⚠ No class in the bridge ontology fits this itemAdd a class
The ontology would need a structural concrete material class.
How the sheets named it
Every dimension read for it4
- LUMP LSSUPERSTR CONCRETE CL D BR NO-1 LT - LEFT BRIDGEp2 · p02_r05
- 249SUPERSTR CONCRETE CL D BR NO-1 LT referencep2 · p02_r05
- LUMP LSSUPERSTR CONCRETE CL D BR NO-1 RT - RIGHT BRIDGEp2 · p02_r05
- 249SUPERSTR CONCRETE CL D BR NO-1 RT referencep2 · p02_r05
Notes on the sheets that carry it
- p2VIBRATION MONITORING - THE PROJECT ENGINEER SHOULD CONTACT THE GEOTECHNICAL BUREAU OF THE GEORGIA DOT OFFICE OF MATERIALS AND TESTING AT GEOTECHNICAL_SUBMITTALS @DOT.GA.GOV TWO WEEKS PRIOR TO DRIVING PILES. SEE SPECIAL PROVISION 154 - CONSTRUCTION VIBRATION MONITORING.
- p2STEEL H-PILES - USE STEEL FOR H-PILES THAT MEETS THE REQUIREMENTS OF ASTM A 709 GR 50.
- p2PILE LENGTHS - ERRATIC PILE LENGTHS CAN BE EXPECTED.
- p2PILE DRIVING - SHOULD PILES FAIL TO OBTAIN DRIVING RESISTANCE AFTER ACHIEVING THE PILE TIP ELEVATIONS SHOWN, ALLOW PILES TO FREEZE A MINIMUM OF 24 HOURS AND RESTRIKE WITH A WARM HAMMER.
- p2SMOOTH DOWEL BARS - PLACE SMOOTH DOWEL BARS IN FORMED 3" DIAMETER X 12" DEEP HOLES AND GROUT IN PLACE SIMILAR TO ANCHOR BOLTS, SEE SUB-SECTION 501.3.05.B.3 OF THE GEORGIA DOT SPECIFICATIONS. STIRRUPS MAY BE SHIFTED SLIGHTLY TO CLEAR FORMED HOLES.
- p2provide table for 2' above estimated tip elevations
- p2LOAD TEST, STEEL H, HP 12 X 53 (IF REQD)
Every crop it was read in — the drawing beside what the model took off it
Page 2
p02_r01 general notes continuedNotes
- Superstructure (general)reinforced concrete, Class DReferenced in Design Data.
3 in Dowel bar hole diameter12 in Dowel bar hole depth24 hours Minimum freeze time before restrike30 LBS PER SQ FT Future paving allowance4,000 PSI Superstructure concrete strength4,000 PSI Barrier concrete strength3,500 PSI Substructure concrete strength60,000 PSI Reinforcement steel yield strength+5 more
p02_r05Table
- Superstructure concrete500-1011concrete, Class DBr No-1 LT and RT, lump sum items, reference (249)
35 CY FOUND BKFILL MATL TP II - LEFT BRIDGE35 CY FOUND BKFILL MATL TP II - RIGHT BRIDGE295 CY BRIDGE EXCAVATION - LEFT BRIDGE295 CY BRIDGE EXCAVATION - RIGHT BRIDGE811 SY GROOVED CONCRETE - LEFT BRIDGE811 SY GROOVED CONCRETE - RIGHT BRIDGELUMP LS SUPERSTR CONCRETE CL D BR NO-1 LT - LEFT BRIDGE249 SUPERSTR CONCRETE CL D BR NO-1 LT reference+25 more