Drawing to BOQpipeline control sheet
← Mindmapwhat the drawings said

Approach Slab

1 page · 2 crops · deck

Matched toApproach Slabbridge.approach_earthwork_system.approach_slabon “Approach Slab

0 of 5 required measurements have a number

The model provider refused the call: the account is out of credit. Top up the OpenRouter key, or lower OPENAI_MAX_TOKENS.

The class asks forUnitA reading with that nameFrom
LengthLm/mmno reading by that name
WidthWm/mmno reading by that name
ThicknessTm/mmno reading by that name
Instance CountNcountno reading by that name
Concrete Gradefckno reading by that name

Paired on the measurement’s name only, which cannot know that three span lengths sum to the deck length. Step 3 works these out properly for every item it matches — reading every crop behind the item, deriving what the drawings imply and showing its arithmetic. This item has not had that pass yet; the button runs it for this one.

Notes on the sheets that carry it

  • p2STANDARD PLAN MODIFICATION - MODIFY THE APPROACH SLAB STANDARD TO INCREASE THE 3/4" EXPANSION JOINT SHOWN BETWEEN THE APPROACH SLAB AND THE BACK FACE PAVING REST AND END POST TO 1 3/8" AT BENT 1 AND 4.
  • p2KEEP THE EXPANSION JOINT AT END BENT CONTINUOUS AROUND END POST.
  • p2INCLUDE COST OF JOINT IN APPROACH SLAB PAYMENT.
  • p2SEE ROADWAY PLANS FOR APPROACH SLAB PAYMENT.
  • p2STANDARD PLAN MODIFICATION - MODIFY THE APPROACH SLAB STANDARD TO INCREASE THE 3/4" EXPANSION JOINT SHOWN BETWEEN THE APPROACH SLAB AND THE BACK FACE PAVING REST AND END POST TO 1 3/8" AT BENT 1 AND 4. KEEP THE EXPANSION JOINT AT END BENT CONTINUOUS AROUND END POST. INCLUDE COST OF JOINT IN APPROACH SLAB PAYMENT. SEE ROADWAY PLANS FOR APPROACH SLAB PAYMENT.

Every crop it was read in — the drawing beside what the model took off it

Page 2

crop

p02_r09 standard plan modification modify the ap

page 2 · gdot_plan_649084f395824aaebf1f5ed48132696f_p02_r09_standard_plan_modification_modify_the_ap
Original
p02_r09 standard plan modification modify the ap
{
  "view": "Notes",
  "objects": [
    {
      "name": "Approach slab",
      "tag": "",
      "shape": "",
      "material": "",
      "count": null,
      "note": "Referenced in note text; standard plan modification applies to this element"
    },
    {
      "name": "Expansion joint",
      "tag": "",
      "shape": "",
      "material": "",
      "count": null,
      "note": "Joint between approach slab and back face paving rest and end post, dimension increased per note"
    },
    {
      "name": "End post",
      "tag": "",
      "shape": "",
      "material": "",
      "count": null,
      "note": "Referenced as part of joint location"
    },
    {
      "name": "Bent",
      "tag": "1",
      "shape": "",
      "material": "",
      "count": null,
      "note": "Location where joint width is increased"
    },
    {
      "name": "Bent",
      "tag": "4",
      "shape": "",
      "material": "",
      "count": null,
      "note": "Location where joint width is increased"
    }
  ],
  "measurements": [
    {
      "label": "Expansion joint width (original)",
      "value": "3/4",
      "unit": "in",
      "appliesTo": "Approach slab expansion joint"
    },
    {
      "label": "Expansion joint width (revised)",
      "value": "1 3/8",
      "unit": "in",
      "appliesTo": "Approach slab expansion joint at Bent 1 and 4"
    }
  ],
  "notes": [
    "STANDARD PLAN MODIFICATION - MODIFY THE APPROACH SLAB STANDARD TO INCREASE THE 3/4\" EXPANSION JOINT SHOWN BETWEEN THE APPROACH SLAB AND THE BACK FACE PAVING REST AND END POST TO 1 3/8\" AT BENT 1 AND 4.",
    "KEEP THE EXPANSION JOINT AT END BENT CONTINUOUS AROUND END POST.",
    "INCLUDE COST OF JOINT IN APPROACH SLAB PAYMENT.",
    "SEE ROADWAY PLANS FOR APPROACH SLAB PAYMENT."
  ],
  "labels": [],
  "description": "This crop contains a block of general construction notes (no drawn geometry) describing a standard plan modification for the approach slab expansion joint detail at Bent 1 and Bent 4. It specifies the change in joint width from 3/4 inch to 1 3/8 inch, instructions to keep the joint continuous around the end post, and payment/cost inclusion guidance referencing roadway plans."
}

p02_r09 standard plan modification modify the apNotes

  • Approach slabReferenced in note text; standard plan modification applies to this element

3/4 in Expansion joint width (original)1 3/8 in Expansion joint width (revised)

crop

p02_r09

page 2 · other_p02_r09
Original
p02_r09
{
  "view": "Notes",
  "objects": [
    {
      "name": "approach slab",
      "tag": "",
      "shape": "",
      "material": "",
      "count": null,
      "note": "Referenced in note regarding expansion joint modification at Bent 1 and 4"
    },
    {
      "name": "expansion joint",
      "tag": "",
      "shape": "",
      "material": "",
      "count": null,
      "note": "Between approach slab and back face paving rest and end post"
    },
    {
      "name": "end post",
      "tag": "",
      "shape": "",
      "material": "",
      "count": null,
      "note": "Expansion joint continuous around end post"
    }
  ],
  "measurements": [
    {
      "label": "Existing expansion joint width",
      "value": "3/4",
      "unit": "in",
      "appliesTo": "expansion joint (standard, prior to modification)"
    },
    {
      "label": "Modified expansion joint width",
      "value": "1 3/8",
      "unit": "in",
      "appliesTo": "expansion joint at Bent 1 and 4"
    }
  ],
  "notes": [
    "STANDARD PLAN MODIFICATION - MODIFY THE APPROACH SLAB STANDARD TO INCREASE THE 3/4\" EXPANSION JOINT SHOWN BETWEEN THE APPROACH SLAB AND THE BACK FACE PAVING REST AND END POST TO 1 3/8\" AT BENT 1 AND 4. KEEP THE EXPANSION JOINT AT END BENT CONTINUOUS AROUND END POST. INCLUDE COST OF JOINT IN APPROACH SLAB PAYMENT. SEE ROADWAY PLANS FOR APPROACH SLAB PAYMENT."
  ],
  "labels": [],
  "description": "This crop contains a single printed note block describing a standard plan modification to the approach slab detail, specifying an increase in expansion joint width at Bent 1 and 4 and clarifying payment responsibility. No drawn objects, dimensions figures, or graphical elements are shown, only the note text."
}

p02_r09Notes

  • approach slabReferenced in note regarding expansion joint modification at Bent 1 and 4

3/4 in Existing expansion joint width1 3/8 in Modified expansion joint width