Matched toExcavation Shoringbridge.construction_system.shoringon “Temporary Shoring”
The model provider refused the call: the account is out of credit. Top up the OpenRouter key, or lower OPENAI_MAX_TOKENS.
| The class asks for | Unit | A reading with that name | From |
|---|---|---|---|
| LengthL | m/mm | no reading by that name | |
| HeightH | m/mm | no reading by that name | |
| Surface AreaA_surface | m2 | no reading by that name | |
| Material TypeMAT | — | no reading by that name |
Paired on the measurement’s name only, which cannot know that three span lengths sum to the deck length. Step 3 works these out properly for every item it matches — reading every crop behind the item, deriving what the drawings imply and showing its arithmetic. This item has not had that pass yet; the button runs it for this one.
Every dimension read for it3
- 1'-9 1/2" ft-inBearing offsetnot attributedp1 · p01_r01 plan
- STA. 17+29.07Stationnot attributedp1 · p01_r01 plan
- STA. 17+29.07Stationnot attributedp1 · p01_r01
Notes on the sheets that carry it
- p1ALL BENTS ARE F... RAILWAY COMPANY... (text cut off, partial)
- p1END BENT PILES ... (text cut off, partial)
- p1STATIONS ARE AL... AND B.F.P.R. OR ... ELEVATIONS ARE ... PROFILE GRADE LI... PROFILE GRADE LI... (text cut off, partial)
- p1MEASURED ALONG... (text cut off, partial)
- p1LEFT BRIDGE: MINIMUM REQUIRED... EXISTING TRACK V... FUTURE TRACK VE... RIGHT BRIDGE: MINIMUM REQUIRED... EXISTING TRACK V... FUTURE TRACK VE... (text cut off, partial)
- p1MINIMUM REQUIRED... (text cut off, partial)
- p1TEMPORARY SHORING AS NECESSARY, TYP.
- p1TO BE REMOVED
- p1APPROXIMATE EXISTING GROUNDLINE
- p1FUTURE GROUNDLINE
- p1TO US 25/SR 121
- p1TO GA HIGHWAY 23
- p1TO PERKINS
- p1TO MILLEN
- p1AHEAD
- p1BEGIN BRIDGE
- p1END BRIDGE
- p1RR R/W
- p1FRONT FACE OF WALL 1
- p1FRONT FACE OF WALL 2
- p1PGL WESTBOUND
- p1PGL EASTBOUND
- p1RRMP D-0080.54
- p1CHAIN LINK WIRE FENCE, TYP.
- p1EXP.
- p1FIX
Every crop it was read in — the drawing beside what the model took off it
Page 1
p01_r01 planPlan
- temporary shoring×1linearas necessary, typical, near end bridge
192'-0" ft-in Total length of bridge55'-0" ft-in Span 1 length82'-0" ft-in Span 2 length55'-0" ft-in Span 3 length43'-7" ft-in Out to out width40'-0" ft-in Gutter to gutter width81°-20'-05.0" deg-min-sec Skew angle1'-9 1/2" ft-in Bearing offset+20 more
p01_r01Plan
- Temporary shoringCalled out as necessary, typical, near end bridge station
12'-1" MIN clearance to existing track74'-7 5/16" Distance75'-10 5/16" DistanceN 2°-23'-16.7" E Bearing angle1'-9 1/2" Offset6'-0" Offset40'-0" Gutter to gutter width43'-7" Out to out width+18 more