Matched toStructural Backfillbridge.approach_earthwork_system.structural_backfillon “Foundation backfill”
The model provider refused the call: the account is out of credit. Top up the OpenRouter key, or lower OPENAI_MAX_TOKENS.
| The class asks for | Unit | A reading with that name | From |
|---|---|---|---|
| VolumeV | m3 | no reading by that name | |
| Material TypeMAT | — | no reading by that name |
Paired on the measurement’s name only, which cannot know that three span lengths sum to the deck length. Step 3 works these out properly for every item it matches — reading every crop behind the item, deriving what the drawings imply and showing its arithmetic. This item has not had that pass yet; the button runs it for this one.
How the sheets named it
Every dimension read for it2
- 35 CYFOUND BKFILL MATL TP II - LEFT BRIDGEp2 · p02_r05
- 35 CYFOUND BKFILL MATL TP II - RIGHT BRIDGEp2 · p02_r05
Notes on the sheets that carry it
- p2LOAD TEST, STEEL H, HP 12 X 53 (IF REQD)
Every crop it was read in — the drawing beside what the model took off it
Page 2
p02_r05Table
- Foundation backfill material207-0203granular/backfillType II
35 CY FOUND BKFILL MATL TP II - LEFT BRIDGE35 CY FOUND BKFILL MATL TP II - RIGHT BRIDGE295 CY BRIDGE EXCAVATION - LEFT BRIDGE295 CY BRIDGE EXCAVATION - RIGHT BRIDGE811 SY GROOVED CONCRETE - LEFT BRIDGE811 SY GROOVED CONCRETE - RIGHT BRIDGELUMP LS SUPERSTR CONCRETE CL D BR NO-1 LT - LEFT BRIDGE249 SUPERSTR CONCRETE CL D BR NO-1 LT reference+25 more