processed
PDF files1
Pages3
Objects8
Processing0%
main viewer
Selected page objects
cropped image preview
CloseEndfill Track Clearance Control Point

- Object
- Endfill Track Clearance Control Point
- Explanation
- n/a
- View
- detail
- Structure
- n/a
- Part of structure
- n/a
- Shows
- n/a
- Component
- endfill_track_clearance_control_point
- Identifier
- n/a
- Section
- n/a
- Drawing no.
- n/a
- Scale
- n/a
- Discipline
- rail
- Accuracy
- 90%+
- Tier
- n/a
- Page
- 84
- Bounding box
- 0.712, 0.182, 0.936, 0.345
- Remarks
- No validated same-instance relation.
- QA comments
- review_required=False; mapping_relation=unresolved_singleton
- Linked tables
- BENT ELEVATIONS (same page)
- Cloudinary URL
- Open image
Raw extracted data
{
"id": 1129,
"type": "Substructure",
"view-angle": "none",
"bbox": [
0.7120882352941176,
0.18177272727272725,
0.9355588235294118,
0.34504545454545454
],
"confidence_score": 0.8,
"remarks": "No validated same-instance relation.",
"qa-comments": "review_required=False; mapping_relation=unresolved_singleton",
"column": "endfill_track_clearance_control_point",
"url": "https://res.cloudinary.com/laiuauox/image/upload/v1785064149/edapro/gdot_drawing-844a0f817a824bc0805d75537a69cd22/items/endfill_track_clearance_control_point_p01_r03.png",
"item_key": "endfill_track_clearance_control_point_p01_r03",
"label": "Endfill Track Clearance Control Point",
"identifier": null,
"discipline": "rail",
"view_types": [
"detail"
],
"linked_notes": "NOTES: (same page); NOTES: (same page)",
"linked_tables": "BENT ELEVATIONS (same page)",
"shape_summary": {
"line_run": 4,
"polygon": 9,
"total": 13
},
"merged_from": null,
"page_id": 84,
"file_id": 36,
"project_id": "26"
}
Sr 21 Profile Grade Line
Sr 21 Profile Grade Line
Bridge 1
Track Clearance Envelope
Bridge No. 1 Lt And Rt
BENT ELEVATIONS
DOT INVENTORY CROSSING NO. / PROJECT P.I. NO. / BRIDGE NO.
NOTES:
DEPARTMENT OF TRANSPORTATION
NOTES: