Matched toApproach Embankmentbridge.approach_earthwork_system.embankmenton “Endfill”
The model provider refused the call: the account is out of credit. Top up the OpenRouter key, or lower OPENAI_MAX_TOKENS.
| The class asks for | Unit | A reading with that name | From |
|---|---|---|---|
| LengthL | m/mm | no reading by that name | |
| Cross-sectional AreaA | m2/mm2 | no reading by that name | |
| Material TypeMAT | — | no reading by that name | |
| SlopeSLOPEoptional | ratio/percent | no reading by that name |
Paired on the measurement’s name only, which cannot know that three span lengths sum to the deck length. Step 3 works these out properly for every item it matches — reading every crop behind the item, deriving what the drawings imply and showing its arithmetic. This item has not had that pass yet; the button runs it for this one.
How the sheets named it
Every dimension read for it3
- 15'-0" ft-inDistance from Ç Future Track to first dimension linenot attributedp1 · p01_r03
- 4'-0" ft-inHorizontal offset dimensionnot attributedp1 · p01_r03
- 2'-0" ft-inHorizontal offset dimensionnot attributedp1 · p01_r03
Notes on the sheets that carry it
- p1TOP OF HIGH RAIL, TYP.
- p1ENDFILL CONTROL POINT, TYP.
- p1* NORMAL TO RR ℄
- p1NO SCALE
- p1Ç FUTURE TRACK
- p22 - 55'-0" AASHTO TYPE II PSC BEAM SPANS --- SPECIAL DESIGN
- p21 - 82'-0" AASHTO TYPE III PSC BEAM SPAN --- SPECIAL DESIGN
- p22 - STEEL H PILE END BENTS WITH MSE WALL ABUTMENTS --- SPECIAL DESIGN
- p22 - CONCRETE INTERMEDIATE BENTS --- SPECIAL DESIGN
- p24 - END POST AND GUARDRAIL ATTACHMENT DETAIL --- GA. STD. 3054 (9-30-02)
- p2(L = 4'-3"; W = 1'-1"; H = 3'-6")
- p2(L = 4'-6"; W = 1'-1"; H = 3'-6")
- p2BAR BENDING DETAILS --- GA. STD. 3901 (8-69)
- p2CHAIN LINK WIRE FENCE --- GA. STD. 9031N (8-13-85)
- p2TYPICAL FILL DETAIL AT END OF BRIDGE --- GA. STD. 9037 (9-99)
Every crop it was read in — the drawing beside what the model took off it
Page 1
p01_r03 endfill control diagramDetail
- Endfill slope / embankment×1trapezoidal cross-sectionearth fillDiagram shows a ditch/slope profile from track down to endfill control point
- Endfill control point×1point (line intersection)Typical point marking slope control, referenced 'TYP.'
15'-0" ft-in Distance from centerline future track to first dimension line4'-0" ft-in Second horizontal segment width2'-0" ft-in Third horizontal segment width4'-9" ft-in Vertical drop to top of high rail reference1:2 Slope ratio
p01_r03Detail
- Endfill slope×1tapered/sloped embankmentSloped fill from top of high rail down to endfill control point at 1:2 slope
- Endfill control point×1pointMarks toe/edge of endfill slope, typical
15'-0" ft-in Distance from Ç Future Track to first dimension line4'-0" ft-in Horizontal offset dimension2'-0" ft-in Horizontal offset dimension4'-9" ft-in Vertical dimension to top of high rail, typical1:2 Slope ratio
Page 2
p02_r02 typical fill detail at end of bridge gaNotes
- fill detail at end of bridgePer GA. STD. 9037 (9-99)
55'-0" Span length82'-0" Span length4'-3" Length1'-1" Width3'-6" Height4'-6" Length1'-1" Width3'-6" Height
p02_r02Notes
- fill detail at end of bridgetypical detail per GA. STD. 9037 (9-99)
55'-0" ft-in span length82'-0" ft-in span length4'-3" ft-in end post/guardrail attachment dimension L1'-1" ft-in end post/guardrail attachment dimension W3'-6" ft-in end post/guardrail attachment dimension H4'-6" ft-in end post/guardrail attachment dimension L1'-1" ft-in end post/guardrail attachment dimension W3'-6" ft-in end post/guardrail attachment dimension H