Matched toSteel H Pilebridge.foundation_system.deep_foundation.pile.steel_hon “Steel H-pile”
| The class asks for | Value | How | From |
|---|---|---|---|
| LengthLwants m/mm | 5260 LF2720 LF (Left Bridge) + 2540 LF (Right Bridge) = 5260 LF.The quantities schedule explicitly identifies both quantities as "PILING IN PLACE, STEEL H, HP 12 X 53." | derived | p2 · p02_r05 title block |
| Cross-sectional AreaAwants m2/mm2 | not establishedThe drawings identify the pile section as HP 12 X 53 but provide no cross-sectional-area property or section geometry from which its area can be calculated without using external section-property data. | not found | |
| Instance CountNwants count | 72 countBent 1 Left/Right: 12 piles; Bent 2 Left: 12 piles; Bent 2 Right: 12 piles; Bent 3 Left: 6 piles in Footing 1 + 6 piles in Footing 2 = 12 piles; Bent 3 Right: 6 piles in Footing 3 + 6 piles in Footing 4 = 12 piles; Bent 4 Left/Right: 12 pile locations (C BEAM 1 through C BEAM 12). Total = 12 + 12 + 12 + 12 + 12 + 12 = 72 piles.The as-built pile schedules and footing layouts identify numbered pile locations for each bent. Each footing shown contains six H-piles; the Bent 4 layout identifies twelve beam/pile locations, C BEAM 1 through C BEAM 12. | derived | p18 · p18_r07 title blockp18 · p18_r02 footing layoutp18 · p18_r03 footing 1p18 · p18_r04 footing 2p18 · p18_r05 footing 3p18 · p18_r06 footing 4 |
| Steel Gradefy | Grade 50, fy = 50,000 PSI -The Design Data block states: "STEEL H-PILES: GRADE 50, fy = 50,000 PSI," and the general note specifies ASTM A 709 Gr 50 steel for H-piles. | read | p2 · p02_r01 general notes continued |
| MassMwants kg/t | 139.39 t (short tons)5260 LF × 53 lb/LF = 278,780 lb; 278,780 lb ÷ 2,000 lb/t = 139.39 t (short tons).The schedule identifies the installed pile as HP 12 X 53 and gives 2720 LF for the Left Bridge and 2540 LF for the Right Bridge. The "53" in the HP 12 X 53 designation is the section nominal weight in lb/LF; total installed length is derived from the two schedule quantities. | derivedcheck | p2 · p02_r05 title block |
Worked out by openai/gpt-5.6-terra-pro from the readings below, which are the source. A derived value shows its arithmetic — check it against the drawing before it is priced.
How the sheets named it
Every dimension read for it16
- STA. 17+29.07Stationnot attributedp1 · p01_r01
- 24 hoursPile freeze timep2 · p02_r01
- 30 LBS PER SQ FTFuture Paving Allowancenot attributedp2 · p02_r01
- 2720 LFPILING IN PLACE STEEL H HP 12X53 - LEFT BRIDGEp2 · p02_r05
- 2540 LFPILING IN PLACE STEEL H HP 12X53 - RIGHT BRIDGEp2 · p02_r05
- 12 X 53Pile size calloutp2 · p02_r05
- 1 EALOAD TEST STEEL H HP 12X53 - LEFT BRIDGEp2 · p02_r05
- 1 EALOAD TEST STEEL H HP 12X53 - RIGHT BRIDGEp2 · p02_r05
- 212 KIPSMaximum factored axial loadp13 · p13_r07
- HP 12 X 53Pile sectionp13 · p13_r07
- 326 KIPSDriving resistancep13 · p13_r07
- 1/4" = 1'-0"Scalenot attributedp13 · p13_r07
- 13 OF 21Bridge sheet numbernot attributedp13 · p13_r07
- 35-0013Drawing numbernot attributedp13 · p13_r07
- 0019181Project numbernot attributedp13 · p13_r07
- 2" DIAMETER HOLESPile connection dimensionp14 · p14_r02 title block
Notes on the sheets that carry it
- p1TO US 25/SR 121
- p1TO GA HIGHWAY 23
- p1TO PERKINS
- p1TO MILLEN
- p1AHEAD
- p1BEGIN BRIDGE
- p1END BRIDGE
- p1TEMPORARY SHORING AS NECESSARY, TYP.
- p1TO BE REMOVED
- p1RR R/W
- p1FRONT FACE OF WALL 1
- p1FRONT FACE OF WALL 2
- p1PGL WESTBOUND
- p1PGL EASTBOUND
- p1RRMP D-0080.54
- p1CHAIN LINK WIRE FENCE, TYP.
- p1FUTURE GROUNDLINE
- p1APPROXIMATE EXISTING GROUNDLINE
- p1EXP.
- p1FIX
- p2VIBRATION MONITORING - THE PROJECT ENGINEER SHOULD CONTACT THE GEOTECHNICAL BUREAU OF THE GEORGIA DOT OFFICE OF MATERIALS AND TESTING AT GEOTECHNICAL_SUBMITTALS @DOT.GA.GOV TWO WEEKS PRIOR TO DRIVING PILES. SEE SPECIAL PROVISION 154 - CONSTRUCTION VIBRATION MONITORING.
- p2STEEL H-PILES - USE STEEL FOR H-PILES THAT MEETS THE REQUIREMENTS OF ASTM A 709 GR 50.
- p2PILE LENGTHS - ERRATIC PILE LENGTHS CAN BE EXPECTED.
- p2PILE DRIVING - SHOULD PILES FAIL TO OBTAIN DRIVING RESISTANCE AFTER ACHIEVING THE PILE TIP ELEVATIONS SHOWN, ALLOW PILES TO FREEZE A MINIMUM OF 24 HOURS AND RESTRIKE WITH A WARM HAMMER.
- p2SMOOTH DOWEL BARS - PLACE SMOOTH DOWEL BARS IN FORMED 3" DIAMETER X 12" DEEP HOLES AND GROUT IN PLACE SIMILAR TO ANCHOR BOLTS, SEE SUB-SECTION 501.3.05.B.3 OF THE GEORGIA DOT SPECIFICATIONS. STIRRUPS MAY BE SHIFTED SLIGHTLY TO CLEAR FORMED HOLES.
- p2provide table for 2' above estimated tip elevations
- p2FILL SETTLEMENT - PROTECT PILES DRIVEN AT BENTS 1 AND 4 FROM NEGATIVE SKIN FRICTION WHEN USED IN CONJUNCTION WITH MECHANICALLY STABILIZED EARTH WALLS, SEE SECTION 551 OF THE GEORGIA DOT SPECIFICATIONS. DRIVE PILES AT END BENTS BEFORE WALL LEVELING PADS ARE CONSTRUCTED.
- p2SPECIAL PROTECTIVE COATING - CLEAN AND PAINT PILES AND SWAYBRACING WITH SPECIAL PROTECTIVE COATING NO. 2P IN ACCORDANCE WITH SECTIONS 520 AND 535 OF THE GEORGIA DOT SPECIFICATIONS.
- p2EXTEND COATING FROM TOP OF PILE TO 2FT BELOW GROUND FOR END BENT PILING.
- p2EXTEND COATING FROM BOTTOM OF CAP OR PEDESTAL FOOTING TO 5FT BELOW GROUND FOR INTERMEDIATE BENT PILING, REGARDLESS OF ENCASEMENT.
- p2SPECIFICATIONS ------------------------------------- AASHTO LRFD 9TH EDITION, 2020 (DESIGNED FOR SEISMIC PERFORMANCE ZONE 2, AS=0.142, SDI=0.155)
- p2DESIGN VEHICLE LIVE LOAD --------------------------------------------------- HL-93
- p2FUTURE PAVING ALLOWANCE --------------------------------------------- 30 LBS PER SQ FT
- p2CONCRETE: SUPERSTRUCTURE ------------------------------------- CLASS D, f'c = 4,000 PSI
- p2BARRIER-------------------------------------- CLASS D, f'c = 4,000 PSI
- p2PSC BEAMS ------------------------- CLASS AAA, f'c = SEE BEAM SHEETS
- p2PSC BEAM ALLOWABLE TENSION ----------------------- SEE BEAM SHEETS
- p2SUBSTRUCTURE ------------------------------- CLASS AA, f'c = 3,500 PSI
- p2REINFORCING STEEL: --------------------------------- GRADE 60, fy = 60,000 PSI
- p2PRETENSIONING STRANDS: ------------------------------------- f's = 270,000 PSI
Every crop it was read in — the drawing beside what the model took off it
Page 1
p01_r01Plan
- PileShown schematically under Bent 2 and Bent 3 in elevation view
12'-1" MIN clearance to existing track74'-7 5/16" Distance75'-10 5/16" DistanceN 2°-23'-16.7" E Bearing angle1'-9 1/2" Offset6'-0" Offset40'-0" Gutter to gutter width43'-7" Out to out width+18 more
Page 2
p02_r01 general notes continuedNotes
- Steel H-PileH-sectionstructural steelReferenced in general notes; ASTM A709 Gr 50; erratic lengths expected; driving/restrike procedure described.
3 in Dowel bar hole diameter12 in Dowel bar hole depth24 hours Minimum freeze time before restrike30 LBS PER SQ FT Future paving allowance4,000 PSI Superstructure concrete strength4,000 PSI Barrier concrete strength3,500 PSI Substructure concrete strength60,000 PSI Reinforcement steel yield strength+5 more
p02_r05 title blockSchedule
- PileHP 12 X 53H-sectionstructural steelsteel H piling in place; quantity given in LF
35 CY FOUND BKFILL MATL, TP II35 CY FOUND BKFILL MATL, TP II295 CY BRIDGE EXCAVATION, GRADE SEPARATION295 CY BRIDGE EXCAVATION, GRADE SEPARATION811 SY GROOVED CONCRETE811 SY GROOVED CONCRETELUMP LS SUPERSTR CONCRETE, CL D, BR NO-1 LTLUMP LS SUPERSTR CONCRETE, CL D, BR NO-1 RT+22 more
p02_r06 notesNotes
- pilePiles driven at Bents 1 and 4, referenced in note text only
p02_r16 notesNotes
- pileEnd bent and intermediate bent piling referenced regarding special protective coating extents
2 FT Coating extent below ground - end bent piling5 FT Coating extent below ground - intermediate bent piling
p02_r01Notes
- Steel H-PileH-sectionstructural steel, ASTM A709 Gr 50Referenced in general notes and design data table; not graphically depicted in this crop.
* Bent Number***.** Pile Tip Elevation3 in Dowel hole diameter12 in Dowel hole depth24 hours Pile freeze time30 LBS PER SQ FT Future Paving Allowance4,000 PSI Superstructure Concrete Strength4,000 PSI Barrier Concrete Strength+5 more
p02_r05Table
- Steel H pile520-1125H-sectionstructural steelHP 12 X 53, in place piling
- Load test pile520-4125H-sectionstructural steelHP 12 X 53, if required
35 CY FOUND BKFILL MATL TP II - LEFT BRIDGE35 CY FOUND BKFILL MATL TP II - RIGHT BRIDGE295 CY BRIDGE EXCAVATION - LEFT BRIDGE295 CY BRIDGE EXCAVATION - RIGHT BRIDGE811 SY GROOVED CONCRETE - LEFT BRIDGE811 SY GROOVED CONCRETE - RIGHT BRIDGELUMP LS SUPERSTR CONCRETE CL D BR NO-1 LT - LEFT BRIDGE249 SUPERSTR CONCRETE CL D BR NO-1 LT reference+25 more
p02_r06Notes
- pilePiles driven at Bents 1 and 4, referenced in note text regarding negative skin friction protection
p02_r16Notes
- pileReferenced in note regarding protective coating; end bent and intermediate bent piling
2 FT Coating extension5 FT Coating extension
Page 13
p13_r02 at eq spsElevation
- Pile×6rectangular (in elevation)reinforced concrete (implied)Vertical members below cap beam, shown with dashed centerlines, spaced at intervals
189.16 EL.189.23 EL.185.75 EL.185.65 EL.185.52 EL.185.39 EL.185.26 EL.185.10 EL.+14 more
p13_r03 at eq spsElevation
- Pile×6rectangular (dashed, hidden)reinforced concreteShown dashed below cap at regular spacing, aligned with vertical stirrup groups
188.03 ft Top elevation188.10 ft Top elevation184.75 ft Top elevation184.96 ft Top elevation185.13 ft Top elevation185.30 ft Top elevation185.47 ft Top elevation185.62 ft Top elevation+12 more
p13_r05 section b bSection
- Pile×2circularTwo piles shown below cap in both sections, broken line indicates continuation
3'-0" ft-in Cap width2" MIN. in Clear cover2'-0" ft Vertical dimension1'-0" ft Typical spacing2" CL. 3 SIDES in Side clearance1'-6" ft-in Half width1'-6" ft-in Half width3/4" = 1'-0" Scale+4 more
p13_r07 title blockTitle Block
- PileH-sectionstructural steelHP 12 X 53, referenced in general notes; not depicted graphically in this crop
212 KIPS Maximum factored axial load326 KIPS Driving resistance139 Minimum tip elevation125 Minimum tip elevation12.0 CY CY Class AA Concrete12.0 CY CY Class AA Concrete1434 LB LB Bar Reinf Steel1434 LB LB Bar Reinf Steel+4 more
p13_r02Elevation
- pile×6rectangular/squarereinforced concreteShown below cap beam with dashed centerlines, spaced at 7'-7 1/16" typical intervals, each with 10" TYP. dimension at top
189.16 Elevation189.23 Elevation185.75 Elevation185.65 Elevation185.52 Elevation185.39 Elevation185.26 Elevation185.10 Elevation+12 more
p13_r03Elevation
- Pile×6rectangular/squarereinforced concretePiles shown with dashed centerlines extending below cap at regular spacing
188.03 ft Elevation188.10 ft Elevation184.75 ft Elevation184.96 ft Elevation185.13 ft Elevation185.30 ft Elevation185.47 ft Elevation185.62 ft Elevation+16 more
p13_r07Title Block
- pileH-sectionstructural steelHP 12 X 53 piles, referenced in notes for Bent 1L and Bent 1R
212 KIPS Maximum factored axial loadHP 12 X 53 Pile section326 KIPS Driving resistance139 Minimum tip elevation125 Minimum tip elevation12.0 CY CY Class AA Concrete12.0 CY CY Class AA Concrete1434 LB LB Bar Reinf Steel+5 more
Page 14
p14_r02 title blockElevation
- pileHP12X53H-sectionstructural steelReferenced in pile connection detail and general notes; not directly drawn in elevation view
185.78 ft Bent cap top elevation185.23 ft Bent cap top elevation185.96 ft Bent cap top elevation185.41 ft Bent cap top elevation186.10 ft Bent cap top elevation185.55 ft Bent cap top elevation186.24 ft Bent cap top elevation185.70 ft Bent cap top elevation+68 more
p14_r02Elevation
- PileH-PILEH-sectionstructural steelHP 12 X 53 steel H-piles, shown in Pile Connection Detail
44-421 Span between column centers185.78 ft Elevation top of cap (BK)185.23 ft Elevation top of cap (AH)185.96 ft Elevation top of cap (BK)185.41 ft Elevation top of cap (AH)186.10 ft Elevation top of cap (BK)185.55 ft Elevation top of cap (AH)186.24 ft Elevation top of cap (BK)+59 more
Page 16
p16_r02 footing plan bent 3Detail
- Pile×6Shown as small cross-hatch symbols labeled C PILE in footing plan, 2 rows of 3
4'-3" ft-in width2'-1 1/2" ft-in spacing11 1/2" in spacing1'-2" ft-in spacing4'-0" ft height9" in depth2" in clearance2" in clearance+13 more
p16_r05 footing plan bent 2Plan
- Pile×6H-section (symbol shown as I-shaped mark)Arranged in two rows of three along the footing, spaced per centerline dimensions; labeled 'C PILE' (centerline of pile)
11'-6" ft-in Overall width11'-6" ft-in Overall length1'-3" ft-in Edge to pile row (top)4'-6" ft-in Pile spacing (horizontal)4'-6" ft-in Pile spacing (horizontal)1'-3" ft-in Edge to pile row (bottom)1'-3" ft-in Edge to pile row (left)4'-6" ft-in Pile spacing (vertical)+3 more
p16_r02Detail
- Pile×6not detailed in plan (shown as small H-marks)Piles shown along two rows in Footing Plan - Bent 3, spaced 1'-3", 5'-3", 5'-3", 1'-3"
4'-3" Width2'-1 1/2" Half width to centerline bent11 1/2" Segment1'-2" Segment2" Clear cover4'-0" MIN. Height9" Bottom segment2" Clear cover+13 more
p16_r05Plan
- pile×6circularShown as symbol with centerline; arranged in two rows of three, marked with centerline callout '℄ PILE'
11'-6" ft-in Overall width11'-6" ft-in Overall length1'-3" ft-in Edge distance (top, left)4'-6" ft-in Pile spacing (top)4'-6" ft-in Pile spacing (top)1'-3" ft-in Edge distance (top, right)1'-3" ft-in Edge distance (left, top)4'-6" ft-in Pile spacing (left)+3 more
Page 17
p17_r03 at eq spsElevation
- Pile×5rectangular (shown in section as vertical hatched element)reinforced concretePiles shown beneath cap at regular spacing, with dashed vertical centerlines; each pile has ties marked 4-440
188.39 ft Elevation top left column outer188.45 ft Elevation top left column inner185.12 ft Elevation cap top at left185.32 ft Elevation cap top185.49 ft Elevation cap top185.66 ft Elevation cap top185.82 ft Elevation cap top185.96 ft Elevation cap top+12 more
p17_r07 title blockTitle Block
- PileH-sectionstructural steelHP 12 X 53 steel H piles, referenced in notes for End Bent 4
212 KIPS Maximum factored axial loadHP 12 X 53 Pile section326 KIPS Driving resistance122 Minimum tip elevation144 Minimum tip elevation12.0 CY CY Class AA Concrete12.0 CY CY Class AA Concrete1434 LB LB Bar Reinf Steel+6 more
p17_r02Elevation
- Pile×5circular/square (shown schematically with dashed centerline and X)not statedPiles shown below cap at regular intervals, spacing dimensions given as 10" and 7'-7 1/16" bays
189.42 Elevation189.50 Elevation186.04 Elevation185.93 Elevation185.80 Elevation185.67 Elevation185.53 Elevation185.37 Elevation+13 more
p17_r03Elevation
- Pile×5rectangular/vertical, shown with hatched cross bracing symbolunspecified (likely concrete or steel)Five intermediate vertical piles shown below cap beam, spaced at repeating intervals, each with a '4-440 OVER EACH PILE' bar callout
188.39 Elevation188.45 Elevation185.12 Elevation185.32 Elevation185.49 Elevation185.66 Elevation185.82 Elevation185.96 Elevation+14 more
Page 18
p18_r02 footing layoutPlan
- Pile×36H-sectionstructural steel (implied by H symbol)Numbered piles 1-12 repeated across Footings 1-4 and Bent 4 Left/Right beam locations; exact count approximate based on visible symbols
- Pile×2vertical, driven (section symbol)unspecifiedShown in the small 'FOOTING LAYOUT' cross-section beneath the footing
p18_r03 footing 1Plan
- Pile1×1H-sectionstructural steelPile location marked with 'H' symbol, numbered 1
- Pile2×1H-sectionstructural steelLocated on centerline of Bent 2
- Pile3×1H-sectionstructural steel
- Pile4×1H-sectionstructural steel
- Pile5×1H-sectionstructural steelLocated on centerline of Bent 2
- Pile6×1H-sectionstructural steel
p18_r04 footing 2Plan
- pile7,8,9,10,11,12×6H-sectionstructural steelSix H-piles arranged in two rows of three within the footing outline, each labeled with a pile number
p18_r05 footing 3Plan
- Pile×6H-sectionstructural steelSix H-piles arranged in two rows of three, numbered 1–6, at footing corners/midpoints
p18_r06 footing 4Plan
- pile×6H-sectionstructural steelSix H-pile symbols located at points 7,8,9,10,11,12 within the footing outline
p18_r07 title blockSchedule
- PileBent 1 Left / 1 Right×12Listed by Beam 1-12 with Pile No. 1-12; Pile Tip Elevation column blank
- PileBent 2 Left, Footing 1 & 2×12Pile No. 1-12 under Footing 1 and Footing 2; Pile Tip Elevation and Bottom of Footing Elevation columns blank
- PileBent 2 Right, Footing 3 & 4×12Pile No. 1-12 under Footing 3 and Footing 4; elevation columns blank
- PileBent 3 Left, Footing 1 & 2×12Pile No. 1-12 under Footing 1 and Footing 2; elevation columns blank
p18_r02Plan
- Pile1-12 (Bent 3 Left/Right)×24H-sectionstructural steelH-piles shown at corners/mid of footings 1-4, per bent
- Pile1-12 (Bent 4 Left/Right)×24Piles along beam centerlines 1-12, marked with small cross symbols; shape not clearly drawn
- Pile×2dashed/hidden (vertical)Piles shown in Footing Layout detail below footing
p18_r03Plan
- Pile×6H-sectionstructural steelPiles numbered 1-6, positioned at corners and midpoints of footing, marked with 'H' symbol indicating H-pile section
p18_r04Plan
- pile7×1H-sectionstructural steelLocated at corner of footing
- pile8×1H-sectionstructural steelLocated on centerline of footing, top edge
- pile9×1H-sectionstructural steelLocated at corner of footing
- pile10×1H-sectionstructural steelLocated at corner of footing
- pile11×1H-sectionstructural steelLocated on centerline of footing, bottom edge
- pile12×1H-sectionstructural steelLocated at corner of footing
p18_r05Plan
- pile1-6×6H-sectionstructural steelMarked with 'H' symbol, numbered 1 through 6 at footing corners and midpoints.
p18_r06Plan
- pile×6H-sectionstructural steelSix H-shaped piles arranged in two rows of three beneath footing, numbered 7-12
p18_r07Table
- Pile1-12×48Pile numbers 1 through 12 repeated in each of four bent tables (1 LEFT/1 RIGHT combined, 2 LEFT, 2 RIGHT, 3 LEFT); tip elevation and bottom-of-footing elevation columns are blank (as-built data not yet filled in)