processed
PDF files1
Pages2
Objects11
Processing0%
main viewer
Selected page objects
cropped image preview
CloseRoad Alignment Key Plan With Bridge Notes And Girder Cross Sections
No image
- Object
- Road Alignment Key Plan With Bridge Notes And Girder Cross Sections
- Explanation
- key plan of highway alignment near VUP with design notes and PSC girder cross sections
- View
- key_plan, notes, section, site_plan
- Structure
- VUP at chainage 1394+430
- Part of structure
- general arrangement
- Shows
- road centerline chainage markers, covered drain, open drain, houses, apartments, curve data table, culvert/bridge details table, boundary pillars, girder cross section (mid section), girder cross section (support section), notes text block
- Component
- road_alignment_key_plan_with_bridge_notes_and_girder_cross_sections
- Identifier
- n/a
- Section
- n/a
- Drawing no.
- n/a
- Scale
- 1:2000
- Discipline
- bridge_structural
- Accuracy
- 55%
- Tier
- balanced
- Page
- 380
- Bounding box
- 0.046, 0.011, 0.704, 0.569
- Remarks
- No validated same-instance relation.
- QA comments
- review_required=True; mapping_relation=unresolved_singleton
- Linked tables
- n/a
- Cloudinary URL
- n/a
Raw extracted data
{
"id": 5036,
"type": "Substructure",
"view-angle": "none",
"bbox": [
0.046,
0.011000000000000013,
0.704,
0.569
],
"confidence_score": 0.55,
"remarks": "No validated same-instance relation.",
"qa-comments": "review_required=True; mapping_relation=unresolved_singleton",
"column": "road_alignment_key_plan_with_bridge_notes_and_girder_cross_sections",
"url": null,
"item_key": "road_alignment_key_plan_with_bridge_notes_and_girder_cross_sections_p01_r02",
"label": "Road Alignment Key Plan With Bridge Notes And Girder Cross Sections",
"caption": "key plan of highway alignment near VUP with design notes and PSC girder cross sections",
"view_type": "key_plan",
"section_label": null,
"region_kind": "composite_drawing",
"drawing_number": null,
"scale": "1:2000",
"area": "alignment key plan",
"structure": "VUP at chainage 1394+430",
"structure_part": "general arrangement",
"elements": [
"road centerline chainage markers",
"covered drain",
"open drain",
"houses",
"apartments",
"curve data table",
"culvert/bridge details table",
"boundary pillars",
"girder cross section (mid section)",
"girder cross section (support section)",
"notes text block"
],
"identifiers": [
"1394+051.214 KM",
"1394+200",
"1394+300",
"1394+400",
"1394+500",
"PL1394/1",
"PL1394/2",
"1394+328",
"1394+430"
],
"referenced_sheets": [],
"uncertainty_codes": [
"composite_scope",
"ambiguous_boundary"
],
"tier": "balanced",
"identifier": null,
"discipline": "bridge_structural",
"view_types": [
"key_plan",
"notes",
"section",
"site_plan"
],
"linked_notes": "GENERAL ARRANGEMENT DRAWING OF VUP AT CHAINAGE 1394+430 (same page)",
"linked_tables": null,
"shape_summary": {
"circle": 19,
"rectangle": 4,
"line_run": 30,
"hatch": 9,
"polygon": 31,
"total": 93
},
"merged_from": null,
"page_id": 380,
"file_id": 76,
"project_id": "41",
"token_count": 106247
}