Every dimension read for it61
- 3"Smooth dowel bar hole diameterp2 · p02_r02
- 12"Smooth dowel bar hole depthp2 · p02_r02
- 30 LBS PER SQ FTFuture paving allowancenot attributedp2 · p02_r02
- 3"Smooth dowel bar hole diameterp2 · p02_r02 general notes continued
- 12"Smooth dowel bar hole depthp2 · p02_r02 general notes continued
- 2Seismic performance zonenot attributedp2 · p02_r02 general notes continued
- 0.142A_Snot attributedp2 · p02_r02 general notes continued
- 0.155S_Dnot attributedp2 · p02_r02 general notes continued
- 30 LBS PER SQ FTFuture paving allowancenot attributedp2 · p02_r02 general notes continued
- 3”Formed hole diameterp2 · p02_r03 long list of construction and material general notes
- 12”Formed hole depthp2 · p02_r03 long list of construction and material general notes
- 3"Dowel-bar hole diameterp2 · p02_r03
- 12"Dowel-bar hole depthp2 · p02_r03
- 1'-6 3/16"Partial dimension at top of cropnot attributedp10 · p10_r05 general construction notes 1 12 for beam
- 1 3/4"Fixed-end hole diameterp10 · p10_r05 general construction notes 1 12 for beam
- 7"Fixed-end hole depthp10 · p10_r05 general construction notes 1 12 for beam
- 4" X 1 3/4" X 7"Expansion-end slot sizep10 · p10_r05 general construction notes 1 12 for beam
- 1 1/2"Smooth dowel diameterp10 · p10_r05 general construction notes 1 12 for beam
- 1 1/2″Smooth dowel diameterp10 · p10_r09 notes of psc beam
- 1'-6 3/16"partial dimension at top of cropnot attributedp10 · p10_r05
- 1 3/4"fixed-end hole diameterp10 · p10_r05
- 7"fixed-end hole depthp10 · p10_r05
- 4"expansion-end slot widthp10 · p10_r05
- 1 3/4"expansion-end slot dimensionp10 · p10_r05
- 7"expansion-end slot depthp10 · p10_r05
- 1 1/2"smooth dowel diameterp10 · p10_r05
- 1 1/2"smooth dowel diameterp10 · p10_r09
- 1 1/2”Smooth dowel diameterp11 · p11_r10
- 1'-2 3/16"dimensionnot attributedp11 · p11_r07 general notes items 1 through 12 for beam fabrication
- 1 1/2"Smooth dowel diameterp11 · p11_r10 notes of beam notes
- 1'-2 3/16"partial dimension at top of cropnot attributedp11 · p11_r07
- 1 1/2"smooth dowel diameterp11 · p11_r07
- 1 1/2”Smooth dowel diameterp12 · p12_r04
- 1½”Diameterp12 · p12_r05
- 1'-0"Dowel vertical dimensionp12 · p12_r02
- 1 1/2"Dowel diameterp12 · p12_r02
- 1'-0”dowel lengthp12 · p12_r02 section through beam showing bearing pad shim plate and dowel
- 1 1/2”dowel diameterp12 · p12_r02 section through beam showing bearing pad shim plate and dowel
- 1/2”smooth dowel diameterp12 · p12_r04 notes of bearing pad design notes
- 1 1/2”Diameterp12 · p12_r05 notes of bearing pad design notes
- 3"dowel-bar hole diameterp14 · bent_2_left
- 12"dowel-bar hole depthp14 · bent_2_left
- 1 1/2"dowel-bar diameterp14 · bent_2_left
- 1 1/2”smooth dowel bar diameterp14 · bent_2_right
- 3"Dowel hole diameterp15 · bent_3_left
- 12"Dowel hole depthp15 · bent_3_left
- 1 1/2"Smooth dowel bar diameterp15 · bent_3_left
- 15°Anglenot attributedp15 · bent_3_left
- 18+63.35stationnot attributedp15 · p15_r01 plan of bent 3 left beam spacing
- 1 1/2"smooth dowel bar diameterp15 · p15_r01 plan of bent 3 left beam spacing
- 1 1/2"smooth dowel bar diameterp15 · p15_r02 plan of bent 3 right beam spacing
- 2 3/4"typical dowel offsetp17 · bent_4_left
- 3"dowel-hole diameterp17 · bent_4_left
- 12"dowel-hole depthp17 · bent_4_left
- 1 1/2"smooth-dowel diameterp17 · bent_4_left
- 22'-0"Plan offset dimensionnot attributedp17 · bent_4_right
- 1½"Smooth dowel diameterp17 · bent_4_right
- 22'-0"Distance to ahead referencenot attributedp17 · p17_r02 plan of beam spacing and dowels at bent 4 right
- 81°-20'-05.0"Skew angle, typicalnot attributedp17 · p17_r02 plan of beam spacing and dowels at bent 4 right
- 2 3/4"Typical dimensionnot attributedp17 · p17_r02 plan of beam spacing and dowels at bent 4 right
- 1 1/2"Smooth dowel diameterp17 · p17_r02 plan of beam spacing and dowels at bent 4 right
Notes on the sheets that carry it
- p2VIBRATION MONITORING - THE PROJECT ENGINEER SHOULD CONTACT THE GEOTECHNICAL BUREAU OF THE GEORGIA DOT OFFICE OF MATERIALS AND TESTING AT GEOTECHNICAL_SUBMITTALS @DOT.GA.GOV TWO WEEKS PRIOR TO DRIVING PILES. SEE SPECIAL PROVISION 154 - CONSTRUCTION VIBRATION MONITORING.
- p2STEEL H-PILES - USE STEEL FOR H-PILES THAT MEETS THE REQUIREMENTS OF ASTM A 709 GR 50.
- p2PILE LENGTHS - ERRATIC PILE LENGTHS CAN BE EXPECTED.
- p2PILE DRIVING - SHOULD PILES FAIL TO OBTAIN DRIVING RESISTANCE AFTER ACHIEVING THE PILE TIP ELEVATIONS SHOWN, ALLOW PILES TO FREEZE A MINIMUM OF 24 HOURS AND RESTRIKE WITH A WARM HAMMER.
- p2SMOOTH DOWEL BARS - PLACE SMOOTH DOWEL BARS IN FORMED 3” DIAMETER X 12” DEEP HOLES AND GROUT IN PLACE SIMILAR TO ANCHOR BOLTS, SEE SUB-SECTION 501.3.05.B.3 OF THE GEORGIA DOT SPECIFICATIONS. STIRRUPS MAY BE SHIFTED SLIGHTLY FOR FORMED HOLES.
- p2ABUTMENT SOIL REINFORCING DEVICE INSERTS - INCLUDE THE COST OF FURNISHING AND INSTALLING INSERTS FOR SOIL REINFORCING DEVICES AT ABUTMENT IN THE OVERALL BID SUBMITTED...
- p2VIBRATION MONITORING - THE PROJECT ENGINEER SHOULD CONTACT THE GEOTECHNICAL BUREAU OF THE GEORGIA DOT OFFICE OF MATERIALS AND TESTING AT LEAST TWO WEEKS PRIOR TO DRIVING PILES. SEE GEOTECHNICAL_SUBMITTALS@DOT.GA.GOV
- p2SPECIAL PROVISION 154 - CONSTRUCTION VIBRATION MONITORING.
- p2STEEL H-PILES - USE STEEL FOR H-PILES THAT MEETS THE REQUIREMENTS OF ASTM A 709 GRADE 50.
- p2SMOOTH DOWEL BARS - PLACE SMOOTH DOWEL BARS IN FORMED 3" DIAMETER X 12" DEEP HOLES AND GROUT IN PLACE SIMILAR TO ANCHOR BOLTS, SEE SUB-SECTION 501.3.05.B.3 OF THE GEORGIA DOT SPECIFICATIONS. STIRRUPS MAY BE SHIFTED SLIGHTLY TO CLEAR FORMED HOLES.
- p2ABUTMENT SOIL REINFORCING DEVICE INSERTS - INCLUDE THE COST OF FURNISHING AND INSTALLING INSERTS FOR SOIL REINFORCING DEVICES AT ABUTMENT IN THE OVERALL [partial; crop cuts off].
- p2VIBRATION MONITORING - THE PROJECT ENGINEER SHOULD CONTACT THE GEOTECHNICAL BUREAU OF THE GEORGIA DOT OFFICE OF MATERIALS AND TESTING AT GEOTECHNICAL-SUBMITTAL@DOT.GA.GOV TWO WEEKS PRIOR TO DRIVING PILES. SEE SPECIAL PROVISION 154 - CONSTRUCTION VIBRATION MONITORING.
- p2FILL SETTLEMENT - PROTECT PILES DRIVEN AT BENTS 1 AND 4 FROM NEGATIVE SKIN FRICTION WHEN USED IN CONJUNCTION WITH MECHANICALLY STABILIZED EARTH WALLS, SEE SECTION 551 OF THE GEORGIA DOT SPECIFICATIONS. DRIVE PILES AT END BENTS BEFORE WALL LEVELING PADS ARE CONSTRUCTED.
- p2STEEL DIAPHRAGMS - AT CONTRACTOR’S OPTION, STEEL DIAPHRAGMS MAY BE USED IN LIEU OF THE CONCRETE DIAPHRAGMS SHOWN IN THE PLANS. AT A MINIMUM, STEEL DIAPHRAGMS ARE TO BE DESIGNED AT STRENGTH LIMIT STATE III WITH A THREE SECOND GUST WIND SPEED OF 140MPH APPLIED TO ONE HALF OF THE VERTICAL SURFACE AREA OF THE EXPOSED BEAM USING EXPOSURE CATEGORY D. CROSS FRAME CONFIGURATIONS SHALL HAVE A HORIZONTAL ANGLE OR CHANNEL AT EITHER THE TOP OR BOTTOM POSITION. STEEL DIAPHRAGMS SHALL BE MANUFACTURED BY A FABRICATOR LISTED ON QPL 60 PER SECTION 501 OR GREATER STEEL. ALL COMPONENTS OF THE STEEL DIAPHRAGM SHALL BE GALVANIZED ACCORDING TO ASTM A 123. CONNECTION BOLTS SHALL CONFORM TO ASTM F3125 (GRADE A325). NUTS SHALL CONFORM TO ASTM A563. WASHERS SHALL CONFORM TO ASTM F436. ALL HARDWARE SHALL BE GALVANIZED ACCORDING TO ASTM A153. STABILITY OF THE BEAMS AND STRUCTURE DURING ALL PHASES OF CONSTRUCTION ARE THE SOLE RESPONSIBILITY OF THE CONTRACTOR. SUBMIT SHOP DRAWINGS AND CALCULATIONS FOR THE STEEL DIAPHRAGMS TO THE ENGINEER FOR REVIEW AND ACCEPTANCE. THE USE OF STEEL DIAPHRAGMS SHALL BE INCLUDED IN THE PRICE BID FOR “LUMP-SUM PREST CONCRETE.”
- p2STANDARD PLAN MODIFICATION - MODIFY THE APPROACH SLAB STANDARD TO INCREASE THE 3/4” EXPANSION JOINT SHOWN BETWEEN THE APPROACH SLAB AND THE BACK FACE PAVING REST AND END POST TO 1 3/8” AT BENT 1 AND 4. KEEP THE EXPANSION JOINT AT END BENT CONTINUOUS AROUND END POST. INCLUDE COST OF JOINT IN APPROACH SLAB PAYMENT. SEE ROADWAY PLANS FOR APPROACH SLAB PAVEMENT.
- p2GROOVED CONCRETE - GROOVE THE ENTIRE LENGTH OF THE BRIDGE TRANSVERSELY AS PER SUB-SECTION 500.3.05.T.9.C. OF THE GEORGIA DOT SPECIFICATIONS. PROVIDE GROOVING BEFORE PLACING TRAFFIC ON DECK.
- p2CHAIN LINK FENCE - CHAIN LINK FENCE SHALL BE PAID FOR AS “LF CH LK FENCE, ZC COAT, 6FT, 9 GA.”
- p2WELDING - ALL WELDING ON GEORGIA DOT PROJECTS SHALL BE PERFORMED BY GDOT CERTIFIED WELDERS THAT HAVE IN THEIR POSSESSION A CURRENT WELDING CERTIFICATION CARD ISSUED BY THE OFFICE OF MATERIALS AND TESTING. USE ONLY E70XX (EXCLUDING E7014 AND E7024) LOW HYDROGEN ELECTRODES FOR MANUAL SHIELDED METAL ARC WELDING.
- p2SPECIAL PROTECTIVE COATING - CLEAN AND PAINT PILES AND SWAYBRACING WITH SPECIAL PROTECTIVE COATING NO. 2P IN ACCORDANCE WITH SECTIONS 520 AND 535 OF THE GEORGIA DOT SPECIFICATIONS. EXTEND COATING FROM TOP OF PILE TO 2FT BELOW GROUND FOR END BENT PILING. EXTEND COATING FROM BOTTOM OF CAP OR PEDESTAL FOOTING TO 5FT BELOW GROUND FOR INTERMEDIATE BENT PILING, REGARDLESS OF ENCASEMENT.
- p2SHOP DRAWING SUBMISSION - SUBMIT SHOP DRAWINGS WITH DEPENDENT INFORMATION AS A SET. SHOP DRAWINGS FOR BEAMS, METAL DECK FORMS AND STEEL DIAPHRAGMS WILL NOT BE REVIEWED UNTIL ALL HAVE BEEN RECEIVED.
- p2INCIDENTAL ITEMS - INCLUDE THE COST INCIDENTAL TO THE WORK THAT IS NOT SPECIFICALLY COVERED BY THE GEORGIA STANDARD SPECIFICATIONS, SUPPLEMENTAL SPECIFICATIONS AND/OR SPECIAL PROVISIONS IN THE OVERALL BID SUBMITTED. THIS INCLUDES THE COST OF WATERPROOFING, JOINT FILLERS AND OTHER INCIDENTAL ITEMS NECESSARY TO COMPLETE THE WORK.
- p2provide table for 2’ above estimated tip elevations
- p2STEEL DIAPHRAGMS - AT CONTRACTOR’S OPTION, STEEL DIAPHRAGMS MAY BE USED IN LIEU OF THE CONCRETE DIAPHRAGMS SHOWN IN THE PLANS. AT A MINIMUM, STEEL DIAPHRAGMS ARE TO BE DESIGNED AT STRENGTH LIMIT STATE III WITH A THREE SECOND GUST WIND SPEED OF 140MPH APPLIED TO ONE HALF OF THE VERTICAL SURFACE AREA OF THE EXPOSED BEAM USING EXPOSURE CATEGORY D. CROSS FRAME CONFIGURATIONS SHALL HAVE A HORIZONTAL ANGLE OR CHANNEL AT EITHER THE TOP OR BOTTOM POSITION. STEEL DIAPHRAGMS SHALL BE MANUFACTURED BY A FABRICATOR LISTED ON QPL 60 PER SECTION 501 OR GREATER STEEL. ALL COMPONENTS OF THE STEEL DIAPHRAGMS SHALL BE GALVANIZED ACCORDING TO ASTM A 123. CONNECTION BOLTS SHALL CONFORM TO ASTM F3125 (GRADE A325). NUTS SHALL CONFORM TO ASTM A563. WASHERS SHALL CONFORM TO ASTM F436. ALL HARDWARE SHALL BE GALVANIZED ACCORDING TO ASTM A153. STABILITY OF THE BEAMS AND STRUCTURE DURING ALL PHASES OF CONSTRUCTION ARE THE SOLE RESPONSIBILITY OF THE CONTRACTOR. SUBMIT SHOP DRAWINGS AND CALCULATIONS FOR THE STEEL DIAPHRAGMS TO THE ENGINEER FOR REVIEW AND ACCEPTANCE. THE USE OF STEEL DIAPHRAGMS SHALL BE INCLUDED IN THE PRICE BID FOR “LUMP-SUM” SUPERSTRUCTURE CONCRETE.”
- p2STANDARD PLAN MODIFICATION - MODIFY THE APPROACH SLAB STANDARD TO INCREASE THE 3/4” EXPANSION JOINT SHOWN BETWEEN THE APPROACH SLAB AND THE BACK FACE PAVING REST AND END POST TO 3/8” AT BENT 1 AND 4. KEEP THE EXPANSION JOINT AT END BENT CONTINUOUS AROUND END POST. INCLUDE COST OF JOINT IN APPROACH SLAB PAYMENT. SEE ROADWAY PLANS FOR APPROACH SLAB PAVEMENT.
- p101. BEAMS SHALL BE MAINTAINED IN AN UPRIGHT POSITION AT ALL TIMES AND SHALL BE PICKED UP WITHIN 4'-6" FROM THEIR ENDS. DISREGARDING THIS REQUIREMENT COULD LEAD TO COLLAPSE OF THE BEAM. PICK-UPS SHALL BE EMBEDDED TO WITHIN 4" OF THE BOTTOM OF THE BEAM. DETAILS OF PICK-UPS SHALL BE INCLUDED IN THE SHOP DRAWINGS.
- p102. CHAMFER EDGES OF BEAMS 1/2" OR 3/4".
- p103. HORIZONTAL DIMENSIONS ARE IN PLACE DIMENSIONS. THE BEAM LENGTH INCLUDES THE 1/8" EPOXY MORTAR AT EACH END. SHOP DRAWINGS SHALL ADJUST HORIZONTAL DIMENSIONS FOR GRADE AND FABRICATION EFFECTS SUCH AS SHRINKAGE AND ELASTIC SHORTENING.
- p104. AT ℄ BEARING, FORM A 1 3/4" DIAMETER X 7" DEEP HOLE AT THE FIXED ENDS AND A 4" X 1 3/4" X 7" DEEP SLOT AT THE EXPANSION ENDS FOR A 1 1/2" DIAMETER SMOOTH DOWEL. SEE PLAN AND ELEVATION SHEET FOR LOCATION OF FIXED AND EXPANSION ENDS.
- p105. TOPS OF BEAMS SHALL BE ROUGH FLOATED AT APPROXIMATELY THE TIME OF INITIAL SET. ENTIRE TOP SHALL BE SCRUBBED TRANSVERSELY WITH A COARSE BRUSH TO REMOVE ALL LAITANCE AND TO PRODUCE A ROUGHENED SURFACE FOR BONDING TO THE SLAB. ROUGHENED SURFACE SHALL HAVE AN AMPLITUDE OF APPROXIMATELY 1/4". CONCRETE FINS OR PROJECTIONS SHALL BE REMOVED TO PRODUCE A VERTICAL FACE AT THE EDGE OF THE BEAM.
- p106. ALL HOLES FORMED INTO THE BEAMS TO FACILITATE TRANSPORT SHALL BE FILLED AND GIVEN A TYPE I FINISH, PRIOR TO ACCEPTANCE OF THE BEAM. REMOVE PVC OR SIMILAR FORMING MATERIALS FROM EACH HOLE, EXPOSING THE CONCRETE SURFACE. COAT INTERIOR OF HOLE WITH A TYPE II EPOXY RESIN ADHESIVE IN ACCORDANCE WITH GEORGIA STANDARD SPECIFICATION 886 AND FILL WITH A RAPID SETTING PATCHING MATERIAL IN ACCORDANCE WITH GEORGIA STANDARD SPECIFICATION 934.
- p107. NON-COMPOSITE DEAD LOAD DEFLECTION (ΔNC) AT THE MIDPOINT IS DUE TO THE WEIGHT OF THE SLAB AND COPING.
- p108. COMPOSITE DEAD LOAD DEFLECTION (ΔC) AT THE MIDPOINT IS DUE TO THE WEIGHT OF BARRIER.
- p109. STRANDS SHALL MEET ALL REQUIREMENTS OF ASTM A 416 GRADE 270.
- p1010. PRESTRESSING DATA IS AS FOLLOWS:
- p10A. USE 20 - 1/2" DIAMETER SPECIAL LOW-RELAXATION (A = 0.167 SQ IN) STRANDS. PRETENSION STRANDS TO 33,818 LBS EACH.
- p10B. PRETENSIONED STRANDS SHALL BE RELEASED AFTER THE CONCRETE HAS REACHED A MINIMUM STRENGTH (fci) OF 5,200 PSI.
- p10C. INCLUDING THE TOP STRANDS, THE TOTAL JACKING FORCE OF PRETENSIONING IS 676,350 LBS.
- p10D. INCLUDING THE TOP STRANDS, THE NET PRESTRESSING FORCE OF THE STRANDS AFTER ALL LOSSES IS 536,584 LBS.
- p1011. CONCRETE STRENGTH (f'c) = 6,500 PSI.
- p1012. ALLOWABLE PSC BEAM TENSION = 484 PSI.
Every crop it was read in — the drawing beside what the model took off it
Page 2
p02_r02Notes
- Smooth dowel barscircularPlaced in formed holes and grouted in place.
TWO WEEKS Vibration monitoring notice period3" Smooth dowel bar hole diameter12" Smooth dowel bar hole depth24 HOURS Minimum pile freeze period2 Seismic performance zone0.142 AS0.155 SDI30 LBS PER SQ FT Future paving allowance+8 more
p02_r02 general notes continuedNotes
- smooth dowel barscylindricalPlaced in formed holes and grouted in place.
TWO WEEKS Advance notice before driving piles50 Steel H-pile material grade3" Smooth dowel bar hole diameter12" Smooth dowel bar hole depth24 HOURS Pile freeze duration2 Seismic performance zone0.142 A_S0.155 S_D+7 more
p02_r03 long list of construction and material general notesNotes
- Smooth dowel barscylindricalPlaced in formed holes and grouted in place.
154 Special ProvisionTWO WEEKS Submittal period before driving piles24 HOURS Minimum freeze period3” Formed hole diameter12” Formed hole depth1 AND 4 Bent numbers140MPH Wind speedONE HALF Wind exposure+8 more
p02_r03Notes
- Smooth dowel barscylindricalPlaced in formed holes and grouted in place.
TWO WEEKS Advance notice before driving piles3" Dowel-bar hole diameter12" Dowel-bar hole depth24 HOURS Minimum pile freeze period140MPH Design gust wind speed3/4" Expansion joint shown between approach slab and back face paving rest/end post3/8" Expansion joint at Bent 1 and 46FT Chain link fence height+3 more
Page 10
p10_r05 general construction notes 1 12 for beamNotes
- smooth dowelcircularSpecified at fixed and expansion bearing ends.
1'-6 3/16" Partial dimension at top of crop4'-6" Beam pickup distance from ends4" Pickup embedment distance from bottom of beam1/2" OR 3/4" Beam edge chamfer1/8" Epoxy mortar at each beam end1 3/4" Fixed-end hole diameter7" Fixed-end hole depth4" X 1 3/4" X 7" Expansion-end slot size+11 more
p10_r09 notes of psc beamNotes
- smooth dowelcircularReferenced for fixed and expansion ends.
1/8″ Epoxy mortar thickness at each beam end1 3/4″ Diameter of hole at fixed ends7″ Depth of hole at fixed ends4″ Slot width at expansion ends1 3/4″ Slot dimension at expansion ends7″ Slot depth at expansion ends1 1/2″ Smooth dowel diameter1/4″ Roughened surface amplitude+1 more
p10_r05Notes
- smooth dowelcircularReferenced at fixed and expansion bearing ends.
1'-6 3/16" partial dimension at top of crop4'-6" pick-up location from beam ends4" pick-up embedment from bottom of beam1/2" OR 3/4" beam edge chamfer1/8" epoxy mortar at each beam end1 3/4" fixed-end hole diameter7" fixed-end hole depth4" expansion-end slot width+13 more
p10_r09Notes
- smooth dowelcircularSpecified at bearing; fixed-end holes and expansion-end slots are noted.
1/8" epoxy mortar at each beam end1 3/4" fixed-end hole diameter7" fixed-end hole depth4" expansion-end slot width1 3/4" expansion-end slot length7" expansion-end slot depth1 1/2" smooth dowel diameter1/4" roughened top-surface amplitude
Page 11
p11_r10Notes
- Smooth dowelcircularReferenced at bearing holes and slots.
5’-6” Pick-up location from beam ends4” Pick-up embedment from bottom of beam1/2” Beam edge chamfer3/4” Beam edge chamfer1/8” Epoxy mortar at each beam end1 3/4” Fixed-end hole diameter7” Fixed-end hole depth4” Expansion-end slot width+8 more
p11_r07 general notes items 1 through 12 for beam fabricationNotes
- DowelcircularSpecified at bearing locations.
1'-2 3/16" dimension79'-7 5/8" ℄ BEARING TO ℄ BEARING1" dimension3" dimension2" hole diameter4-35I AT 4" EACH WAY reinforcement5" diameter5'-6" pick-up distance from beam ends+20 more
p11_r10 notes of beam notesNotes
- smooth dowelcircularReferenced for fixed and expansion ends.
5'-6" Pick-up distance from beam ends4" Pick-up embedment from bottom of beam1/2" Beam edge chamfer3/4" Beam edge chamfer1/8" Epoxy mortar at each beam end1 3/4" Fixed-end hole diameter7" Fixed-end hole depth4" Expansion-end slot width+4 more
p11_r07Notes
- Dowel×1circularsmoothReferenced for fixed and expansion bearing-end connection.
1'-2 3/16" partial dimension at top of crop79'-7 5/8" centerline bearing to centerline bearing5'-6" beam pick-up distance from ends4" pick-up embedment from bottom of beam1/2" beam edge chamfer3/4" beam edge chamfer1/8" epoxy mortar at each beam end1 3/4" fixed-end hole diameter+25 more
Page 12
p12_r04Notes
- Smooth dowelscircularASTM A709 Grade 50
1 1/2” Smooth dowel diameter60 durometer Bearing pad hardness3” Hole diameter1/4” Bearing pad cover3/16” Load plate thickness12 GAGE Internal plate gage1 1/2° Mold draft
p12_r05Notes
- Smooth dowelscircularASTM A709 Grade 50 steelSpecified as smooth dowels.
1½” Diameter60 durometer Hardness
p12_r02Section
- Smooth dowel×1circular rodVertical dowel shown through bearing assembly.
5/8" Shim/bearing assembly vertical dimension1" Bearing pad vertical dimension1'-0" Dowel vertical dimension1 1/2" Dowel diameter
p12_r02 section through beam showing bearing pad shim plate and dowelSection
- smooth dowel×1circular rodVertical dowel shown at beam centerline.
5/8” shim plate thickness1” bearing pad thickness1'-0” dowel length1 1/2” dowel diameter
p12_r04 notes of bearing pad design notesNotes
- smooth dowelscircularASTM A709 Grade 50
1/2” smooth dowel diameter60 durometer bearing pad hardness3” hole diameter1/4” cover3/16” load plate thickness12 GAGE internal plate gage1 1/2° mold draft
p12_r05 notes of bearing pad design notesNotes
- smooth dowelscircularASTM A709 Grade 501 1/2 inch diameter.
14.7.6 Bearing pad design specification section18 Bearing device construction specification section1 1/2” Diameter
Page 13
bent_1_leftUnclear
- smooth dowelcircularTypical dowel/hole callout shown at beam locations.
22'-0" horizontal distance to SR 2181°-20'-05.0" skew angle17+26.35 station17+23.00 station5'-4¾" end dimension3'-0⅞" end dimension6'-10½" end dimension6'-10 9/16" end dimension+31 more
Page 14
bent_2_leftElevation
- dowel bar×6circularsmooth steelPlan callout: 1 1/2 in. diameter smooth dowel bar, typical.
42'-6" cap plan overall length2'-3 3/8" cap plan end dimension, left2'-3 5/16" cap plan end dimension, right6'-0" beam centerline end spacing7'-7 1/2" beam centerline spacing7'-7/16" bearing spacing8'-20'-05.0" typical cap plan dimension2'-9 3/8" dimension at STA. 17+81.35+58 more
bent_2_rightElevation
- smooth dowel barcircularCalled out as typical in formed holes.
81°-20'-05.0” skew angle22’-0” dimension17+74.65 station81°-20’-05.0” skew angle3” formed hole diameter12” formed hole depth1 1/2” smooth dowel bar diameter11 1/2” cap vertical dimension+50 more
Page 15
bent_3_leftElevation
- smooth dowel barcircularCallout specifies 1 1/2 in. diameter smooth dowel bars in formed holes.
81°-20'-05.0" Angle81°-20'-05.0" Angle22'-0" Offset from SR 21 WB = PGLSTA. 18+63.35 Station3" Dowel hole diameter12" Dowel hole depth1 1/2" Smooth dowel bar diameter11 1/2" Bent plan width segment+54 more
p15_r01 plan of bent 3 left beam spacingPlan
- smooth dowel barcylindricalSpecified in the typical formed-hole callout.
22'-0" roadway/profile alignment to bent reference18+63.35 station8°-20'-05.0" skew angle, typical3" dowel-bar hole diameter12" dowel-bar hole depth1 1/2" smooth dowel bar diameter11 1/2" top edge to upper bearing row1'-2" upper bearing row to bent centerline+11 more
p15_r02 plan of bent 3 right beam spacingPlan
- smooth dowel barcircular barCalled out as 1 1/2 in. diameter, typical.
22'-0" dimension81°-20'-05.0" skew angle18+56.65 station81°-20'-05.0" skew angle3" dowel-bar hole diameter12" dowel-bar hole depth1 1/2" smooth dowel bar diameter2'-9 3/8" dimension+13 more
Page 17
bent_4_leftDetail
- smooth dowelcircular hole / dowel locationCallout specifies 1 1/2 in. diameter smooth dowel in formed holes, typical.
44'-1 1/16" overall bent-cap length7'-7 1/16" beam spacing3'-0 7/8" end plan dimension6'-10 1/2" plan dimension7'-7" plan dimension6'-10 9/16" plan dimension3'-0" bent-cap plan width1'-6" bearing dimension+27 more
bent_4_rightPlan
- Smooth dowelscircularCalled out as typical; quantity is not stated.
22'-0" Plan offset dimension81°-20'-05.0" Skew angle19+15.00 Station19+11.65 Station81°-20'-05.0" Skew angle81°-20'-05.0" Skew angle5'-4¾" Plan width dimension3'-0⅞" Plan end dimension+43 more
p17_r02 plan of beam spacing and dowels at bent 4 rightPlan
- Smooth dowelscylindricalSpecified in the formed-hole callout.
22'-0" Distance to ahead reference19+15.00 Station19+11.65 Station81°-20'-05.0" Skew angle81°-20'-05.0" Skew angle, typical5'-4 3/4" Bent end dimension3'-0 7/8" End offset, left7'-7/16" Beam centerline spacing (5 occurrences)+13 more