processed
PDF files1
Pages21
Objects185
Processing100%
main viewer
Selected page objects
Bridge Composition Summary90%+
Fill Settlement And Pile Driving Note For End Bents90%+
Notes90%+
Title Block90%+
General Construction Notes90%+
General Construction Notes90%+
Steel Diaphragms90%+
Approach Slab Expansion Joint90%+
Bridge Span Composition List90%+
Design Criteria And Material Data90%+
Dynamic Pile Testing Requirement90%+
Pile Driving Resistance Requirement90%+
Reinforcing Steel90%+
Wave Equation Analysis Requirement90%+
Chain Link Fence65%
Grooved Concrete Deck65%
Railroad Side Ditches65%
Bridge Design Notes And Design Data62%
Concrete Edge Chamfer60%
Bridge No. 1 Lt And Rt60%
Specifications Reference60%
Traffic Data Summary60%
Protective Platform Note55%
Welding And Steel Diaphragm Notes55%cropped image preview
CloseNotes
- Object
- Notes
- Explanation
- note on abutment soil reinforcing device inserts bid inclusion
- View
- notes
- Structure
- bridge over SR 21
- Part of structure
- substructure - abutment
- Shows
- n/a
- Component
- notes
- Identifier
- n/a
- Section
- n/a
- Drawing no.
- 35-0002
- Scale
- NO SCALE
- Discipline
- structural
- Accuracy
- 90%+
- Tier
- balanced
- Page
- 458
- Bounding box
- 0.349, 0.249, 0.651, 0.293
- Remarks
- No validated same-instance relation.
- QA comments
- review_required=False; mapping_relation=unresolved_singleton
- Linked tables
- n/a
- Cloudinary URL
- Open image
Raw extracted data
{
"id": 6311,
"type": "",
"view-angle": "none",
"bbox": [
0.34857058823529413,
0.24906363636363638,
0.6514294117647059,
0.2932090909090909
],
"confidence_score": 0.9,
"remarks": "No validated same-instance relation.",
"qa-comments": "review_required=False; mapping_relation=unresolved_singleton",
"column": "notes",
"url": "https://res.cloudinary.com/laiuauox/image/upload/v1786289222/edapro/gdot_plan-ab5a9057847f41e3bb9d0ead3c6f2c22/items/notes_p02_r06.png",
"item_key": "notes_p02_r06",
"label": "Notes",
"caption": "note on abutment soil reinforcing device inserts bid inclusion",
"view_type": "notes",
"section_label": null,
"region_kind": "notes",
"drawing_number": "35-0002",
"scale": "NO SCALE",
"area": "abutment",
"structure": "bridge over SR 21",
"structure_part": "substructure - abutment",
"elements": [],
"identifiers": null,
"referenced_sheets": [],
"uncertainty_codes": [],
"tier": "balanced",
"identifier": null,
"discipline": "structural",
"view_types": [
"notes"
],
"linked_notes": null,
"linked_tables": null,
"shape_summary": {
"polygon": 3,
"total": 3
},
"merged_from": null,
"page_id": 458,
"file_id": 103,
"project_id": "6a788463377a164a971715d7",
"token_count": 2838422
}