Matched toBridge Superstructurebridge.superstructureon “Bridge Superstructure”
This class asks for no measurements, so there is no take-off to do against it.
How the sheets named it
Every dimension read for it14
- 23'MINIMUM REQUIRED VERTICAL CLEARANCEp1 · p01_r11
- 23'MINIMUM REQUIRED VERTICAL CLEARANCEp1 · p01_r11
- 2MINIMUM REQUIRED HORIZONTAL CLEARANCEnot attributedp1 · p01_r11
- 74'-7 15/16"dimensionnot attributedp1 · p01_r01 plan of twin bridges spanning railroad tracks
- STA. 17+29.07stationnot attributedp1 · p01_r01 plan of twin bridges spanning railroad tracks
- 22'-0"dimensionnot attributedp1 · p01_r01 plan of twin bridges spanning railroad tracks
- 22'-0"dimensionnot attributedp1 · p01_r01 plan of twin bridges spanning railroad tracks
- 5'-0"dimensionnot attributedp1 · p01_r01 plan of twin bridges spanning railroad tracks
- 15'-0"dimensionnot attributedp1 · p01_r01 plan of twin bridges spanning railroad tracks
- 192'-0"TOTAL LENGTH OF BRIDGEp1 · p01_r08 elevation of bridge spans bents and wingwalls
- 192'-0" ***TOTAL LENGTH OF BRIDGEp1 · p01_r09 elevation of bridge spans bents and pile bents
- 30 LBS PER SQ FTFuture paving allowancenot attributedp2 · p02_r02
- 4,000 PSISuperstructure concrete compressive strength, f′cp2 · p02_r02
- 3,500 PSISubstructure concrete compressive strength, f′cp2 · p02_r02
Notes on the sheets that carry it
- p11. ALL BENTS ARE PARALLEL TO ℄ CENTRAL OF RAILWAY COMPANY.
- p12. END BENT PILES NOT SHOWN.
- p1** 3. STATIONS ARE ALONG ℄ SR 21 AT INTERSECTIO [partial]
- p1AND B.F.P.R. OR ℄ BENT.
- p1ELEVATIONS ARE ALONG EASTBOUND AND WEST [partial]
- p1PROFILE GRADE LINES AT THE INTERSECTION O [partial]
- p1PROFILE GRADE LINES AND B.F.P.R. OR CENTER [partial]
- p1*** 4. MEASURED ALONG ℄ SR 21.
- p1⊛ 5. LEFT BRIDGE:
- p1MINIMUM REQUIRED VERTICAL CLEARANCE = 23'
- p1EXISTING TRACK VERTICAL CLEARANCE CALCULA [partial]
- p1FUTURE TRACK VERTICAL CLEARANCE CALCULA [partial]
- p1RIGHT BRIDGE:
- p1⊛ ⊛ 6. MINIMUM REQUIRED HORIZONTAL CLEARANCE = 2 [partial]
- p1POINT OF MIN. VERT. CLEARANCE
- p1FUTURE POINT OF MIN. VERT. CLEARANCE
- p1TO BE REMOVED
- p1TEMPORARY SHORING AS NECESSARY, TYP.
- p1MIN. HORIZ. CL. CALCULATED TO FACE OF COLUMN
- p1CHAIN LINK WIRE FENCE, TYP.
- p1FRONT FACE OF WALL NO.1
- p1FRONT FACE OF WALL NO.2
- p1EL.151.00, TYP.
- p1APPROXIMATE EXISTING GROUNDLINE
- p1FUTURE GROUNDLINE
- p2VIBRATION MONITORING - THE PROJECT ENGINEER SHOULD CONTACT THE GEOTECHNICAL BUREAU OF THE GEORGIA DOT OFFICE OF MATERIALS AND TESTING AT GEOTECHNICAL_SUBMITTALS @DOT.GA.GOV TWO WEEKS PRIOR TO DRIVING PILES. SEE SPECIAL PROVISION 154 - CONSTRUCTION VIBRATION MONITORING.
- p2STEEL H-PILES - USE STEEL FOR H-PILES THAT MEETS THE REQUIREMENTS OF ASTM A 709 GR 50.
- p2PILE LENGTHS - ERRATIC PILE LENGTHS CAN BE EXPECTED.
- p2PILE DRIVING - SHOULD PILES FAIL TO OBTAIN DRIVING RESISTANCE AFTER ACHIEVING THE PILE TIP ELEVATIONS SHOWN, ALLOW PILES TO FREEZE A MINIMUM OF 24 HOURS AND RESTRIKE WITH A WARM HAMMER.
- p2SMOOTH DOWEL BARS - PLACE SMOOTH DOWEL BARS IN FORMED 3” DIAMETER X 12” DEEP HOLES AND GROUT IN PLACE SIMILAR TO ANCHOR BOLTS, SEE SUB-SECTION 501.3.05.B.3 OF THE GEORGIA DOT SPECIFICATIONS. STIRRUPS MAY BE SHIFTED SLIGHTLY FOR FORMED HOLES.
- p2ABUTMENT SOIL REINFORCING DEVICE INSERTS - INCLUDE THE COST OF FURNISHING AND INSTALLING INSERTS FOR SOIL REINFORCING DEVICES AT ABUTMENT IN THE OVERALL BID SUBMITTED...
- p7DO NOT REMOVE EDGE BEAM FORMS UNTIL 72 HOURS AFTER THE DECK POUR IS COMPLETED OR DECK REACHES 28 DAY CONCRETE STRENGTH.
- p7NOTE:
- p7SECTIONS SHOWN ARE FOR LEFT BRIDGE LOOKING AHEAD, RIGHT BRIDGE LOOKING BACK.
Every crop it was read in — the drawing beside what the model took off it
Page 1
p01_r11Notes
- left bridge×1Vertical-clearance requirements and calculations are noted.
- right bridge×1Vertical-clearance requirements and calculations are noted.
23' MINIMUM REQUIRED VERTICAL CLEARANCE23' MINIMUM REQUIRED VERTICAL CLEARANCE2 MINIMUM REQUIRED HORIZONTAL CLEARANCE
p01_r01 plan of twin bridges spanning railroad tracksPlan
- bridge superstructure×2long rectangular plan outlines with skewed endsUpper and lower parallel bridge outlines are visible.
12'-1" minimum dimension74'-7 15/16" dimension75'-10 15/16" dimensionN 22°-23'-16.7" E bearing1'-9 1/2" minimum vertical clearance40'-0" gutter to gutter43'-7" out to out6'-0" spacing+30 more
p01_r08 elevation of bridge spans bents and wingwallsElevation
- bridge superstructure×1linearShown spanning between B.F.P.R. BENT 1, BENT 2, BENT 3, and B.F.P.R. BENT 4.
192'-0" TOTAL LENGTH OF BRIDGE55'-0" span length82'-0" span length55'-0" span lengthEL.151.00 elevation
p01_r09 elevation of bridge spans bents and pile bentsElevation
- bridge superstructure×1continuous horizontal deck/girder profileShown spanning between B.F.P.R. BENT 1 and B.F.P.R. BENT 4, with intermediate BENT 2 and BENT 3.
192'-0" *** TOTAL LENGTH OF BRIDGE55'-0" ***82'-0" ***55'-0" ***151.00 EL.
Page 2
p02_r02Notes
- SuperstructureconcreteConcrete class and strength are listed in design data.
- SubstructureconcreteConcrete class and strength are listed in design data.
TWO WEEKS Vibration monitoring notice period3" Smooth dowel bar hole diameter12" Smooth dowel bar hole depth24 HOURS Minimum pile freeze period2 Seismic performance zone0.142 AS0.155 SDI30 LBS PER SQ FT Future paving allowance+8 more
Page 7
p07_r17 construction notes for edge beam forms and section orientationNotes
- left bridge×1Referenced by section-view orientation note.
- right bridge×1Referenced by section-view orientation note.
72 HOURS minimum time after deck pour before edge beam form removal28 DAY concrete strength age