| The class asks for | Value | How | From |
|---|---|---|---|
| LengthLwants m/mm | 11'-6" (Bent 2 footings); 13'-0" (Bent 3 footings); 44'-1 1/16" (Bent 4 Right footing) ft-in (as drawn)The drawings establish different footing types rather than one common footing length. Bent 2 is shown as 11'-6" overall, Bent 3 as 13'-0" overall, and the distinct continuous Bent 4 Right footing as 44'-1 1/16" overall. | read | p16 · p16_r10 plan view of pile footing for bent 2 with pile layoutp16 · p16_r08 plan of pile footing layout for bent 3p17 · bent_4_right |
| WidthWwants m/mm | 11'-6" (Bent 2 footings); 13'-0" (Bent 3 footings); 5'-4¾" (Bent 4 Right footing) ft-in (as drawn)Bent 2 and Bent 3 footings are square in plan, so their stated overall plan dimensions establish both length and width. The Bent 4 Right plan explicitly states a footing plan width of 5'-4¾". | read | p16 · p16_r10 plan view of pile footing for bent 2 with pile layoutp16 · p16_r08 plan of pile footing layout for bent 3p17 · bent_4_right |
| ThicknessTwants m/mm | 4'-0" TYP. (Bent 2 and Bent 3 footings) ft-in (as drawn)The footing depth/thickness is directly labelled 4'-0" TYP. for Bent 2 and 4'-0" for Bent 3. No single thickness is stated for the separately configured Bent 4 Right footing. | read | p14 · bent_2_leftp15 · bent_3_leftp15 · p15_r04 elevation of bent 3 left columns and footing |
| Instance CountNwants count | 9 identified footings count2 footings at Bent 2 Left + 2 footings at Bent 2 Right + 2 footings at Bent 3 Left + 2 footings at Bent 3 Right + 1 footing at Bent 4 Right = 9 footings.Each Bent 2 and Bent 3 left/right elevation explicitly shows two separate footings, and the Bent 4 Right detail explicitly shows one continuous footing. This is the count established by the provided footing readings; a complete project-wide footing total, including any unshown bent configurations, is not established. | derived | p14 · bent_2_leftp14 · bent_2_rightp15 · bent_3_leftp15 · bent_3_rightp17 · bent_4_right |
| Concrete Gradefck | not establishedNo footing concrete strength class, concrete grade, or fck value is stated in the provided readings. | not found | |
| Top LevelTOLwants m | EL. 155.00 (derived for typical Bent 2 and Bent 3 footings); EL. 186.04, EL. 185.93, EL. 185.80, EL. 185.67, EL. 185.53, and EL. 185.37 (Bent 4 Right footing top) elevation (as drawn)Typical Bent 2/Bent 3 footing top level: bottom of footing EL. 151.00 + footing thickness 4'-0" = EL. 155.00. Bent 4 Right footing-top elevations are stated directly at the successive footing locations.EL. 151.00 is identified as the typical footing bottom elevation for Bent 3 and as the typical footing elevation in the Bent 2/3 footing details; combined with the unambiguous 4'-0" footing thickness it establishes EL. 155.00 as the typical top level. Bent 4 Right is a separate sloping/variable-level footing and its top elevations are explicitly labelled. | derived | p14 · bent_2_leftp15 · bent_3_leftp15 · p15_r04 elevation of bent 3 left columns and footingp17 · bent_4_right |
Worked out by openai/gpt-5.6-terra-pro from the readings below, which are the source. A derived value shows its arithmetic — check it against the drawing before it is priced.
How the sheets named it
Every dimension read for it79
- 2021 EDITIONGeorgia Standard Specifications editionnot attributedp2 · p02_r11 left column list of specification and construction notes
- 2024Supplemental specifications yearnot attributedp2 · p02_r11 left column list of specification and construction notes
- 2021Georgia Standard Specifications editionnot attributedp2 · p02_r11
- 2024Supplemental specifications yearnot attributedp2 · p02_r11
- 2'-0"Additional plan footing dimension allowancep2 · p02_r20
- 3" CL., TYP.concrete coverp14 · bent_2_left
- 4'-0" TYP.footing depthp14 · bent_2_left
- 11'-6" SQUARE TYP.footing plan widthp14 · bent_2_left
- 4'-0" TYP.column/footing plan dimensionsp14 · bent_2_left
- 3'-6" TYP.column/footing plan dimensionsp14 · bent_2_left
- EL. 151.00, TYP.footing elevationp14 · bent_2_left
- 1'-9"footing dimensionp14 · bent_2_left
- EL. 151.00, TYP.typical elevationp14 · bent_2_right
- 4" TYP.dimensionp14 · p14_r03 elevation of bent columns and footing left
- 3" CL., TYP.dimensionp14 · p14_r03 elevation of bent columns and footing left
- EL. 151.00, TYP.elevationp14 · p14_r03 elevation of bent columns and footing left
- EL. 151.00, TYP.elevation, typicalp14 · p14_r04 elevation of bent columns and footing right
- 4"Coverp15 · bent_3_left
- 3" CL.Clear coverp15 · bent_3_left
- EL. 151.00, TYP.Footing bottom elevationp15 · bent_3_left
- 13'-0" SQUAREFooting widthp15 · bent_3_left
- 4'-0"Footing depthp15 · bent_3_left
- 15°Anglenot attributedp15 · bent_3_left
- EL. 151.00typical footing elevationp15 · bent_3_right
- EL. 151.00, TYP.Elevationp15 · p15_r03 elevation of bent 3 right columns and footing
- 4'-8"Vertical dimensionp15 · p15_r04 elevation of bent 3 left columns and footing
- 1'-9"Vertical dimensionp15 · p15_r04 elevation of bent 3 left columns and footing
- 4", TYP.Cover dimensionp15 · p15_r04 elevation of bent 3 left columns and footing
- 3" CL., TYP.Cover dimensionp15 · p15_r04 elevation of bent 3 left columns and footing
- 4'-0" TYP.Vertical dimensionp15 · p15_r04 elevation of bent 3 left columns and footing
- 1'-0" TYP.Vertical dimensionp15 · p15_r04 elevation of bent 3 left columns and footing
- 13'-0" SQUARE TYP.Horizontal dimensionp15 · p15_r04 elevation of bent 3 left columns and footing
- EL. 151.00, TYP.Elevationp15 · p15_r04 elevation of bent 3 left columns and footing
- 13'-0"overall footing plan dimensionp16 · bent_3
- 13'-0"overall footing plan dimensionp16 · bent_3
- 13'-0"overall footing widthp16 · p16_r08 plan of pile footing layout for bent 3
- 1'-3"horizontal edge distancep16 · p16_r08 plan of pile footing layout for bent 3
- 1'-3"horizontal edge distancep16 · p16_r08 plan of pile footing layout for bent 3
- 13'-0"overall footing lengthp16 · p16_r08 plan of pile footing layout for bent 3
- 1'-3"vertical edge distancep16 · p16_r08 plan of pile footing layout for bent 3
- 1'-3"vertical edge distancep16 · p16_r08 plan of pile footing layout for bent 3
- 3/8" = 1'-0"scalenot attributedp16 · p16_r08 plan of pile footing layout for bent 3
- 11'-6"overall footing widthp16 · p16_r10 plan view of pile footing for bent 2 with pile layout
- 11'-6"overall footing lengthp16 · p16_r10 plan view of pile footing for bent 2 with pile layout
- 3/8" = 1'-0"scalenot attributedp16 · p16_r10 plan view of pile footing for bent 2 with pile layout
- 11'-6"overall footing widthp16 · p16_r10
- 1'-3"footing width segmentp16 · p16_r10
- 4'-6"footing width segmentp16 · p16_r10
- 4'-6"footing width segmentp16 · p16_r10
- 1'-3"footing width segmentp16 · p16_r10
- 11'-6"overall footing lengthp16 · p16_r10
- 1'-3"footing length segmentp16 · p16_r10
- 4'-6"footing length segmentp16 · p16_r10
- 4'-6"footing length segmentp16 · p16_r10
- 1'-3"footing length segmentp16 · p16_r10
- 22'-0"Plan offset dimensionnot attributedp17 · bent_4_right
- 5'-4¾"Plan width dimensionp17 · bent_4_right
- 7'-7/16"Plan bay spacingp17 · bent_4_right
- 7'-7/16"Plan bay spacingp17 · bent_4_right
- 7'-7/16"Plan bay spacingp17 · bent_4_right
- 7'-7/16"Plan bay spacingp17 · bent_4_right
- 7'-7/16"Plan bay spacingp17 · bent_4_right
- 7'-7"Plan spacingp17 · bent_4_right
- 7'-7"Plan spacingp17 · bent_4_right
- 7'-7"Plan spacingp17 · bent_4_right
- 7'-7"Plan spacingp17 · bent_4_right
- 44'-1 1/16"Overall plan lengthp17 · bent_4_right
- 1'-6"Plan dimensionp17 · bent_4_right
- 3'-0"Plan dimensionp17 · bent_4_right
- 1'-6"Plan dimensionp17 · bent_4_right
- 3'-0 1/16"Plan end dimensionp17 · bent_4_right
- 2¾"Typical dimensionp17 · bent_4_right
- 2'-10⅛"Elevation left end segmentp17 · bent_4_right
- 7'-7/16"Elevation bay spacingp17 · bent_4_right
- 7'-7/16"Elevation bay spacingp17 · bent_4_right
- 7'-7/16"Elevation bay spacingp17 · bent_4_right
- 7'-7/16"Elevation bay spacingp17 · bent_4_right
- 3'-3⅝"Elevation right end segmentp17 · bent_4_right
- 44'-1/16"Overall elevation lengthp17 · bent_4_right
Notes on the sheets that carry it
- p1CHAIN LINK WIRE FENCE, TYP.
- p1FRONT FACE OF WALL NO. 1
- p1FRONT FACE OF WALL NO. 2
- p1APPROXIMATE EXISTING GROUNDLINE
- p1NOTES — partial note block visible at right edge; text is cut off and illegible in part.
- p2SPECIFICATIONS - GEORGIA STANDARD SPECIFICATIONS, 2021 EDITION, AND 2024 SUPPLEMENTAL SPECIFICATIONS AS MODIFIED BY CONTRACT DOCUMENTS.
- p2REINFORCING STEEL - PLACE AND TIE ALL REINFORCING STEEL IN ACCORDANCE WITH THE GEORGIA DOT SPECIFICATIONS. DO NOT WELD REINFORCING STEEL. MAINTAIN 2 INCH MINIMUM CLEARANCE ON ALL REINFORCEMENT UNLESS OTHERWISE NOTED.
- p2CHAMFER - CHAMFER ALL EXPOSED CONCRETE EDGES 3/4" UNLESS OTHERWISE NOTED.
- p2RAILROAD SIDE DITCHES - PRIOR TO THE BEGINNING OF CONSTRUCTION, CLEAN THE RAILROAD SIDE DITCHES IN THE CONSTRUCTION AREA IN SUCH A MANNER AS TO PROVIDE POSITIVE DRAINAGE. MAINTAIN THE RAILROAD SIDE DITCHES FREE OF SILT AND DEBRIS UNTIL FINAL ACCEPTANCE. SEE ROADWAY PLANS FOR EROSION CONTROL AND PAYMENT.
- p2PROTECTIVE PLATFORMS - PROVIDE PROTECTIVE PLATFORMS AT THIS SITE, SEE SECTION 510 OF THE GEORGIA DOT SPECIFICATIONS. MAINTAIN A MINIMUM VERTICAL CLEARANCE AS DEFINED IN THE CONSTRUCTION CLEARANCE DIAGRAM.
- p2TEMPORARY SHORING - INCLUDE THE COST OF TEMPORARY SHORING AS NECESSARY FOR BRIDGE CONSTRUCTION IN THE OVERALL BID SUBMITTED.
- p2WAITING PERIOD - NONE REQUIRED.
- p2FOUNDATION BACKFILL MATERIAL - PLACE 1'-0" OF TYPE II FOUNDATION BACKFILL MATERIAL UNDER EACH FOOTING AT BENTS 2, AND. THE QUANTITY IS BASED ON THE PLAN FOOTING DIMENSIONS PLUS 2'-0" . USE OF THIS MATERIAL MAY BE ELIMINATED BY THE ENGINEER IF THE FOOTING AREA IS DRY.
- p2PLAN DRIVING OBJECTIVE - SEE SUBSTRUCTURE DETAILS.
- p2DRIVING RESISTANCE - DETERMINE DRIVING RESISTANCE FOR PILES USING DYNAMIC PILE TESTING IN ACCORDANCE WITH SUB-SECTION 520.3.05.D.2 OF THE GEORGIA DOT SPECIFICATIONS. DYNAMIC PILE TESTING SHALL BE REQUIRED AT BRIDGE LEFT BENT 1 RIGHT, BRIDGE LEFT BENT 3 LEFT, BRIDGE RIGHT BENT 2 RIGHT AND BRIDGE RIGHT BENT 4 RIGHT.
- p2DYNAMIC PILE TESTING - PERFORM PILE TESTING USING THE PILE DRIVING ANALYZER (PDA) IN ACCORDANCE WITH SPECIAL PROVISION SECTION 523. NOTIFY THE GEOTECHNICAL BUREAU OF THE GEORGIA DOT OFFICE OF MATERIALS AND TESTING AT GEOTECHNICAL_SUBMITTALS@DOT.GA.GOV TWO WEEKS PRIOR TO DRIVING PILES. SUBMIT ALL FILES REQUIRED BY SPECIAL PROVISION TO THE EMAIL ABOVE FOR REVIEW AND APPROVAL.
- p2WAVE EQUATION - PERFORM WAVE EQUATION ANALYSIS (WEAP) IN ACCORDANCE WITH SUB-SECTION 520.3.05.D.2 OF THE GEORGIA DOT SPECIFICATION. PROVIDE RESULTS OF THE WEAP TO THE GEOTECHNICAL BUREAU OF THE GEORGIA DOT OFFICE OF MATERIALS AND TESTING AT GEOTECHNICAL_SUBMITTALS@DOT.GA.GOV FOR REVIEW AND APPROVAL TWO WEEKS PRIOR TO DRIVING PILES.
- p2WELDING - ALL WELDING ON GEORGIA DOT PROJECTS SHALL BE PERFORMED BY GDOT CERTIFIED WELDERS THAT HAVE IN THEIR POSSESSION A CURRENT WELDING CERTIFICATION CARD ISSUED BY THE OFFICE OF MATERIALS AND TESTING. USE ONLY E70XX (EXCLUDING E7014 AND E7024) LOW HYDROGEN ELECTRODES FOR MANUAL SHIELDED METAL ARC WELDING.
- p2SPECIAL PROTECTIVE COATING - CLEAN AND PAINT PILES AND SWAYBRACING WITH SPECIAL PROTECTIVE COATING NO. 2P IN ACCORDANCE WITH SECTIONS 520 AND 535 OF THE GEORGIA DOT SPECIFICATIONS. EXTEND COATING FROM TOP OF PILE TO 2FT BELOW GROUND FOR END BENT PILING. EXTEND COATING FROM BOTTOM OF CAP OR PEDESTAL FOOTING TO 5FT BELOW GROUND FOR INTERMEDIATE BENT PILING, REGARDLESS OF ENCASEMENT.
- p2SHOP DRAWING SUBMISSION - SUBMIT SHOP DRAWINGS WITH DEPENDENT INFORMATION AS A SET. SHOP DRAWINGS FOR BEAMS, METAL DECK FORMS AND STEEL DIAPHRAGMS WILL NOT BE REVIEWED UNTIL ALL HAVE BEEN RECEIVED.
- p2INCIDENTAL ITEMS - INCLUDE THE COST INCIDENTAL TO THE WORK THAT IS NOT SPECIFICALLY COVERED BY THE GEORGIA STANDARD SPECIFICATIONS, SUPPLEMENTAL SPECIFICATIONS AND/OR SPECIAL PROVISIONS IN THE OVERALL BID SUBMITTED. THIS INCLUDES THE COST OF WATERPROOFING, JOINT FILLERS AND OTHER INCIDENTAL ITEMS NECESSARY TO COMPLETE THE WORK.
- p2FOUNDATION BACKFILL MATERIAL - PLACE 1’-0” OF TYPE II FOUNDATION BACKFILL MATERIAL UNDER EACH FOOTING AT BENTS 2, AND 3. THE QUANTITY IS BASED ON THE PLAN FOOTING DIMENSIONS PLUS 2’-0”. USE OF THIS MATERIAL MAY BE ELIMINATED BY THE ENGINEER IF THE FOOTING AREA IS DRY.
- p14FORM 3" DIA. X 12" DEEP HOLE FOR 1 1/2" DIA. SMOOTH DOWEL BAR, TYP.
- p14MECHANICAL COUPLER, TYP. SEE SPECIAL PROVISION 511
- p14* REQUIRED CONSTRUCTION JOINT. AT CONTRACTOR'S OPTION, CONSTRUCTION JOINT MAY BE RELOCATED TO TOP OF FOOTING.
- p141. SEE BRIDGE ... COLUMN AN...
- p142. BARS 422
- p143. EXTEND BA...
- p14SEE BRIDGE SHEET NO. 16 FOR CAP, COLUMN AND FOOTING SECTIONS.
- p14BARS #22 NOT SHOWN.
- p14EXTEND BARS #21A 3’-6” INTO CAP.
- p14PILES ARE DESIGNED FOR A MAXIMUM FACTORED AXIAL LOAD OF 237 KIPS.
- p14ALL PILES SHALL BE STEEL H, HP 12 X 53.
- p14* CONST. JT., TYP.
- p141. SEE BRIDGE SHEET NO.16 FOR CAP, COLUMN AND FOOTING SECTIONS.
- p142. BARS 422 NOT SHOWN.
- p143. EXTEND BARS 1121A 3'-6" INTO CAP.
- p15…E BRIDGE SHEET NO.16 FOR CAP, COLUMN AND FOOTING SECTIONS. [partial at left crop edge]
- p15…RS 432 NOT SHOWN. [partial at left crop edge]
- p15…TEND BARS 1131A 3'-9” INTO CAP. [partial at left crop edge]
Every crop it was read in — the drawing beside what the model took off it
Page 1
bridge_1Elevation
- pile-supported footing×2rectangularOne beneath each visible bent; individual piles are shown but not tagged.
192'-0" *** Total length of bridge55'-0" *** Span length82'-0" *** Span length55'-0" *** Span length151.00 Elevation
Page 2
p02_r11 left column list of specification and construction notesNotes
- foundation backfill materialBENTS 2Type II foundation backfill materialPlace under each footing at Bents 2; use may be eliminated by the Engineer if the footing area is dry.
- footingsBENTS 2Foundation backfill material is specified under each footing.
2021 EDITION Georgia Standard Specifications edition2024 Supplemental specifications year2 INCH Minimum reinforcement clearance3/4" Chamfer size1'-0" Foundation backfill thickness2'-0" Foundation footing plan-dimension additionTWO WEEKS Notification/submittal period before driving piles
p02_r19 general notes continuedNotes
- Pedestal footingReferenced as the upper limit for intermediate bent piling coating.
2 FT Coating extension below ground for end bent piling5 FT Coating extension below ground for intermediate bent piling
p02_r20 general notesNotes
- footingReferenced in foundation backfill note.
1'-0" Foundation backfill thickness2'-0" Plan footing dimensions allowance
p02_r11Notes
- footingsBENTS 2 AND 3Foundation backfill material is specified beneath each footing.
2021 Georgia Standard Specifications edition2024 Supplemental specifications year2 INCH minimum reinforcement clearance3/4” concrete edge chamfer1’-0” foundation backfill thickness2’-0” foundation backfill plan footing dimension addition510 Georgia DOT Specifications section520.3.05.D.2 Georgia DOT Specifications sub-section+4 more
p02_r20Notes
- FootingsReferenced in foundation backfill note.
1'-0" Foundation backfill depth2'-0" Additional plan footing dimension allowance
Page 14
bent_2_leftElevation
- footing×2rectangularOne below each column; footing plan/profile at right is marked typical.
42'-6" cap plan overall length2'-3 3/8" cap plan end dimension, left2'-3 5/16" cap plan end dimension, right6'-0" beam centerline end spacing7'-7 1/2" beam centerline spacing7'-7/16" bearing spacing8'-20'-05.0" typical cap plan dimension2'-9 3/8" dimension at STA. 17+81.35+58 more
bent_2_rightElevation
- footing×2rectangularOne footing is shown beneath each visible column.
81°-20'-05.0” skew angle22’-0” dimension17+74.65 station81°-20’-05.0” skew angle3” formed hole diameter12” formed hole depth1 1/2” smooth dowel bar diameter11 1/2” cap vertical dimension+50 more
p14_r03 elevation of bent columns and footing leftElevation
- footing×2rectangularreinforced concreteOne detailed beneath Column 1 and one typical beneath Column 2.
44-421 AT EQ. SPS. reinforcement quantity and spacingEL. 185.78 (BK) elevationEL. 185.23 (AH) elevationEL. 185.96 (BK) elevationEL. 185.41 (AH) elevationEL. 186.10 (BK) elevationEL. 185.55 (AH) elevationEL. 186.24 (BK) elevation+54 more
p14_r04 elevation of bent columns and footing rightElevation
- footing×2rectangularreinforced concreteOne footing is shown below each column.
44-#21 AT EQ. SPS. cap reinforcement spacingEL. 186.42 elevation, BKEL. 185.84 elevation, AHEL. 186.29 elevation, BKEL. 185.75 elevation, AHEL. 186.12 elevation, BKEL. 185.58 elevation, AHEL. 185.94 elevation, BK+30 more
p14_r05 general construction notes for bent 2Notes
- footingReferenced for sections.
3'-6" Bar extension into cap
Page 15
bent_3_leftElevation
- footing×2rectangular, 13'-0" square typicalOne footing is detailed below Column 1 and a typical footing is shown below Column 2.
81°-20'-05.0" Angle81°-20'-05.0" Angle22'-0" Offset from SR 21 WB = PGLSTA. 18+63.35 Station3" Dowel hole diameter12" Dowel hole depth1 1/2" Smooth dowel bar diameter11 1/2" Bent plan width segment+54 more
bent_3_rightElevation
- footing×2rectangularreinforced concreteOne footing is shown below each column.
81°-20'-05.0” skew/alignment angle22'-0” dimensionSTA. 18+56.65 station42'-6” overall bent-cap plan length2'-3 5/16” end spacing7'-7 1/16” beam spacing6'-0” end spacing7'-7 1/2” beam spacing+58 more
p15_r03 elevation of bent 3 right columns and footingElevation
- Footing×2rectangularOne footing beneath each visible column.
42'-6" Beam spacing/overall dimension44-431 AT EQ. SPS. Cap reinforcement spacingEL. 186.60 (AH) ElevationEL. 186.04 (BK) ElevationEL. 186.49 (AH) ElevationEL. 185.94 (BK) ElevationEL. 186.35 (AH) ElevationEL. 185.79 (BK) Elevation+41 more
p15_r04 elevation of bent 3 left columns and footingElevation
- Footing×2rectangularLeft footing is detailed; right footing is shown typical.
44-431 AT EQ. SPS. Reinforcement spacingEL. 185.79 (AH) ElevationEL. 185.24 (BK) ElevationEL. 185.98 (AH) ElevationEL. 185.44 (BK) ElevationEL. 186.14 (AH) ElevationEL. 185.60 (BK) ElevationEL. 186.30 (AH) Elevation+63 more
Page 16
bent_3Plan
- footing×1rectangularPlan footprint shown for Bent 3.
13'-0" overall footing plan dimension1'-3" end offset / pile spacing5'-3" pile spacing5'-3" pile spacing1'-3" end offset / pile spacing13'-0" overall footing plan dimension1'-3" end offset / pile spacing5'-3" pile spacing+3 more
p16_r08 plan of pile footing layout for bent 3Plan
- footing×1rectangularOverall plan dimensions shown as 13'-0" by 13'-0".
13'-0" overall footing width1'-3" horizontal edge distance5'-3" horizontal pile spacing5'-3" horizontal pile spacing1'-3" horizontal edge distance13'-0" overall footing length1'-3" vertical edge distance5'-3" vertical pile spacing+3 more
p16_r09 plan view of pile footing for bent 3 with pile layoutPlan
- footingBENT 3×1rectangularOverall footing plan outline shown.
13'-0" overall horizontal footing dimension1'-3" horizontal end offset5'-3" horizontal pile spacing5'-3" horizontal pile spacing1'-3" horizontal end offset13'-0" overall vertical footing dimension1'-3" vertical end offset5'-3" vertical pile spacing+3 more
p16_r10 plan view of pile footing for bent 2 with pile layoutPlan
- footing×1rectangularOverall plan dimensions shown as 11'-6" by 11'-6".
11'-6" overall footing width1'-3" pile layout spacing4'-6" pile layout spacing4'-6" pile layout spacing1'-3" pile layout spacing11'-6" overall footing length1'-3" pile layout spacing4'-6" pile layout spacing+3 more
p16_r10Plan
- footing×1rectangularOutlined rectangular footing shown in footing plan.
11'-6" overall footing width1'-3" footing width segment4'-6" footing width segment4'-6" footing width segment1'-3" footing width segment11'-6" overall footing length1'-3" footing length segment4'-6" footing length segment+3 more
Page 17
bent_4_rightPlan
- Footing×1rectangular, tapered/sloped in elevationShown in plan and elevation for Bent 4 Right.
22'-0" Plan offset dimension81°-20'-05.0" Skew angle19+15.00 Station19+11.65 Station81°-20'-05.0" Skew angle81°-20'-05.0" Skew angle5'-4¾" Plan width dimension3'-0⅞" Plan end dimension+43 more
Page 18
p18_r04Elevation
- footing×1rectangular
p18_r02 plan of bent3 left footing pile gridsPlan
- footingFOOTING 1×1skewed rectangularShown with six pile symbols numbered 1 through 6.
- footingFOOTING 2×1skewed rectangularShown with six pile symbols numbered 7 through 12.
p18_r04 elevation showing footing bottom elevation detailElevation
- footing×1rectangularLarge rectangular footing shown in elevation.
p18_r05 bent 2 leftPlan
- footingFOOTING 1×1rectangularShown with six H-shaped pile symbols numbered 1 through 6.
- footingFOOTING 2×1rectangularShown with six H-shaped pile symbols numbered 7 through 12.
p18_r06 plan of bent 3 left beams and footings 1 2Plan
- footingFOOTING 1×1rectangularShown skewed in plan.
- footingFOOTING 2×1rectangularShown skewed in plan.
p18_r07 plan of bent 2 left beams and footings 1 2Plan
- footingFOOTING 1×1rectangularContains six H-section pile symbols numbered 1 through 6.
- footingFOOTING 2×1rectangularContains six H-section pile symbols numbered 7 through 12.
p18_r11 pile tip and footing elevation schedule bent3Table
- footingFOOTING 3×1Associated with pile numbers 1 through 6.
- footingFOOTING 4×1Associated with pile numbers 7 through 12.
p18_r13 bent 2 rightPlan
- FootingFOOTING 3×1rectangularShown as a slightly skewed rectangle containing six H-section symbols.
- FootingFOOTING 4×1rectangularShown as a slightly skewed rectangle containing six H-section symbols.
p18_r16 plan of bent 3 right beams and footings 3 4Plan
- footingFOOTING 3×1skewed rectangularOutlined footing with six H-shaped pile symbols at numbered locations 1 through 6.
- footingFOOTING 4×1skewed rectangularOutlined footing with six H-shaped pile symbols at numbered locations 7 through 12.
p18_r17 plan of bent 2 right beams and footings 3 4Plan
- FootingFOOTING 3×1rectangularShown skewed in plan with six H-section items within it.
- FootingFOOTING 4×1rectangularShown skewed in plan with six H-section items within it.
p18_r19 pile tip and footing elevation schedule tablesTable
- footingsFOOTING 1 and FOOTING 2×2Shown for 2 LEFT.
- footingsFOOTING 3 and FOOTING 4×2Shown for 2 RIGHT.
- footingsFOOTING 1 and FOOTING 2×2Shown for 3 LEFT.
p18_r11Table
- footingFOOTING 3×1Pile location for Pile Nos. 1 through 6.
- footingFOOTING 4×1Pile location for Pile Nos. 7 through 12.
p18_r19Schedule
- FootingFOOTING 1Listed as a pile location in the visible schedules.
- FootingFOOTING 2Listed as a pile location in the visible schedules.
- FootingFOOTING 3Listed as a pile location in the visible schedule.
- FootingFOOTING 4Listed as a pile location in the visible schedule.