Matched toFoundation Excavationbridge.approach_earthwork_system.excavationon “Bridge excavation”
| The class asks for | Value | How | From |
|---|---|---|---|
| LengthLwants m/mm | not establishedThe quantity-summary crops identify Bridge excavation, grade separation (211-0200) and give excavation quantities in CY only; they do not state an excavation length. | not found | |
| WidthWwants m/mm | not establishedThe quantity-summary crops do not state an excavation width for pay item 211-0200. | not found | |
| Excavation DepthD_excwants m/mm | not establishedThe quantity-summary crops do not state an excavation depth for pay item 211-0200. | not found | |
| Working SpaceWSwants m/mm | not establishedThe quantity-summary crops do not state working space for pay item 211-0200. | not found | |
| Instance CountNwants count | 2 count1 Left Bridge excavation quantity entry + 1 Right Bridge excavation quantity entry = 2 excavation instances.Both crops list Bridge excavation, grade separation (211-0200) separately for the Left Bridge and Right Bridge, each with a quantity of 295 CY. | derived | p2 · p02_r08p2 · p02_r08 pay item quantity table for left right bridges |
Worked out by openai/gpt-5.6-terra-pro from the readings below, which are the source. A derived value shows its arithmetic — check it against the drawing before it is priced.
How the sheets named it
Every dimension read for it2
- 295 CYLeft bridge quantity, bridge excavationp2 · p02_r08 pay item quantity table for left right bridges
- 295 CYRight bridge quantity, bridge excavationp2 · p02_r08 pay item quantity table for left right bridges
Every crop it was read in — the drawing beside what the model took off it
Page 2
p02_r08
The merge put this crop under the item, but its reading names it differently — open the crop to see what it said.
p02_r08 pay item quantity table for left right bridgesTable
- Bridge excavation, grade separation211-0200Listed for left and right bridge.
35 CY Left bridge quantity, foundation backfill material35 CY Right bridge quantity, foundation backfill material295 CY Left bridge quantity, bridge excavation295 CY Right bridge quantity, bridge excavation811 SY Left bridge quantity, grooved concrete811 SY Right bridge quantity, grooved concreteLUMP LS Left bridge quantity, superstructure concreteLUMP LS Right bridge quantity, superstructure concrete+24 more