processed
PDF files1
Pages3
Objects22
Processing100%
main viewer
Selected page objects
General Construction Specifications And Requirements90%+
Steel Diaphragms Standard Plan Modifications Grooved Concrete Chain Link Fence Welding Special Protective Coating Specifications90%+
Bridge Composition And Standard Details90%+
General Notes And Specifications For Protective Coatings Shop Drawings And Incidental Work Items90%+
General Notes Continued90%+
Abutment Soil Reinforcing Device Inserts Fill Settlement Piles Steel Diaphragms Approach Slab Modification Grooved Concrete Chain Link Fence Welding Protective Coating Incidental Items Construction Special Provisions And Pay Items90%+
Bridge General Requirements And Specifications90%+
Design Data And Bent Specifications For Bridge Piles90%+cropped image preview
CloseAbutment Soil Reinforcing Device Inserts Fill Settlement Piles Steel Diaphragms Approach Slab Modification Grooved Concrete Chain Link Fence Welding Protective Coating Incidental Items Construction Special Provisions And Pay Items

- Object
- Abutment Soil Reinforcing Device Inserts Fill Settlement Piles Steel Diaphragms Approach Slab Modification Grooved Concrete Chain Link Fence Welding Protective Coating Incidental Items Construction Special Provisions And Pay Items
- Explanation
- tabulated construction special provisions with pay item numbers, quantities and unit costs
- View
- notes, schedule
- Structure
- n/a
- Part of structure
- n/a
- Shows
- abutment soil reinforcing device inserts, fill settlement protection piles, steel diaphragms, approach slab expansion joint, grooved concrete deck, chain link fence, welding specifications, protective coating for piles, incidental construction items
- Component
- abutment_soil_reinforcing_device_inserts_fill_settlement_piles_steel_diaphragms_approach_slab_modification_grooved_concrete_chain_link_fence_welding_protective_coating_incidental_items_construction_special_provisions_and_pay_items
- Identifier
- n/a
- Section
- n/a
- Drawing no.
- n/a
- Scale
- n/a
- Discipline
- bridge_structural
- Accuracy
- 90%+
- Tier
- max
- Page
- 366
- Bounding box
- 0.346, 0.247, 0.792, 0.870
- Remarks
- No validated same-instance relation.
- QA comments
- review_required=True; mapping_relation=unresolved_singleton
- Linked tables
- n/a
- Cloudinary URL
- Open image
Raw extracted data
{
"id": 4719,
"type": "Substructure",
"view-angle": "none",
"bbox": [
0.34597058823529414,
0.24686363636363634,
0.7915294117647058,
0.8697272727272727
],
"confidence_score": 0.75,
"remarks": "No validated same-instance relation.",
"qa-comments": "review_required=True; mapping_relation=unresolved_singleton",
"column": "abutment_soil_reinforcing_device_inserts_fill_settlement_piles_steel_diaphragms_approach_slab_modification_grooved_concrete_chain_link_fence_welding_protective_coating_incidental_items_construction_special_provisions_and_pay_items",
"url": "https://res.cloudinary.com/laiuauox/image/upload/v1785753963/edapro/gdot_plan-d4fa640ccb0c4bbeaad5c0ecd7506e87/items/abutment_soil_reinforcing_device_inserts_fill_settlement_piles_steel_diaphragms_appro_5756cc232e.png",
"item_key": "abutment_soil_reinforcing_device_inserts_fill_settlement_piles_steel_diaphragms_appro_5756cc232e",
"label": "Abutment Soil Reinforcing Device Inserts Fill Settlement Piles Steel Diaphragms Approach Slab Modification Grooved Concrete Chain Link Fence Welding Protective Coating Incidental Items Construction Special Provisions And Pay Items",
"caption": "tabulated construction special provisions with pay item numbers, quantities and unit costs",
"view_type": "notes",
"section_label": null,
"region_kind": "notes",
"drawing_number": null,
"scale": null,
"area": "general notes and specifications",
"structure": null,
"structure_part": null,
"elements": [
"abutment soil reinforcing device inserts",
"fill settlement protection piles",
"steel diaphragms",
"approach slab expansion joint",
"grooved concrete deck",
"chain link fence",
"welding specifications",
"protective coating for piles",
"incidental construction items"
],
"identifiers": [
"207-0203",
"211-0200",
"500-0100",
"500-1011",
"500-2100",
"500-3002",
"507-9002",
"507-9003",
"511-1000",
"511-3000",
"520-1125",
"520-4125",
"523-1100",
"643-1152"
],
"referenced_sheets": [
"Section 551 Georgia DOT Specifications",
"Sub-section 500.3.05.T.9.C Georgia DOT Specifications",
"Section 520",
"Section 535",
"ASTM A 123",
"ASTM F3125",
"ASTM A563",
"ASTM F436",
"ASTM A 153",
"Roadway Plans"
],
"uncertainty_codes": [
"composite_scope",
"unreadable_text"
],
"tier": "max",
"identifier": null,
"discipline": "bridge_structural",
"view_types": [
"notes",
"schedule"
],
"linked_notes": null,
"linked_tables": null,
"shape_summary": {
"circle": 3,
"rectangle": 13,
"line_run": 12,
"polygon": 129,
"total": 157
},
"merged_from": null,
"page_id": 366,
"file_id": 68,
"project_id": "6a706fee4418133786fb61e9",
"token_count": 253867
}