⚠ No class in the bridge ontology fits this itemAdd a class
The ontology would need a metal deck form or stay-in-place form class.
How the sheets named it
Metal deck forms
Notes on the sheets that carry it
- p2WELDING - ALL WELDING ON GEORGIA DOT PROJECTS SHALL BE PERFORMED BY GDOT CERTIFIED WELDERS THAT HAVE IN THEIR POSSESSION A CURRENT WELDING CERTIFICATION CARD ISSUED BY THE OFFICE OF MATERIALS AND TESTING. USE ONLY E70XX (EXCLUDING E7014 AND E7024) LOW HYDROGEN ELECTRODES FOR MANUAL SHIELDED METAL ARC WELDING.
- p2SPECIAL PROTECTIVE COATING - CLEAN AND PAINT PILES AND SWAYBRACING WITH SPECIAL PROTECTIVE COATING NO. 2P IN ACCORDANCE WITH SECTIONS 520 AND 535 OF THE GEORGIA DOT SPECIFICATIONS. EXTEND COATING FROM TOP OF PILE TO 2FT BELOW GROUND FOR END BENT PILING. EXTEND COATING FROM BOTTOM OF CAP OR PEDESTAL FOOTING TO 5FT BELOW GROUND FOR INTERMEDIATE BENT PILING, REGARDLESS OF ENCASEMENT.
- p2SHOP DRAWING SUBMISSION - SUBMIT SHOP DRAWINGS WITH DEPENDENT INFORMATION AS A SET. SHOP DRAWINGS FOR BEAMS, METAL DECK FORMS AND STEEL DIAPHRAGMS WILL NOT BE REVIEWED UNTIL ALL HAVE BEEN RECEIVED.
- p2INCIDENTAL ITEMS - INCLUDE THE COST INCIDENTAL TO THE WORK THAT IS NOT SPECIFICALLY COVERED BY THE GEORGIA STANDARD SPECIFICATIONS, SUPPLEMENTAL SPECIFICATIONS AND/OR SPECIAL PROVISIONS IN THE OVERALL BID SUBMITTED. THIS INCLUDES THE COST OF WATERPROOFING, JOINT FILLERS AND OTHER INCIDENTAL ITEMS NECESSARY TO COMPLETE THE WORK.
Every crop it was read in — the drawing beside what the model took off it
Page 2
crop
p02_r19 general notes continuedNotes
- Metal deck formsmetalShop drawings are referenced.
2 FT Coating extension below ground for end bent piling5 FT Coating extension below ground for intermediate bent piling
crop
p02_r19Notes
- Metal deck formsmetalShop drawings are required.
2FT FT Coating extension below ground for end bent piling5FT FT Coating extension below ground for intermediate bent piling