Left bridge quantity, foundation backfill material",
      "value": "35",
      "unit": "CY",
      "appliesTo": "207-0203"
    },
    {
      "label": "Right bridge quantity, foundation backfill material",
      "value": "35",
      "unit": "CY",
      "appliesTo": "207-0203"
    },
    {
      "label": "Left bridge quantity, bridge excavation",
      "value": "295",
      "unit": "CY",
      "appliesTo": "211-0200"
    },
    {
      "label": "Right bridge quantity, bridge excavation",
      "value": "295",
      "unit": "CY",
      "appliesTo": "211-0200"
    },
    {
      "label": "Left bridge quantity, grooved concrete",
      "value": "811",
      "unit": "SY",
      "appliesTo": "500-0100"
    },
    {
      "label": "Right bridge quantity, grooved concrete",
      "value": "811",
      "unit": "SY",
      "appliesTo": "500-0100"
    },
    {
      "label": "Left bridge quantity, superstructure concrete",
      "value": "LUMP",
      "unit": "LS",
      "appliesTo": "500-1011"
    },
    {
      "label": "Right bridge quantity, superstructure concrete",
      "value": "LUMP",
      "unit": "LS",
      "appliesTo": "500-1011"
    },
    {
      "label": "Left bridge quantity, concrete barrier",
      "value": "378",
      "unit": "LF",
      "appliesTo": "500-2100"
    },
    {
      "label": "Right bridge quantity, concrete barrier",
      "value": "378",
      "unit": "LF",
      "appliesTo": "500-2100"
    },
    {
      "label": "Left bridge quantity, Class AA concrete",
      "value": "221",
      "unit": "CY",
      "appliesTo": "500-3002"
    },
    {
      "label": "Right bridge quantity, Class AA concrete",
      "value": "221",
      "unit": "CY",
      "appliesTo": "500-3002"
    },
    {
      "label": "Left bridge quantity, PSC beams AASHTO Type II",
      "value": "644",
      "unit": "LF",
      "appliesTo": "507-9002"
    },
    {
      "label": "Right bridge quantity, PSC beams AASHTO Type II",
      "value": "644",
      "unit": "LF",
      "appliesTo": "507-9002"
    },
    {
      "label": "Left bridge quantity, PSC beams AASHTO Type III",
      "value": "486",
      "unit": "LF",
      "appliesTo": "507-9003"
    },
    {
      "label": "Right bridge quantity, PSC beams AASHTO Type III",
      "value": "486",
      "unit": "LF",
      "appliesTo": "507-9003"
    },
    {
      "label": "Left bridge quantity, bar reinforcement steel",
      "value": "35422",
      "unit": "LB",
      "appliesTo": "511-1000"
    },
    {
      "label": "Right bridge quantity, bar reinforcement steel",
      "value": "35397",
      "unit": "LB",
      "appliesTo": "511-1000"
    },
    {
      "label": "Left bridge quantity, superstructure reinforcement steel",
      "value": "LUMP",
      "unit": "LS",
      "appliesTo": "511-3000"
    },
    {
      "label": "Right bridge quantity, superstructure reinforcement steel",
      "value": "LUMP",
      "unit": "LS",
      "appliesTo": "511-3000"
    },
    {
      "label": "Left bridge quantity, piling in place",
      "value": "2720",
      "unit": "LF",
      "appliesTo": "520-1125"
    },
    {
      "label": "Right bridge quantity, piling in place",
      "value": "2540",
      "unit": "LF",
      "appliesTo": "520-1125"
    },
    {
      "label": "Steel H pile designation",
      "value": "12 X 53",
      "unit": "",
      "appliesTo": "520-1125"
    },
    {
      "label": "Left bridge quantity, load test",
      "value": "1",
      "unit": "EA",
      "appliesTo": "520-4125"
    },
    {
      "label": "Right bridge quantity, load test",
      "value": "1",
      "unit": "EA",
      "appliesTo": "520-4125"
    },
    {
      "label": "Pile designation, load test",
      "value": "12 X 53",
      "unit": "",
      "appliesTo": "520-4125"
    },
    {
      "label": "Left bridge quantity, dynamic pile test",
      "value": "2",
      "unit": "EA",
      "appliesTo": "523-1100"
    },
    {
      "label": "Right bridge quantity, dynamic pile test",
      "value": "2",
      "unit": "EA",
      "appliesTo": "523-1100"
    },
    {
      "label": "Left bridge quantity, chain link fence",
      "value": "378",
      "unit": "LF",
      "appliesTo": "643-1152"
    },
    {
      "label": "Right bridge quantity, chain link fence",
      "value": "378",
      "unit": "LF",
      "appliesTo": "643-1152"
    },
    {
      "label": "Fence height",
      "value": "6",
      "unit": "FT",
      "appliesTo": "643-1152"
    },
    {
      "label": "Fence gauge",
      "value": "9",
      "unit": "GA",
      "appliesTo": "643-1152"
    }
  ],
  "notes": [],
  "labels": [
    "SUMMARY OF QUANTITIES",
    "PAY ITEM NUMBER",
    "LEFT BRIDGE",
    "RIGHT BRIDGE",
    "UNIT",
    "PAY ITEM"
  ],
  "description": "This crop is a Summary of Quantities table for left and right bridge work. It lists pay items, units, and quantities for excavation, concrete, barriers, PSC beams, reinforcing steel, steel H-pile work and testing, and chain link fence."
}

p02_r08 pay item quantity table for left right bridgesTable

  • Piling in place, steel H520-1125H-sectionsteelDescription is partially obscured after “HP”; a visible callout reads “12 X 53.”

35 CY Left bridge quantity, foundation backfill material35 CY Right bridge quantity, foundation backfill material295 CY Left bridge quantity, bridge excavation295 CY Right bridge quantity, bridge excavation811 SY Left bridge quantity, grooved concrete811 SY Right bridge quantity, grooved concreteLUMP LS Left bridge quantity, superstructure concreteLUMP LS Right bridge quantity, superstructure concrete+24 more