processed
PDF files1
Pages3
Objects22
Processing100%
main viewer
Selected page objects
Bent Elevations And Stations90%+
Bridge Clearance And Alignment Specifications90%+
Bridge Bent Elevations And Vertical Curve Data90%+
Bridge Clearance Requirements And Calculations90%+
Vertical Curve Data90%+
Bridge Bent Elevations And Plan90%+
Bridge Clearance And Measurement Notes90%+
Sr 21 Pgl90%+
Bridge Bent Arrangement And Clearances90%+
Bridge Bent Elevation With Walls And Fence90%+cropped image preview
CloseBridge Clearance Requirements And Calculations

- Object
- Bridge Clearance Requirements And Calculations
- Explanation
- vertical and horizontal clearance requirements and calculations for left and right bridges measured along SR 21
- View
- notes
- Structure
- bridge over SR 21
- Part of structure
- general arrangement
- Shows
- minimum required vertical clearance, existing track vertical clearance, future track vertical clearance, minimum required horizontal clearance
- Component
- bridge_clearance_requirements_and_calculations
- Identifier
- n/a
- Section
- n/a
- Drawing no.
- 35-0001
- Scale
- n/a
- Discipline
- bridge_structural
- Accuracy
- 90%+
- Tier
- max
- Page
- 365
- Bounding box
- 0.500, 0.792, 0.787, 0.995
- Remarks
- No validated same-instance relation.
- QA comments
- review_required=True; mapping_relation=unresolved_singleton
- Linked tables
- n/a
- Cloudinary URL
- Open image
Raw extracted data
{
"id": 4711,
"type": "Substructure",
"view-angle": "none",
"bbox": [
0.49998823529411773,
0.7922545454545453,
0.7867764705882347,
0.9946545454545455
],
"confidence_score": 0.82,
"remarks": "No validated same-instance relation.",
"qa-comments": "review_required=True; mapping_relation=unresolved_singleton",
"column": "bridge_clearance_requirements_and_calculations",
"url": "https://res.cloudinary.com/laiuauox/image/upload/v1785753969/edapro/gdot_plan-d4fa640ccb0c4bbeaad5c0ecd7506e87/items/bridge_clearance_requirements_and_calculations_p01_r10.png",
"item_key": "bridge_clearance_requirements_and_calculations_p01_r10",
"label": "Bridge Clearance Requirements And Calculations",
"caption": "vertical and horizontal clearance requirements and calculations for left and right bridges measured along SR 21",
"view_type": "notes",
"section_label": null,
"region_kind": "notes",
"drawing_number": "35-0001",
"scale": null,
"area": "bridge approach",
"structure": "bridge over SR 21",
"structure_part": "general arrangement",
"elements": [
"minimum required vertical clearance",
"existing track vertical clearance",
"future track vertical clearance",
"minimum required horizontal clearance"
],
"identifiers": [
"SR 21",
"Left Bridge",
"Right Bridge"
],
"referenced_sheets": [],
"uncertainty_codes": [
"unreadable_text"
],
"tier": "max",
"identifier": null,
"discipline": "bridge_structural",
"view_types": [
"notes"
],
"linked_notes": null,
"linked_tables": null,
"shape_summary": {
"circle": 3,
"rectangle": 8,
"line_run": 6,
"polygon": 26,
"total": 43
},
"merged_from": null,
"page_id": 365,
"file_id": 68,
"project_id": "6a706fee4418133786fb61e9",
"token_count": 253867
}