Drawing to BOQpipeline control sheet
← Mindmapwhat the drawings said

Mechanically Stabilized Earth Wall

1 page · 1 crop · substructure

Matched toReinforced Soil Wallbridge.approach_earthwork_system.reinforced_soil_wallon “Mechanically Stabilized Earth Wall

0 of 4 required measurements have a number

The model provider refused the call: the account is out of credit. Top up the OpenRouter key, or lower OPENAI_MAX_TOKENS.

The class asks forUnitA reading with that nameFrom
LengthLm/mmno reading by that name
HeightHm/mmno reading by that name
Surface AreaA_surfacem2no reading by that name
Instance CountNcountno reading by that name

Paired on the measurement’s name only, which cannot know that three span lengths sum to the deck length. Step 3 works these out properly for every item it matches — reading every crop behind the item, deriving what the drawings imply and showing its arithmetic. This item has not had that pass yet; the button runs it for this one.

Notes on the sheets that carry it

  • p2FILL SETTLEMENT - PROTECT PILES DRIVEN AT BENTS 1 AND 4 FROM NEGATIVE SKIN FRICTION WHEN USED IN CONJUNCTION WITH MECHANICALLY STABILIZED EARTH WALLS, SEE SECTION 551 OF THE GEORGIA DOT SPECIFICATIONS. DRIVE PILES AT END BENTS BEFORE WALL LEVELING PADS ARE CONSTRUCTED.

Every crop it was read in — the drawing beside what the model took off it

Page 2

crop

p02_r06

page 2 · other_p02_r06
Original
p02_r06
{
  "view": "Notes",
  "objects": [
    {
      "name": "pile",
      "tag": "",
      "shape": "",
      "material": "",
      "count": null,
      "note": "Piles driven at Bents 1 and 4, referenced in note text regarding negative skin friction protection"
    },
    {
      "name": "bent",
      "tag": "1",
      "shape": "",
      "material": "",
      "count": null,
      "note": "Referenced as location where piles are driven"
    },
    {
      "name": "bent",
      "tag": "4",
      "shape": "",
      "material": "",
      "count": null,
      "note": "Referenced as location where piles are driven"
    },
    {
      "name": "mechanically stabilized earth wall",
      "tag": "",
      "shape": "",
      "material": "",
      "count": null,
      "note": "Referenced in conjunction with pile protection from negative skin friction"
    }
  ],
  "measurements": [],
  "notes": [
    "FILL SETTLEMENT - PROTECT PILES DRIVEN AT BENTS 1 AND 4 FROM NEGATIVE SKIN FRICTION WHEN USED IN CONJUNCTION WITH MECHANICALLY STABILIZED EARTH WALLS, SEE SECTION 551 OF THE GEORGIA DOT SPECIFICATIONS. DRIVE PILES AT END BENTS BEFORE WALL LEVELING PADS ARE CONSTRUCTED."
  ],
  "labels": [],
  "description": "This crop contains a single construction note addressing fill settlement and pile protection requirements at Bents 1 and 4, referencing Georgia DOT Specification Section 551 for mechanically stabilized earth wall interaction with piles. It instructs that piles at end bents be driven before wall leveling pads are constructed. No drawn objects, dimensions, or graphical elements are present in this crop, only text."
}

p02_r06Notes

  • mechanically stabilized earth wallReferenced in conjunction with pile protection from negative skin friction