Matched toBridge Crash Barrierbridge.ancillary_system.crash_barrieron “Concrete Barrier”
| The class asks for | Value | How | From |
|---|---|---|---|
| LengthLwants m/mm | 756 LF378 LF (Left Bridge) + 378 LF (Right Bridge) = 756 LF.The Summary of Quantities lists Concrete Barrier pay item 500-2100 as 378 LF for each of the Left Bridge and Right Bridge; the total project barrier length is the sum of those two stated quantities. | derived | p2 · p02_r08 |
| HeightHwants m/mm | 3'-6" ft-inBarrier height stated as 3'-6".The Barrier Detail explicitly dimensions the concrete barrier height as 3'-6". | read | p8 · p08_r02 barrier detail |
| Instance CountNwants count | 4 count2 barriers at the outside deck edges per bridge × 2 bridges (Left Bridge and Right Bridge) = 4 barriers.The deck cross-section shows two concrete traffic barriers, one at each outside deck edge. The quantities table identifies separate Left Bridge and Right Bridge barrier work. Applying the typical two-edge-barrier arrangement to both bridges gives four barrier runs; the right-bridge geometry is inferred from the separate right-bridge barrier quantity. | derivedcheck | p7 · p07_r03 full deck cross section with beams and rebarp2 · p02_r08 |
| Material TypeMAT | Class D concreteBarrier material is identified as concrete, with Class D specified for the barrier in the design-data reading.The design-data reading identifies the barrier as concrete and states that Class D concrete is specified. | read | p2 · p02_r02 general notes continued |
Worked out by openai/gpt-5.6-terra-pro from the readings below, which are the source. A derived value shows its arithmetic — check it against the drawing before it is priced.
How the sheets named it
Every dimension read for it50
- 30 LBS PER SQ FTFuture paving allowancenot attributedp2 · p02_r02
- 4,000 PSIBarrier concrete compressive strength, f′cp2 · p02_r02
- 2Seismic performance zonenot attributedp2 · p02_r02 general notes continued
- 0.142A_Snot attributedp2 · p02_r02 general notes continued
- 0.155S_Dnot attributedp2 · p02_r02 general notes continued
- 30 LBS PER SQ FTFuture paving allowancenot attributedp2 · p02_r02 general notes continued
- 4,000 PSIBarrier concrete compressive strength, f'cp2 · p02_r02 general notes continued
- 378 LFLeft bridge quantity, concrete barrierp2 · p02_r08 pay item quantity table for left right bridges
- 378 LFRight bridge quantity, concrete barrierp2 · p02_r08 pay item quantity table for left right bridges
- 1”Expansion joint widthnot attributedp4 · p04_r06 notes of general notes
- 1”Expansion joint widthnot attributedp4 · p04_r06 notes of general notes
- 1”Expansion joint widthp4 · p04_r06
- 3"side elevation dimensionp5 · p05_r03
- 1″Expansion joint in barrierp5 · p05_r05 notes of general construction notes
- 1″Expansion joint in barrierp5 · p05_r05 notes of general construction notes
- 22’-0”widthnot attributedp7 · p07_r05
- 14’-2½”widthnot attributedp7 · p07_r05
- 34’-0”widthnot attributedp7 · p07_r05
- 6’-0”widthnot attributedp7 · p07_r05
- 8" inbarrier heightp7 · p07_r03 full deck cross section with beams and rebar
- 8" inbarrier heightp7 · p07_r03 full deck cross section with beams and rebar
- 22'-0"unlabellednot attributedp7 · p07_r05 deck cross section with beam spacing and slab rebar
- 14'-2½"unlabellednot attributedp7 · p07_r05 deck cross section with beam spacing and slab rebar
- 34'-0"unlabellednot attributedp7 · p07_r05 deck cross section with beam spacing and slab rebar
- 6'-0"unlabellednot attributedp7 · p07_r05 deck cross section with beam spacing and slab rebar
- 8"unlabelledp7 · p07_r05 deck cross section with beam spacing and slab rebar
- 8"unlabelledp7 · p07_r05 deck cross section with beam spacing and slab rebar
- 0"taper at end postp8 · p08_r02
- 1'-9 1/2"horizontal dimensionp8 · p08_r02
- 8"horizontal dimensionp8 · p08_r02
- 1'-0"horizontal dimensionp8 · p08_r02
- 1 1/2"clearancep8 · p08_r02
- 3"clearancep8 · p08_r02
- 3'-6"barrier heightp8 · p08_r02
- 2"clearance, two sidesp8 · p08_r02
- 5'-1"Vertical dimensionnot attributedp8 · p08_r06
- 4'-7"Vertical dimensionnot attributedp8 · p08_r06
- 3'-6"Barrier heightp8 · p08_r06
- 1'-9½"overall top horizontal dimensionp8 · p08_r02 barrier detail
- 8"*dimension marked with asteriskp8 · p08_r02 barrier detail
- 1'-0"horizontal dimensionp8 · p08_r02 barrier detail
- 3"clearancep8 · p08_r02 barrier detail
- 3'-6"barrier heightp8 · p08_r02 barrier detail
- 2"clearance, two sidesp8 · p08_r02 barrier detail
- 3"horizontal dimensionp8 · p08_r02 barrier detail
- 45°anglenot attributedp8 · p08_r05 elevation of chain link fence panel with tension bars
- 3'-6″barrier heightp8 · p08_r06 detail of end pull fence post with pipe sleeve base
- 3/4″ = 1'-0″scalenot attributedp8 · p08_r06 detail of end pull fence post with pipe sleeve base
- 1'-6 3/16"Partial dimension at top of cropnot attributedp10 · p10_r05 general construction notes 1 12 for beam
- 1'-6 3/16"partial dimension at top of cropnot attributedp10 · p10_r05
Notes on the sheets that carry it
- p2VIBRATION MONITORING - THE PROJECT ENGINEER SHOULD CONTACT THE GEOTECHNICAL BUREAU OF THE GEORGIA DOT OFFICE OF MATERIALS AND TESTING AT GEOTECHNICAL_SUBMITTALS @DOT.GA.GOV TWO WEEKS PRIOR TO DRIVING PILES. SEE SPECIAL PROVISION 154 - CONSTRUCTION VIBRATION MONITORING.
- p2STEEL H-PILES - USE STEEL FOR H-PILES THAT MEETS THE REQUIREMENTS OF ASTM A 709 GR 50.
- p2PILE LENGTHS - ERRATIC PILE LENGTHS CAN BE EXPECTED.
- p2PILE DRIVING - SHOULD PILES FAIL TO OBTAIN DRIVING RESISTANCE AFTER ACHIEVING THE PILE TIP ELEVATIONS SHOWN, ALLOW PILES TO FREEZE A MINIMUM OF 24 HOURS AND RESTRIKE WITH A WARM HAMMER.
- p2SMOOTH DOWEL BARS - PLACE SMOOTH DOWEL BARS IN FORMED 3” DIAMETER X 12” DEEP HOLES AND GROUT IN PLACE SIMILAR TO ANCHOR BOLTS, SEE SUB-SECTION 501.3.05.B.3 OF THE GEORGIA DOT SPECIFICATIONS. STIRRUPS MAY BE SHIFTED SLIGHTLY FOR FORMED HOLES.
- p2ABUTMENT SOIL REINFORCING DEVICE INSERTS - INCLUDE THE COST OF FURNISHING AND INSTALLING INSERTS FOR SOIL REINFORCING DEVICES AT ABUTMENT IN THE OVERALL BID SUBMITTED...
- p2VIBRATION MONITORING - THE PROJECT ENGINEER SHOULD CONTACT THE GEOTECHNICAL BUREAU OF THE GEORGIA DOT OFFICE OF MATERIALS AND TESTING AT LEAST TWO WEEKS PRIOR TO DRIVING PILES. SEE GEOTECHNICAL_SUBMITTALS@DOT.GA.GOV
- p2SPECIAL PROVISION 154 - CONSTRUCTION VIBRATION MONITORING.
- p2STEEL H-PILES - USE STEEL FOR H-PILES THAT MEETS THE REQUIREMENTS OF ASTM A 709 GRADE 50.
- p2SMOOTH DOWEL BARS - PLACE SMOOTH DOWEL BARS IN FORMED 3" DIAMETER X 12" DEEP HOLES AND GROUT IN PLACE SIMILAR TO ANCHOR BOLTS, SEE SUB-SECTION 501.3.05.B.3 OF THE GEORGIA DOT SPECIFICATIONS. STIRRUPS MAY BE SHIFTED SLIGHTLY TO CLEAR FORMED HOLES.
- p2ABUTMENT SOIL REINFORCING DEVICE INSERTS - INCLUDE THE COST OF FURNISHING AND INSTALLING INSERTS FOR SOIL REINFORCING DEVICES AT ABUTMENT IN THE OVERALL [partial; crop cuts off].
- p41. SEE BEAM SHEETS FOR DIAPHRAGM LOCATION.
- p42. BARRIER AND FENCE POST DIMENSIONS ARE MEASURED ALONG INSIDE FACE OF BARRIER.
- p4* 3. [symbol] 1” EXPANSION JOINT IN BARRIER.
- p4** 4. [symbol] 1” EXPANSION JOINT IN BARRIER AND REQUIRED CONSTRUCTION JOINT IN DECK.
- p4ⓘ 5. 2-600 (10’-0” LONG) BETWEEN EACH PAIR OF 400 BARS IN TOP OF SLAB OVER INTERMEDIATE BENTS 2 AND 3.
- p53/4" CHAMFER
- p51" PREFORMED JOINT FILLER
- p5LOW MODULUS SILICONE SEALANT (TYPE A)
- p5HOLD IN PLACE WITH 10d GALV. NAILS.
- p5* 3. ℄ 1″ EXPANSION JOINT IN BARRIER.
- p5** 4. ℄ 1″ EXPANSION JOINT IN BARRIER AND REQUIRED CONSTRUCTION JOINT IN DECK.
- p5ⓑ 6. LAP IN BARS SHALL BE STAGGERED AND ALTERNATED TO MAXIMIZE THE DISTANCE BETWEEN ADJACENT SPLICES.
- p5* 3. ½" EXPANSION JOINT IN BARRIER.
- p5** 4. ½" EXPANSION JOINT IN BARRIER AND REQUIRED CONSTRUCTION JOINT IN DECK.
- p5[circled *] 5. 2-600 (10'-0" LONG) BETWEEN EACH PAIR OF 400 BARS IN TOP OF SLAB OVER INTERMEDIATE BENTS 2 AND 3.
- p5[two circled *] 6. LAP IN BARS SHALL BE STAGGERED AND ALTERNATED TO MAXIMIZE THE DISTANCE BETWEEN ADJACENT SPLICES.
- p7FENCE NOT SHOWN, TYP.
- p7502 AT EVERY 500A, TYP.
- p730-400A SPACED AS SHOWN
- p7500A AT 6½”
- p750I UNDER EVERY 500A
- p7REQUIRED CONSTRUCTION JOINT PARALLEL WITH DECK, TYP.
- p7¾” TRIANGULAR DRIP BEAD FULL LENGTH OF BRIDGE, TYP.
- p758-600 (2 BETWEEN EACH PAIR OF 400 BARS IN TOP OF SLAB OVER INTERMEDIATE BENTS)
- p7DIMENSION “D” IS MEASURED FROM TOP OF SLAB TO TOP OF BEAMS AT CENTERLINE BEARING. VARY “D” BETWEEN BEARINGS TO COMPENSATE FOR DEAD LOAD DEFLECTION, AND VERTICAL CURVE.
- p7MAINTAIN A CONSTANT SLAB THICKNESS OF 7¾” BETWEEN BEAMS AND 8” IN THE OVERHANGS.
- p7“D” = 8¾” INTERIOR BEAMS
- p7“D” = 9⅞” EXTERIOR BEAMS
- p7AT EQ. SPS.
Every crop it was read in — the drawing beside what the model took off it
Page 2
p02_r08
The merge put this crop under the item, but its reading names it differently — open the crop to see what it said.
p02_r02Notes
- BarrierconcreteConcrete class and strength are listed in design data.
TWO WEEKS Vibration monitoring notice period3" Smooth dowel bar hole diameter12" Smooth dowel bar hole depth24 HOURS Minimum pile freeze period2 Seismic performance zone0.142 AS0.155 SDI30 LBS PER SQ FT Future paving allowance+8 more
p02_r02 general notes continuedNotes
- barrierconcreteClass D concrete is specified.
TWO WEEKS Advance notice before driving piles50 Steel H-pile material grade3" Smooth dowel bar hole diameter12" Smooth dowel bar hole depth24 HOURS Pile freeze duration2 Seismic performance zone0.142 A_S0.155 S_D+7 more
p02_r08 pay item quantity table for left right bridgesTable
- Concrete barrier500-2100concreteListed for left and right bridge.
35 CY Left bridge quantity, foundation backfill material35 CY Right bridge quantity, foundation backfill material295 CY Left bridge quantity, bridge excavation295 CY Right bridge quantity, bridge excavation811 SY Left bridge quantity, grooved concrete811 SY Right bridge quantity, grooved concreteLUMP LS Left bridge quantity, superstructure concreteLUMP LS Right bridge quantity, superstructure concrete+24 more
Page 4
p04_r06 notes of general notesNotes
- barrierBarrier and fence post dimensions are measured along inside face of barrier; expansion joints noted in barrier.
1” Expansion joint width1” Expansion joint width2-600 Reinforcement bar quantity10’-0” LONG Reinforcement bar length
p04_r06Notes
- BarrierIncludes noted expansion joints; dimensions measured along inside face.
1” Expansion joint width10'-0” Bar length2-600 Bar quantity/designation
Page 5
p05_r03Detail
- barrierrectangular in plan and elevation; tapered in side elevationBarrier expansion-joint detail shown in plan, elevation, and side elevation.
3/4" CHAMFER3/4" joint dimension1" PREFORMED JOINT FILLER10d GALV. NAILS3" side elevation dimension
p05_r03 details of 1 expansion joint in barrierDetail
- BarriertaperedShown in side elevation only; expansion joint occurs at barrier base/through barrier.
3/4” Chamfer3/4” Dimension1” Preformed joint filler thickness3/4” Dimension3” Barrier/base dimension1” Expansion joint size
p05_r05 notes of general construction notesNotes
- barrierBarrier dimensions and expansion joints are noted.
1″ Expansion joint in barrier1″ Expansion joint in barrier10′-0″ 600 bars length2-600 600 bars quantity
p05_r05Notes
- barrierNotes address barrier dimensions and expansion joints.
½" expansion joint width½" expansion joint width10'-0" bar length2-600 reinforcement notation/quantity as printed400 bar notation/quantity as printed
Page 7
p07_r05Cross Section
- edge upstand×2tapered vertical upstandOne is shown at each outside deck edge; fence is noted as not shown.
8¾” D, interior beams9⅜” D, exterior beams43’-7” overall width40’-0” gutter-to-gutter width22’-0” width14’-2½” width34’-0” width6’-0” width+18 more
p07_r07Section
- barrier×1tapered vertical sectionPartial barrier section is visible at the left slab edge.
58 600 bars2 bars between each pair of 400 bars
p07_r03Cross Section
- edge barrier×2taperedOne barrier is shown at each deck edge.
8¾” Interior-beam dimension “D”9⅞” Exterior-beam dimension “D”7¾” Slab thickness between beams8” Slab thickness in overhangs43’-7” Overall out-to-out width40’-0” Gutter-to-gutter width22’-0” Width dimension14’-2½” Width dimension+20 more
p07_r11Cross Section
- edge barriers/parapets×2tapered vertical profilesBoth are only partially visible at the left and right crop edges.
5" end spacing at 403A bar group7 reinforcement quantity5" end spacing at 403A bar group2% deck slope1" plain bar diameter2 reinforcement quantity4 reinforcement quantity2 reinforcement quantity
p07_r12Section
- parapet/barrier×2taperedOne is shown at each outside edge; fence is noted as not shown.
8” slab/overhang thickness2” dimension at left end of 404 bar group8-404 reinforcement quantity and mark2” dimension at right end of 404 bar group2% cross slope1-509 reinforcement quantity and mark1-508 reinforcement quantity and mark1-802 reinforcement quantity and mark+4 more
p07_r13Cross Section
- parapet/barrier×2tapered uprightOne is shown at each outside edge.
8” Typical slab/overhang thickness2” End distance8-404 Reinforcement quantity and mark2% Cross slope2” End distance2-800 Reinforcement quantity and mark72 HOURS Form removal time28 DAY Concrete strength age
p07_r02 general notes on slab dimension d and thicknessCross Section
- parapet/barrier×1taperedLocated at the exterior slab edge.
8¾” Dimension “D” — interior beams9⅛” Dimension “D” — exterior beams7¾” Constant slab thickness between beams8” Slab thickness in overhangs1½” Horizontal dimension1'-8” Horizontal dimension8” Vertical dimension500A Reinforcement spacing callout+2 more
p07_r03 full deck cross section with beams and rebarCross Section
- concrete traffic barrier×2taperedOne barrier is shown at each outside edge of the slab.
43'-7" ft-in out to out40'-0" ft-in gutter to gutter34'-0" ft-in deck width dimension6'-0" ft-in deck width dimension22'-0" ft-in deck width dimension14'-2½" ft-in deck width dimension1'-8" ft-in edge dimension1'-8" ft-in edge dimension+27 more
p07_r05 deck cross section with beam spacing and slab rebarCross Section
- edge barrier×2tapered parapet/barrierOne is shown at each outside edge of the slab.
43'-7" out to out40'-0" gutter to gutter22'-0"14'-2½"34'-0"6'-0"1'-8"1'-8"+24 more
p07_r07 deck slab cross section over intermediate bentSection
- parapet or barrier×1tapered vertical profileVisible at the left end of the slab.
58-600 reinforcement callout2 quantity between each pair of 400 bars400 BARS bar reference
p07_r10 longitudinal section through beam diaphragmsSection
- parapet/barrier×2tapered vertical barrierVisible at the left and right edges of the section.
2% % deck cross slope5" edge spacingAT EQUAL SPACES reinforcement spacing1" plain bar diameter
p07_r11 cross section of diaphragm between beams with rebarSection
- edge barrier×2tapered vertical barrierOne at each outer edge of the section.
2% % deck slope5″ edge spacing5″ edge spacing7-403A reinforcing-bar quantity and spacing1″ bar diameter2-507A reinforcing-bar quantity4-402A reinforcing-bar quantity2-507A reinforcing-bar quantity
p07_r12 section thru edge beamCross Section
- barrier×2tapered parapet profileOne is shown at each outer deck edge.
8 " Typical deck thickness2 " Bar offset2 " Bar offset2 % Deck slope72 HOURS Form removal duration28 DAY Concrete strength age
p07_r13 longitudinal section through edge beam and rebarCross Section
- parapet/barrier×2taperedconcreteOne is shown at each outside edge of the deck.
8" typical deck-edge thickness2" end cover/offset8-404 reinforcement quantity and mark at equal spaces2% deck cross slope2-800 reinforcement quantity and mark
p07_r06Cross Section
- barrier/parapet×1tapered vertical sectionVisible at the left slab edge only.
2 quantity of 58-600 bars between each pair of 400 bars
p07_r02Cross Section
- parapet or barrier×1taperedLocated at the left slab edge; no tag is shown.
8¾″ Dimension “D” — interior beams9⅛″ Dimension “D” — exterior beams7¾″ Constant slab thickness between beams8″ Slab thickness in overhangs1/2″ Horizontal dimension at left edge1′-8″ Horizontal dimension6½″ Reinforcement spacing2% Slope
Page 8
p08_r02Detail
- barrier parapet×1tapered concrete section with vertical outside facereinforced concreteBarrier cross-section shown on a supporting slab edge.
2'-2" minimum lap0" taper at end post1'-9 1/2" horizontal dimension8" horizontal dimension1'-0" horizontal dimension1 1/2" clearance3" clearance3'-6" barrier height+6 more
p08_r06Detail
- barrier×1tapered barrier cross section
2 7/8" Pipe diameter, typical5'-1" Vertical dimension4'-7" Vertical dimension1'-0" Vertical dimension2'-6" Radius45° Angle10 1/4" Horizontal dimension10'-4" Overall vertical dimension+5 more
p08_r02 barrier detailDetail
- concrete barrier×1tapered vertical barrier with rectangular baseBarrier cross-section detail; tapers to 0" at end post.
2'-2" minimum lap of 503A and 503B bars1'-9½" overall top horizontal dimension8"* dimension marked with asterisk1'-0" horizontal dimension1½" clearance3" clearance3'-6" barrier height2" clearance, two sides+4 more
p08_r03 text notes specifying chain link security fence requirementsNotes
- parapetSleeves are to be cast in parapet.
- barrierPosts are to be placed minimum 1'-0” from joints in barrier.
9 GAGE fence gageTWO INCH security fence size4” DIA. sleeve diameter4” DIA. sleeve diameter14” maximum fabric fastening interval7’-0” minimum post spacing10’-0” maximum post spacing1’-0” minimum post distance from barrier joints+1 more
p08_r05 elevation of chain link fence panel with tension barsElevation
- barrierrectangular elevationSupporting barrier is shown below the fence.
12″ O.C. MAX. tension bar band spacing1⅝″ DIA. pipe diameter2⅞″ DIA. pipe diameter1′-0″ horizontal distance½″ offset1′-0″ pipe sleeve depth5′-1″ fence height4′-7″ fence height+3 more
p08_r06 detail of end pull fence post with pipe sleeve baseDetail
- barrier×1taperedBarrier is shown on top of the slab.
2 7/8″ pipe diameter, typical5'-1″ fence/post height4'-7″ vertical dimension10¼″ horizontal offset2'-6″ R bend radius45° bend angle10'-4″ overall height7'-0″ fence height+6 more
p08_r03Notes
- parapetReceives cast galvanized sleeves.
- barrierPosts are to be placed a minimum distance from joints in barrier.
9 GAGE fence wire gageTWO INCH security fence size4" DIA. galvanized sleeve diameterTHREE DAYS grout curing period14" maximum fence fabric fastening interval7'-0" minimum post spacing10'-0" maximum post spacing1'-0" minimum post distance from joints in barrier
p08_r05Elevation
- barrierrectangular in elevation; partial formed profile at rightFence posts are mounted at the barrier; a partial adjacent barrier detail is shown at right.
12" TENSION BAR BANDS AT O.C. MAX.1 5/8" DIA.2 7/8" DIA. PIPE, TYP.2 7/8" PULL POST1'-0"1/2" OFFSET1'-0"+7 more
Page 9
p09_r05Section
- parapet/barrier×2taperedTall tapered elements are shown at the two deck edges; fence is noted as not shown.
2″ edge distanceAT EQUAL SPACES spacing2″ edge distance2% deck slope72 HOURS edge beam form removal time28 DAY concrete strength reference age
p09_r04 longitudinal section through deck diaphragm at beamsSection
- barrier/parapet×2tapered uprightOne is shown at each outer deck edge.
2% deck cross slope5″ end spacing5″ end spacing1″ plain bar diameter
p09_r05 section thru edge beamCross Section
- concrete barrier/parapet×2tapered solid barrierconcreteOne is visible at each exterior deck edge; shown only partially at the top of the crop.
8-404 reinforcement callout at equal spaces2" end dimension, left2" end dimension, right2% deck cross slope
Page 10
p10_r05 general construction notes 1 12 for beamNotes
- barrierReferenced for composite dead-load deflection.
1'-6 3/16" Partial dimension at top of crop4'-6" Beam pickup distance from ends4" Pickup embedment distance from bottom of beam1/2" OR 3/4" Beam edge chamfer1/8" Epoxy mortar at each beam end1 3/4" Fixed-end hole diameter7" Fixed-end hole depth4" X 1 3/4" X 7" Expansion-end slot size+11 more
p10_r09 notes of psc beamNotes
- barrierReferenced as contributing to composite dead-load deflection.
1/8″ Epoxy mortar thickness at each beam end1 3/4″ Diameter of hole at fixed ends7″ Depth of hole at fixed ends4″ Slot width at expansion ends1 3/4″ Slot dimension at expansion ends7″ Slot depth at expansion ends1 1/2″ Smooth dowel diameter1/4″ Roughened surface amplitude+1 more
p10_r05Notes
- barrierReferenced in composite dead load deflection note.
1'-6 3/16" partial dimension at top of crop4'-6" pick-up location from beam ends4" pick-up embedment from bottom of beam1/2" OR 3/4" beam edge chamfer1/8" epoxy mortar at each beam end1 3/4" fixed-end hole diameter7" fixed-end hole depth4" expansion-end slot width+13 more
p10_r09Notes
- barrierReferenced as contributing to composite dead-load deflection.
1/8" epoxy mortar at each beam end1 3/4" fixed-end hole diameter7" fixed-end hole depth4" expansion-end slot width1 3/4" expansion-end slot length7" expansion-end slot depth1 1/2" smooth dowel diameter1/4" roughened top-surface amplitude
Page 11
p11_r10Notes
- BarrierReferenced as contributing to composite dead load deflection.
5’-6” Pick-up location from beam ends4” Pick-up embedment from bottom of beam1/2” Beam edge chamfer3/4” Beam edge chamfer1/8” Epoxy mortar at each beam end1 3/4” Fixed-end hole diameter7” Fixed-end hole depth4” Expansion-end slot width+8 more
p11_r10 notes of beam notesNotes
- barrierReferenced in composite dead load deflection note.
5'-6" Pick-up distance from beam ends4" Pick-up embedment from bottom of beam1/2" Beam edge chamfer3/4" Beam edge chamfer1/8" Epoxy mortar at each beam end1 3/4" Fixed-end hole diameter7" Fixed-end hole depth4" Expansion-end slot width+4 more