Matched toProtective Coatingbridge.ancillary_system.protective_coatingon “Protective Coating”
1 read off the drawings · 1 not established
| The class asks for | Value | How | From |
|---|---|---|---|
| Surface AreaA_surfacewants m2 | not establishedThe notes require coating on piles and swaybracing and specify coating extents below ground, but give no pile dimensions, pile lengths, swaybracing geometry, or surface-area quantity from which the coated surface area can be established. | not found | |
| Material TypeMAT | SPECIAL PROTECTIVE COATING NO. 2P -The item is tagged NO. 2P, and the special protective coating note states to clean and paint piles and swaybracing with special protective coating No. 2P. | read | p2 · p02_r03 long list of construction and material general notes |
Worked out by openai/gpt-5.6-terra-pro from the readings below, which are the source. A derived value shows its arithmetic — check it against the drawing before it is priced.
How the sheets named it
NO. 2P
Notes on the sheets that carry it
- p2VIBRATION MONITORING - THE PROJECT ENGINEER SHOULD CONTACT THE GEOTECHNICAL BUREAU OF THE GEORGIA DOT OFFICE OF MATERIALS AND TESTING AT GEOTECHNICAL-SUBMITTAL@DOT.GA.GOV TWO WEEKS PRIOR TO DRIVING PILES. SEE SPECIAL PROVISION 154 - CONSTRUCTION VIBRATION MONITORING.
- p2STEEL H-PILES - USE STEEL FOR H-PILES THAT MEETS THE REQUIREMENTS OF ASTM A 709 GR 50.
- p2PILE LENGTHS - ERRATIC PILE LENGTHS CAN BE EXPECTED.
- p2PILE DRIVING - SHOULD PILES FAIL TO OBTAIN DRIVING RESISTANCE AFTER ACHIEVING THE PILE TIP ELEVATIONS SHOWN, ALLOW PILES TO FREEZE A MINIMUM OF 24 HOURS AND RESTRIKE WITH A WARM HAMMER.
- p2SMOOTH DOWEL BARS - PLACE SMOOTH DOWEL BARS IN FORMED 3” DIAMETER X 12” DEEP HOLES AND GROUT IN PLACE SIMILAR TO ANCHOR BOLTS, SEE SUB-SECTION 501.3.05.B.3 OF THE GEORGIA DOT SPECIFICATIONS. STIRRUPS MAY BE SHIFTED SLIGHTLY TO CLEAR FORMED HOLES.
- p2ABUTMENT SOIL REINFORCING DEVICE INSERTS - INCLUDE THE COST OF FURNISHING AND INSTALLING INSERTS FOR SOIL REINFORCING DEVICES AT ABUTMENT IN THE OVERALL BID SUBMITTED.
- p2FILL SETTLEMENT - PROTECT PILES DRIVEN AT BENTS 1 AND 4 FROM NEGATIVE SKIN FRICTION WHEN USED IN CONJUNCTION WITH MECHANICALLY STABILIZED EARTH WALLS, SEE SECTION 551 OF THE GEORGIA DOT SPECIFICATIONS. DRIVE PILES AT END BENTS BEFORE WALL LEVELING PADS ARE CONSTRUCTED.
- p2STEEL DIAPHRAGMS - AT CONTRACTOR’S OPTION, STEEL DIAPHRAGMS MAY BE USED IN LIEU OF THE CONCRETE DIAPHRAGMS SHOWN IN THE PLANS. AT A MINIMUM, STEEL DIAPHRAGMS ARE TO BE DESIGNED AT STRENGTH LIMIT STATE III WITH A THREE SECOND GUST WIND SPEED OF 140MPH APPLIED TO ONE HALF OF THE VERTICAL SURFACE AREA OF THE EXPOSED BEAM USING EXPOSURE CATEGORY D. CROSS FRAME CONFIGURATIONS SHALL HAVE A HORIZONTAL ANGLE OR CHANNEL AT EITHER THE TOP OR BOTTOM POSITION. STEEL DIAPHRAGMS SHALL BE MANUFACTURED BY A FABRICATOR LISTED ON QPL 60 PER SECTION 501 OR GREATER STEEL. ALL COMPONENTS OF THE STEEL DIAPHRAGM SHALL BE GALVANIZED ACCORDING TO ASTM A 123. CONNECTION BOLTS SHALL CONFORM TO ASTM F3125 (GRADE A325). NUTS SHALL CONFORM TO ASTM A563. WASHERS SHALL CONFORM TO ASTM F436. ALL HARDWARE SHALL BE GALVANIZED ACCORDING TO ASTM A153. STABILITY OF THE BEAMS AND STRUCTURE DURING ALL PHASES OF CONSTRUCTION ARE THE SOLE RESPONSIBILITY OF THE CONTRACTOR. SUBMIT SHOP DRAWINGS AND CALCULATIONS FOR THE STEEL DIAPHRAGMS TO THE ENGINEER FOR REVIEW AND ACCEPTANCE. THE USE OF STEEL DIAPHRAGMS SHALL BE INCLUDED IN THE PRICE BID FOR “LUMP-SUM PREST CONCRETE.”
- p2STANDARD PLAN MODIFICATION - MODIFY THE APPROACH SLAB STANDARD TO INCREASE THE 3/4” EXPANSION JOINT SHOWN BETWEEN THE APPROACH SLAB AND THE BACK FACE PAVING REST AND END POST TO 1 3/8” AT BENT 1 AND 4. KEEP THE EXPANSION JOINT AT END BENT CONTINUOUS AROUND END POST. INCLUDE COST OF JOINT IN APPROACH SLAB PAYMENT. SEE ROADWAY PLANS FOR APPROACH SLAB PAVEMENT.
- p2GROOVED CONCRETE - GROOVE THE ENTIRE LENGTH OF THE BRIDGE TRANSVERSELY AS PER SUB-SECTION 500.3.05.T.9.C. OF THE GEORGIA DOT SPECIFICATIONS. PROVIDE GROOVING BEFORE PLACING TRAFFIC ON DECK.
- p2CHAIN LINK FENCE - CHAIN LINK FENCE SHALL BE PAID FOR AS “LF CH LK FENCE, ZC COAT, 6FT, 9 GA.”
- p2WELDING - ALL WELDING ON GEORGIA DOT PROJECTS SHALL BE PERFORMED BY GDOT CERTIFIED WELDERS THAT HAVE IN THEIR POSSESSION A CURRENT WELDING CERTIFICATION CARD ISSUED BY THE OFFICE OF MATERIALS AND TESTING. USE ONLY E70XX (EXCLUDING E7014 AND E7024) LOW HYDROGEN ELECTRODES FOR MANUAL SHIELDED METAL ARC WELDING.
- p2SPECIAL PROTECTIVE COATING - CLEAN AND PAINT PILES AND SWAYBRACING WITH SPECIAL PROTECTIVE COATING NO. 2P IN ACCORDANCE WITH SECTIONS 520 AND 535 OF THE GEORGIA DOT SPECIFICATIONS. EXTEND COATING FROM TOP OF PILE TO 2FT BELOW GROUND FOR END BENT PILING. EXTEND COATING FROM BOTTOM OF CAP OR PEDESTAL FOOTING TO 5FT BELOW GROUND FOR INTERMEDIATE BENT PILING, REGARDLESS OF ENCASEMENT.
- p2SHOP DRAWING SUBMISSION - SUBMIT SHOP DRAWINGS WITH DEPENDENT INFORMATION AS A SET. SHOP DRAWINGS FOR BEAMS, METAL DECK FORMS AND STEEL DIAPHRAGMS WILL NOT BE REVIEWED UNTIL ALL HAVE BEEN RECEIVED.
- p2INCIDENTAL ITEMS - INCLUDE THE COST INCIDENTAL TO THE WORK THAT IS NOT SPECIFICALLY COVERED BY THE GEORGIA STANDARD SPECIFICATIONS, SUPPLEMENTAL SPECIFICATIONS AND/OR SPECIAL PROVISIONS IN THE OVERALL BID SUBMITTED. THIS INCLUDES THE COST OF WATERPROOFING, JOINT FILLERS AND OTHER INCIDENTAL ITEMS NECESSARY TO COMPLETE THE WORK.
- p2provide table for 2’ above estimated tip elevations
Every crop it was read in — the drawing beside what the model took off it
Page 2
crop
p02_r03 long list of construction and material general notesNotes
- Protective coatingNO. 2PApplied to piles and swaybracing.
154 Special ProvisionTWO WEEKS Submittal period before driving piles24 HOURS Minimum freeze period3” Formed hole diameter12” Formed hole depth1 AND 4 Bent numbers140MPH Wind speedONE HALF Wind exposure+8 more