Matched toDiaphragmbridge.superstructure.secondary_member_system.diaphragmon “Diaphragm”
| The class asks for | Value | How | From |
|---|---|---|---|
| LengthLwants m/mm | Spans 1 and 3: 711.2 mm (2'-4"); Span 2: 914.4 mm (3'-0") mmSpans 1 and 3: 2'-4" = 28"; 28 × 25.4 mm/in. = 711.2 mm. Span 2: 3'-0" = 36"; 36 × 25.4 mm/in. = 914.4 mm.The Spans 1 and 3 diaphragm section explicitly assigns the 2'-4" vertical dimension to the concrete diaphragm. The Span 2 diaphragm detail shows a 3'-0" vertical dimension in the diaphragm section; its owner is not explicitly stated, but it is on the concrete-diaphragm detail and is treated as the diaphragm dimension. | derivedcheck | p7 · p07_r08p9 · p09_r03 |
| Cross-sectional AreaAwants m2/mm2 | Spans 1 and 3: 180644.8 mm2; Span 2: 232257.6 mm2 mm2Spans 1 and 3: 10" × 2'-4" = 10" × 28" = 280 in2; 280 × 645.16 mm2/in2 = 180644.8 mm2. Span 2: 10" × 3'-0" = 10" × 36" = 360 in2; 360 × 645.16 mm2/in2 = 232257.6 mm2.The diaphragm is shown as rectangular. Its 10" thickness is explicitly stated in both sections; the corresponding vertical dimensions are 2'-4" for Spans 1 and 3 and 3'-0" for Span 2. The Span 2 vertical dimension has no explicit owner within the diaphragm detail. | derivedcheck | p7 · p07_r08p9 · p09_r03 |
| Instance CountNwants count | not establishedThe readings do not establish a single reliable project-wide diaphragm count. Span 1 plan readings report both 4 and 2 concrete diaphragms, while the Span 2 reading reports 2; no complete beam-sheet diaphragm-location layout is provided to resolve the discrepancy or establish the total. | not found | |
| Material TypeMAT | concreteThe item is explicitly identified as a concrete diaphragm in the section details. | read | p7 · p07_r08p9 · p09_r03 |
| MassMwants kg/t | not establishedNo diaphragm mass, concrete quantity, density, or complete diaphragm volume is established by the readings. | not found |
Worked out by openai/gpt-5.6-terra-pro from the readings below, which are the source. A derived value shows its arithmetic — check it against the drawing before it is priced.
How the sheets named it
Every dimension read for it21
- 10"concrete diaphragmp4 · p04_r02 deck plan of span 1 with beams and dimensions
- 1”Expansion joint widthnot attributedp4 · p04_r06 notes of general notes
- 1”Expansion joint widthnot attributedp4 · p04_r06 notes of general notes
- 1'-0"offsetnot attributedp4 · span_1
- 8"filletnot attributedp4 · span_1
- 81°-20'-05.0"bearing anglenot attributedp4 · span_1
- 10"concrete diaphragm thicknessp4 · span_1
- 5'-0"dimension at marked locationsnot attributedp4 · span_1
- 10"concrete diaphragm thicknessp5 · p05_r01 deck plan
- 10”Concrete diaphragm thicknessp5 · span_2
- 10"concrete diaphragmp6 · p06_r01
- 10"concrete diaphragm thicknessp6 · p06_r01 deck plan span 3
- 10"concrete diaphragm widthp7 · p07_r08
- 2"vertical dimensionnot attributedp7 · p07_r08
- 2'-4"vertical dimensionp7 · p07_r08
- 10concrete diaphragm thicknessp7 · p07_r09
- 10"concrete diaphragm thicknessp7 · p07_r08 section thru diaphragm spans 1 and 3
- 2"dimensionnot attributedp7 · p07_r08 section thru diaphragm spans 1 and 3
- 2'-4"vertical dimensionnot attributedp7 · p07_r08 section thru diaphragm spans 1 and 3
- 10”concrete diaphragm thicknessp9 · p09_r03
- 10"concrete diaphragm thicknessp9 · p09_r03 detail a
Notes on the sheets that carry it
- p2VIBRATION MONITORING - THE PROJECT ENGINEER SHOULD CONTACT THE GEOTECHNICAL BUREAU OF THE GEORGIA DOT OFFICE OF MATERIALS AND TESTING AT GEOTECHNICAL-SUBMITTAL@DOT.GA.GOV TWO WEEKS PRIOR TO DRIVING PILES. SEE SPECIAL PROVISION 154 - CONSTRUCTION VIBRATION MONITORING.
- p2STEEL H-PILES - USE STEEL FOR H-PILES THAT MEETS THE REQUIREMENTS OF ASTM A 709 GR 50.
- p2PILE LENGTHS - ERRATIC PILE LENGTHS CAN BE EXPECTED.
- p2PILE DRIVING - SHOULD PILES FAIL TO OBTAIN DRIVING RESISTANCE AFTER ACHIEVING THE PILE TIP ELEVATIONS SHOWN, ALLOW PILES TO FREEZE A MINIMUM OF 24 HOURS AND RESTRIKE WITH A WARM HAMMER.
- p2SMOOTH DOWEL BARS - PLACE SMOOTH DOWEL BARS IN FORMED 3” DIAMETER X 12” DEEP HOLES AND GROUT IN PLACE SIMILAR TO ANCHOR BOLTS, SEE SUB-SECTION 501.3.05.B.3 OF THE GEORGIA DOT SPECIFICATIONS. STIRRUPS MAY BE SHIFTED SLIGHTLY TO CLEAR FORMED HOLES.
- p2ABUTMENT SOIL REINFORCING DEVICE INSERTS - INCLUDE THE COST OF FURNISHING AND INSTALLING INSERTS FOR SOIL REINFORCING DEVICES AT ABUTMENT IN THE OVERALL BID SUBMITTED.
- p2FILL SETTLEMENT - PROTECT PILES DRIVEN AT BENTS 1 AND 4 FROM NEGATIVE SKIN FRICTION WHEN USED IN CONJUNCTION WITH MECHANICALLY STABILIZED EARTH WALLS, SEE SECTION 551 OF THE GEORGIA DOT SPECIFICATIONS. DRIVE PILES AT END BENTS BEFORE WALL LEVELING PADS ARE CONSTRUCTED.
- p2STEEL DIAPHRAGMS - AT CONTRACTOR’S OPTION, STEEL DIAPHRAGMS MAY BE USED IN LIEU OF THE CONCRETE DIAPHRAGMS SHOWN IN THE PLANS. AT A MINIMUM, STEEL DIAPHRAGMS ARE TO BE DESIGNED AT STRENGTH LIMIT STATE III WITH A THREE SECOND GUST WIND SPEED OF 140MPH APPLIED TO ONE HALF OF THE VERTICAL SURFACE AREA OF THE EXPOSED BEAM USING EXPOSURE CATEGORY D. CROSS FRAME CONFIGURATIONS SHALL HAVE A HORIZONTAL ANGLE OR CHANNEL AT EITHER THE TOP OR BOTTOM POSITION. STEEL DIAPHRAGMS SHALL BE MANUFACTURED BY A FABRICATOR LISTED ON QPL 60 PER SECTION 501 OR GREATER STEEL. ALL COMPONENTS OF THE STEEL DIAPHRAGM SHALL BE GALVANIZED ACCORDING TO ASTM A 123. CONNECTION BOLTS SHALL CONFORM TO ASTM F3125 (GRADE A325). NUTS SHALL CONFORM TO ASTM A563. WASHERS SHALL CONFORM TO ASTM F436. ALL HARDWARE SHALL BE GALVANIZED ACCORDING TO ASTM A153. STABILITY OF THE BEAMS AND STRUCTURE DURING ALL PHASES OF CONSTRUCTION ARE THE SOLE RESPONSIBILITY OF THE CONTRACTOR. SUBMIT SHOP DRAWINGS AND CALCULATIONS FOR THE STEEL DIAPHRAGMS TO THE ENGINEER FOR REVIEW AND ACCEPTANCE. THE USE OF STEEL DIAPHRAGMS SHALL BE INCLUDED IN THE PRICE BID FOR “LUMP-SUM PREST CONCRETE.”
- p2STANDARD PLAN MODIFICATION - MODIFY THE APPROACH SLAB STANDARD TO INCREASE THE 3/4” EXPANSION JOINT SHOWN BETWEEN THE APPROACH SLAB AND THE BACK FACE PAVING REST AND END POST TO 1 3/8” AT BENT 1 AND 4. KEEP THE EXPANSION JOINT AT END BENT CONTINUOUS AROUND END POST. INCLUDE COST OF JOINT IN APPROACH SLAB PAYMENT. SEE ROADWAY PLANS FOR APPROACH SLAB PAVEMENT.
- p2GROOVED CONCRETE - GROOVE THE ENTIRE LENGTH OF THE BRIDGE TRANSVERSELY AS PER SUB-SECTION 500.3.05.T.9.C. OF THE GEORGIA DOT SPECIFICATIONS. PROVIDE GROOVING BEFORE PLACING TRAFFIC ON DECK.
- p2CHAIN LINK FENCE - CHAIN LINK FENCE SHALL BE PAID FOR AS “LF CH LK FENCE, ZC COAT, 6FT, 9 GA.”
- p2WELDING - ALL WELDING ON GEORGIA DOT PROJECTS SHALL BE PERFORMED BY GDOT CERTIFIED WELDERS THAT HAVE IN THEIR POSSESSION A CURRENT WELDING CERTIFICATION CARD ISSUED BY THE OFFICE OF MATERIALS AND TESTING. USE ONLY E70XX (EXCLUDING E7014 AND E7024) LOW HYDROGEN ELECTRODES FOR MANUAL SHIELDED METAL ARC WELDING.
- p2SPECIAL PROTECTIVE COATING - CLEAN AND PAINT PILES AND SWAYBRACING WITH SPECIAL PROTECTIVE COATING NO. 2P IN ACCORDANCE WITH SECTIONS 520 AND 535 OF THE GEORGIA DOT SPECIFICATIONS. EXTEND COATING FROM TOP OF PILE TO 2FT BELOW GROUND FOR END BENT PILING. EXTEND COATING FROM BOTTOM OF CAP OR PEDESTAL FOOTING TO 5FT BELOW GROUND FOR INTERMEDIATE BENT PILING, REGARDLESS OF ENCASEMENT.
- p2SHOP DRAWING SUBMISSION - SUBMIT SHOP DRAWINGS WITH DEPENDENT INFORMATION AS A SET. SHOP DRAWINGS FOR BEAMS, METAL DECK FORMS AND STEEL DIAPHRAGMS WILL NOT BE REVIEWED UNTIL ALL HAVE BEEN RECEIVED.
- p2INCIDENTAL ITEMS - INCLUDE THE COST INCIDENTAL TO THE WORK THAT IS NOT SPECIFICALLY COVERED BY THE GEORGIA STANDARD SPECIFICATIONS, SUPPLEMENTAL SPECIFICATIONS AND/OR SPECIAL PROVISIONS IN THE OVERALL BID SUBMITTED. THIS INCLUDES THE COST OF WATERPROOFING, JOINT FILLERS AND OTHER INCIDENTAL ITEMS NECESSARY TO COMPLETE THE WORK.
- p2provide table for 2’ above estimated tip elevations
- p2STEEL DIAPHRAGMS - AT CONTRACTOR’S OPTION, STEEL DIAPHRAGMS MAY BE USED IN LIEU OF THE CONCRETE DIAPHRAGMS SHOWN IN THE PLANS. AT A MINIMUM, STEEL DIAPHRAGMS ARE TO BE DESIGNED AT STRENGTH LIMIT STATE III WITH A THREE SECOND GUST WIND SPEED OF 140MPH APPLIED TO ONE HALF OF THE VERTICAL SURFACE AREA OF THE EXPOSED BEAM USING EXPOSURE CATEGORY D. CROSS FRAME CONFIGURATIONS SHALL HAVE A HORIZONTAL ANGLE OR CHANNEL AT EITHER THE TOP OR BOTTOM POSITION. STEEL DIAPHRAGMS SHALL BE MANUFACTURED BY A FABRICATOR LISTED ON QPL 60 PER SECTION 501 OR GREATER STEEL. ALL COMPONENTS OF THE STEEL DIAPHRAGM SHALL BE GALVANIZED ACCORDING TO ASTM A 123. CONNECTION BOLTS SHALL CONFORM TO ASTM F3125 (GRADE A325). NUTS SHALL CONFORM TO ASTM A563. WASHERS SHALL CONFORM TO ASTM F436. ALL HARDWARE SHALL BE GALVANIZED ACCORDING TO ASTM A153. STABILITY OF THE BEAMS AND STRUCTURE DURING ALL PHASES OF CONSTRUCTION ARE THE SOLE RESPONSIBILITY OF THE CONTRACTOR. SUBMIT SHOP DRAWINGS AND CALCULATIONS FOR THE STEEL DIAPHRAGMS TO THE ENGINEER FOR REVIEW AND ACCEPTANCE. THE USE OF STEEL DIAPHRAGMS SHALL BE INCLUDED IN THE PRICE BID FOR “LUMP-SUPERSTRUCTURE.”
- p2VIBRATION MONITORING - THE PROJECT ENGINEER SHOULD CONTACT THE GEOTECHNICAL BUREAU OF THE GEORGIA DOT OFFICE OF MATERIALS AND TESTING AT GEOTECHNICAL_SUBMITTALS@DOT.GA.GOV TWO WEEKS PRIOR TO DRIVING PILES. SEE SPECIAL PROVISION 154 - CONSTRUCTION VIBRATION MONITORING.
- p2STEEL DIAPHRAGMS - AT CONTRACTOR’S OPTION, STEEL DIAPHRAGMS MAY BE USED IN LIEU OF THE CONCRETE DIAPHRAGMS SHOWN IN THE PLANS. AT A MINIMUM, STEEL DIAPHRAGMS ARE TO BE DESIGNED AT STRENGTH LIMIT STATE III WITH A THREE SECOND GUST WIND SPEED OF 140MPH APPLIED TO ONE HALF OF THE VERTICAL SURFACE AREA OF THE EXPOSED BEAM USING EXPOSURE CATEGORY D. CROSS FRAME CONFIGURATIONS SHALL HAVE A HORIZONTAL ANGLE OR CHANNEL AT EITHER THE TOP OR BOTTOM POSITION. STEEL DIAPHRAGMS SHALL BE MANUFACTURED BY A FABRICATOR LISTED ON QPL 60 PER SECTION 501 OR GREATER STEEL. ALL COMPONENTS OF THE STEEL DIAPHRAGMS SHALL BE GALVANIZED ACCORDING TO ASTM A 123. CONNECTION BOLTS SHALL CONFORM TO ASTM F3125 (GRADE A325). NUTS SHALL CONFORM TO ASTM A563. WASHERS SHALL CONFORM TO ASTM F436. ALL HARDWARE SHALL BE GALVANIZED ACCORDING TO ASTM A153. STABILITY OF THE BEAMS AND STRUCTURE DURING ALL PHASES OF CONSTRUCTION ARE THE SOLE RESPONSIBILITY OF THE CONTRACTOR. SUBMIT SHOP DRAWINGS AND CALCULATIONS FOR THE STEEL DIAPHRAGMS TO THE ENGINEER FOR REVIEW AND ACCEPTANCE. THE USE OF STEEL DIAPHRAGMS SHALL BE INCLUDED IN THE PRICE BID FOR “LUMP-SUM” SUPERSTRUCTURE CONCRETE.”
- p2STANDARD PLAN MODIFICATION - MODIFY THE APPROACH SLAB STANDARD TO INCREASE THE 3/4” EXPANSION JOINT SHOWN BETWEEN THE APPROACH SLAB AND THE BACK FACE PAVING REST AND END POST TO 3/8” AT BENT 1 AND 4. KEEP THE EXPANSION JOINT AT END BENT CONTINUOUS AROUND END POST. INCLUDE COST OF JOINT IN APPROACH SLAB PAYMENT. SEE ROADWAY PLANS FOR APPROACH SLAB PAVEMENT.
- p2STEEL DIAPHRAGMS - AT CONTRACTOR’S OPTION, STEEL DIAPHRAGMS MAY BE USED IN LIEU OF THE CONCRETE DIAPHRAGMS SHOWN IN THE PLANS.
- p2AT A MINIMUM, STEEL DIAPHRAGMS ARE TO BE DESIGNED AT STRENGTH LIMIT STATE III WITH A THREE SECOND GUST WIND SPEED OF 140MPH APPLIED TO ONE HALF OF THE VERTICAL SURFACE AREA OF THE EXPOSED BEAM USING EXPOSURE CATEGORY D.
- p2CROSS FRAME CONFIGURATIONS SHALL HAVE A HORIZONTAL ANGLE OR CHANNEL AT EITHER THE TOP OR BOTTOM POSITION.
- p2STEEL DIAPHRAGMS SHALL BE MANUFACTURED BY A FABRICATOR LISTED ON QPL 60 PER SECTION 501 OR GREATER STEEL.
- p2ALL COMPONENTS OF THE STEEL DIAPHRAGM SHALL BE GALVANIZED ACCORDING TO ASTM A 123.
- p2CONNECTION BOLTS SHALL CONFORM TO ASTM F3125 (GRADE A325).
- p2NUTS SHALL CONFORM TO ASTM A563.
- p2WASHERS SHALL CONFORM TO ASTM F436.
- p2ALL HARDWARE SHALL BE GALVANIZED ACCORDING TO ASTM A153.
- p2STABILITY OF THE BEAMS AND STRUCTURE DURING ALL PHASES OF CONSTRUCTION ARE THE SOLE RESPONSIBILITY OF THE CONTRACTOR.
- p2SUBMIT SHOP DRAWINGS AND CALCULATIONS FOR THE STEEL DIAPHRAGMS TO THE ENGINEER FOR REVIEW AND ACCEPTANCE.
- p2THE USE OF STEEL DIAPHRAGMS SHALL BE INCLUDED IN THE PRICE BID FOR “LUMP-SUPESTR CONCRETE.”
- p43'-0" ENDWALL OUTSIDE EXTERIOR BEAM, TYP.
- p48" FILLET, TYP.
- p481°-20'-05.0", TYP.
- p410" CONCRETE DIAPHRAGM, TYP.
- p41'-0" EDGEBEAM, TYP.
- p412" PAVING REST
- p41'-6" ENDWALL
- p4FENCE POST SPACING
Every crop it was read in — the drawing beside what the model took off it
Page 2
p02_r03 long list of construction and material general notesNotes
- Concrete diaphragmsconcreteShown in plans; may be replaced by steel diaphragms at contractor's option.
154 Special ProvisionTWO WEEKS Submittal period before driving piles24 HOURS Minimum freeze period3” Formed hole diameter12” Formed hole depth1 AND 4 Bent numbers140MPH Wind speedONE HALF Wind exposure+8 more
p02_r10 steel diaphragmsNotes
- concrete diaphragmsconcreteReferenced as shown in the plans; not depicted in this crop.
THREE SECOND gust wind duration140 MPH gust wind speedONE HALF vertical surface area loaded
p02_r03Notes
- Concrete diaphragmsconcreteShown in plans; steel diaphragms may be used in lieu of these.
TWO WEEKS Advance notice before driving piles3" Dowel-bar hole diameter12" Dowel-bar hole depth24 HOURS Minimum pile freeze period140MPH Design gust wind speed3/4" Expansion joint shown between approach slab and back face paving rest/end post3/8" Expansion joint at Bent 1 and 46FT Chain link fence height+3 more
p02_r10Notes
- Concrete diaphragmconcreteReferenced as shown in the plans.
THREE SECOND Gust wind duration140 MPH Gust wind speedONE HALF Applied vertical surface area
Page 4
p04_r01 deck planPlan
- concrete diaphragm×4linearconcreteCalled out as 10" CONCRETE DIAPHRAGM, TYP.
55'-0" overall deck width18'-4" deck-width divisions9'-6" fence post spacing6'-6" fence post spacing1'-0" edge offset5'-0" fence-post end spacing3'-0" endwall outside exterior beam8" fillet+22 more
p04_r02 deck plan of span 1 with beams and dimensionsPlan
- concrete diaphragm×2rectangularconcreteCalled out as 10" CONCRETE DIAPHRAGM, TYP.
55'-0" overall deck width18'-4" deck width divisions9'-6" fence post spacing6'-6" fence post spacing1'-0" offset3'-0" endwall outside exterior beam8" fillet1'-0" edgebeam+22 more
p04_r06 notes of general notesNotes
- diaphragmLocation referenced to beam sheets.
1” Expansion joint width1” Expansion joint width2-600 Reinforcement bar quantity10’-0” LONG Reinforcement bar length
p04_r06Notes
- DiaphragmLocation referenced on beam sheets.
1” Expansion joint width10'-0” Bar length2-600 Bar quantity/designation
span_1Plan
- concrete diaphragmrectangular in planconcreteCalled out as 10" CONCRETE DIAPHRAGM, TYP.
55'-0" overall deck width18'-4" deck width division9'-6" fence post spacing6'-6" fence post spacing1'-0" offset1'-9½" deck edge dimension3'-0" endwall outside exterior beam8" fillet+22 more
Page 5
p05_r01 deck planPlan
- concrete diaphragmtransverse rectangular diaphragmconcreteCalled out as 10" CONCRETE DIAPHRAGM, TYP.
82'-0" overall deck length16'-4½" deck longitudinal segment length16'-6" deck end segment length9'-6" fence post spacing9'-10½" fence post spacing3'-0" end offset2'-0" end offset1'-0" edgebeam width+10 more
p05_r05 notes of general construction notesNotes
- diaphragmLocation referenced on beam sheets.
1″ Expansion joint in barrier1″ Expansion joint in barrier10′-0″ 600 bars length2-600 600 bars quantity
p05_r05Notes
- diaphragmLocation is referenced to beam sheets.
½" expansion joint width½" expansion joint width10'-0" bar length2-600 reinforcement notation/quantity as printed400 bar notation/quantity as printed
span_2Plan
- Concrete diaphragm×2linear transverse diaphragmconcreteCalled out as 10” CONCRETE DIAPHRAGM, TYP.
82'-0” Overall deck width16'-4½” Deck-width segment16'-6” Deck-width segment3'-0” Fence-post end offset9'-6” Fence post spacing9'-10½” Fence post spacing2'-0” End offset1'-0” Edgebeam width+11 more
Page 6
p06_r01Plan
- Concrete diaphragm×2transverse linear diaphragmconcreteCalled out as 10" CONCRETE DIAPHRAGM, TYP.
55'-0" overall deck width, upper deck18'-4" deck-width bay, upper deck18'-4" deck-width bay, upper deck18'-4" deck-width bay, upper deck6'-6" fence post spacing, upper deck9'-6" fence post spacing, upper deck9'-6" fence post spacing, upper deck9'-6" fence post spacing, upper deck+54 more
p06_r01 deck plan span 3Plan
- concrete diaphragmlinearconcreteCalled out as 10" CONCRETE DIAPHRAGM, TYP.
55'-0" overall deck width18'-4" deck width division6'-6" fence post spacing6'-2 3/8" fence post spacing6'-8 3/16" fence post spacing9'-6" fence post spacing8'-0" fence post spacing8'-9" fence post spacing+22 more
Page 7
p07_r11Cross Section
- diaphragms between beams×4rectangular/stepped blocks as drawnLocated in the four spaces between the five visible beams.
5" end spacing at 403A bar group7 reinforcement quantity5" end spacing at 403A bar group2% deck slope1" plain bar diameter2 reinforcement quantity4 reinforcement quantity2 reinforcement quantity
p07_r08Section
- concrete diaphragm×1rectangularconcreteLabeled 10" CONC. DIAPH.
10" concrete diaphragm width2" vertical dimension2'-4" vertical dimension1 1/2" clear dimension, typical1" plain bar diameter3/4" = 1'-0" drawing scale
p07_r09Section
- concrete diaphragm×1rectangularconcreteDimensioned across its thickness; shown between beam portions.
10 concrete diaphragm thickness1½" clear cover1" plain bar diameter2-507A reinforcement quantity4-402A reinforcement quantity2-507A reinforcement quantity¾" = 1'-0" scale
p07_r08 section thru diaphragm spans 1 and 3Section
- concrete diaphragm×1rectangularconcreteLocated through beam section; labeled 10" CONC. DIAPH.
10" concrete diaphragm thickness2" dimension2'-4" vertical dimension1 1/2" clear cover, typical1" plain bar diameter2-507A reinforcement quantity4-402A reinforcement quantity2-507A reinforcement quantity+1 more
p07_r09 detailed diaphragm rebar section spans 1 and 3Section
- diaphragm×1rectangularSectioned rectangular diaphragm between beam outlines.
1 1/2" CL. TYP.1" DIA.3/4" = 1'-0" SCALE
p07_r11 cross section of diaphragm between beams with rebarSection
- diaphragmsolid vertical web/blockSection title identifies this as a section through diaphragm; individual diaphragm elements are not clearly tagged.
2% % deck slope5″ edge spacing5″ edge spacing7-403A reinforcing-bar quantity and spacing1″ bar diameter2-507A reinforcing-bar quantity4-402A reinforcing-bar quantity2-507A reinforcing-bar quantity
Page 9
p09_r03Section
- concrete diaphragm×1rectangular vertical diaphragmconcreteShown in SECTION THRU DIAPHRAGM, SPAN 2.
18” reinforcement spacing8” horizontal dimension1'-0 1/2” horizontal dimension1'-0 1/2” horizontal dimension8” horizontal dimension4” clear cover8” vertical dimension1 1/2” clear cover+14 more
p09_r03 detail aSection
- concrete diaphragm×1rectangularconcreteShown in section at right.
18" reinforcement spacing8" horizontal dimension1'-0½" horizontal dimension1'-0½" horizontal dimension8" horizontal dimension4" clear cover8" vertical dimension1½" clear cover, 3 sides+14 more
p09_r04 longitudinal section through deck diaphragm at beamsSection
- diaphragm×5rectangularDiaphragms are shown between adjacent girders.
2% deck cross slope5″ end spacing5″ end spacing1″ plain bar diameter