Back to projects
Structural Drawings_Pkg-1.pdf
civil engineering drawings: bridges, highways, rail, structural, drainage, utilities, survey, geotechnical, grading, and site works · Not set
processed
PDF files1
Pages3
Objects6
Processing0%
main viewer
Selected page objects
cropped image preview
CloseKEY PLAN
- Object
- KEY PLAN
- Explanation
- Balanced tier — this crop was not individually reviewed by the AI; the name comes from the drawing’s own text.
- View
- other
- Structure
- n/a
- Part of structure
- n/a
- Shows
- n/a
- Component
- other
- Identifier
- n/a
- Section
- n/a
- Drawing no.
- n/a
- Scale
- n/a
- Discipline
- other
- Accuracy
- 35%
- Tier
- balanced
- Page
- 455
- Bounding box
- n/a
- Remarks
- n/a
- QA comments
- source=unattached_crop
- Linked tables
- n/a
- Cloudinary URL
- Open image
Raw extracted data
{
"id": 5942,
"type": "",
"view-angle": "none",
"bbox": null,
"confidence_score": 0.35,
"remarks": null,
"qa-comments": "source=unattached_crop",
"column": "other",
"url": "https://res.cloudinary.com/laiuauox/image/upload/v1786272106/edapro/structural_drawings_pkg_1-cede2c5e58c24d1b92ee5a813c5fab4c/crops/structural_drawings_pkg_1_cede2c5e58c24d1b92ee5a813c5fab4c_p01_r01_key_plan.png",
"item_key": null,
"label": "KEY PLAN",
"caption": null,
"view_type": "other",
"section_label": null,
"region_kind": "drawing",
"drawing_number": null,
"scale": null,
"area": null,
"structure": null,
"structure_part": null,
"elements": [],
"identifiers": [],
"referenced_sheets": [],
"uncertainty_codes": [
"vision_clipped",
"vision_multiple_views",
"qa_left_clipped",
"qa_bottom_clipped",
"crop_classification_failed"
],
"tier": "balanced",
"identifier": null,
"discipline": "other",
"view_types": [
"other"
],
"linked_notes": null,
"linked_tables": null,
"shape_summary": null,
"merged_from": null,
"context": {
"page_number": 1,
"page_image_url": "https://res.cloudinary.com/laiuauox/image/upload/v1786272107/edapro/structural_drawings_pkg_1-cede2c5e58c24d1b92ee5a813c5fab4c/overlays/structural_drawings_pkg_1_cede2c5e58c24d1b92ee5a813c5fab4c_p01.png",
"sheet_title": "GENERAL ARRANGEMENT DRAWING FOR MAJOR BRIDGE AT CH. 64+412",
"chainages": [
"64+500",
"64+400",
"64+412",
"KM 64+000",
"KM 113+000"
],
"drawing_summary": "This sheet presents the General Arrangement drawing for a major bridge at Ch. 64+412 on the Indore Eastern Bypass project, showing half plans at deck level and foundation level (scale 1:300) with abutment/pier locations, carriageway widths, footpaths, RCC crash barriers, skew angle and span/skew dimensions. It also includes a key plan (scale 1:2000) showing the bridge alignment with ROW lines, retaining/toe walls, utility duct and pipe crossing near Ch.64+400–64+500, a legend of abbreviations, a hydraulic data table (discharge, freeboard, velocity, HFL, lowest bed level), and general notes on dimensions and units.",
"page_views": [
"other"
],
"page_region_kinds": [
"drawing",
"table"
],
"page_elements": [],
"country": null,
"drawing_type": "civil engineering drawings: bridges, highways, rail, structural, drainage, utilities, survey, geotechnical, grading, and site works",
"bbox_norm": [
0.5680507706255666,
0.0062761864044463475,
0.9904261106074344,
0.5435314236853356
],
"bbox_pixels": [
2447,
2200
],
"sheet_area_fraction": 0.2269,
"usage": {
"basis": "page_total_divided_by_crops",
"page_total_tokens": 28021,
"page_cost_usd": 0.10241,
"crops_on_page": 6,
"crop_tokens": 4670.2,
"crop_cost_usd": 0.017068
}
},
"page_id": 455,
"file_id": 101,
"project_id": "6a785787dd24f2bbc1bf6c60",
"token_count": 74840
}
KEY PLAN
DETAILS OF HYDRAULIC DATA
LEGEND
Object 5945
NOTES
B 1 E 27 IInd FLOOR MOHAN COOPERATIVE